July 1, 1996 Mr. William L. Stewart Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999 Phoenix, Arizona 85072-3999
SUBJECT:
SPENT FUEL POOL SURVEY COMMITMENTS FOR THE PALO VERDE NUCLEAR GENERATING STATION
Dear Mr. Stewart:
On February 12-13,
- 1996, we conducted a survey of design, current licensing
- bases, and operating practices related to the spent fuel pool cooling system.
During the survey, in discussions with your staff, several statements were made regarding changes that were needed to procedures or the UFSAR based on our survey and your own review.
Our understanding of these statements is provided in enclosure l.
We consider it necessary to obtain your formal commitment to these issues to assure appropriate documentation of your licensing basis for the spent fuel
- pool, and to assure that plant activities are conducted in accordance with that licensing basis.'ccordingly, we request that you provide a letter within 30 days of receipt of this letter that confirms these commitments, and also indicates the dates for completion of these actions or projected completion dates for actions not yet completed.
These commitments will then be tracked by the Regional office and followed up in future inspections.
If you have any questions regarding these
- items, please contact me at 301-415-1352.
Sincerely, Original signed by:
James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.
STN 50-528, STN 50-529, and STN 50-530
Enclosure:
Spent Fuel Pool Survey Commitments cc w/encl:
See next page 9607050059 96070f PDR ADQCK 05000528 P
PDR Docket File PUBLIC JRoe WBateman JClifford EPeyton JShea JStolz ACRS, T-2E26 PDIV-2 Reading
- OGC, 015B18
- KPerkins, WCFO
- JDyer, RIV
PDIV-2/PD Eey n
JC1 ifford:ye WBatema DATE
&jW/96 OFF q/ (/96 CIAL RECORD COP /
/96
~
~ ~
C I'
Jc H
J K
i!
July 1, 1996 Hr. William L. Stewart-Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999 Phoenix, Arizona 85072-3999
SUBJECT:
SPENT FUEL POOL SURVEY COHHITHENTS FOR THE PALO VERDE NUCLEAR GENERATING STATION
Dear Hr. Stewart:
On February 12-13,
- 1996, we conducted a survey of design, current licensing
- bases, and operating practices related to the spent fuel pool cooling system.
During the survey, in discussions with your staff, several statements were made regarding changes that were needed to procedures or the UFSAR based on our survey and your own review.
Our understanding of these statements is provided in enclosure 1.
Me consider it necessary to obtain your formal commitment to these issues to assure appropriate documentation of your licensing basis for the spent fuel
- pool, and to assure that plant activities are conducted in accordance with that licensing basis.
Accordingly, we request that you provide a letter within 30 days of receipt of this letter that confirms these commitments, and also indicates the dates for completion of these actions or projected completion dates for actions not yet completed.
These commitments will then be tracked by the Regional office and followed up in future inspections.
If you have any questions regarding these
- items, please contact me at 301-415-1352.
Sincerely, Original signed by:
James M. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.
STN 50-528, STN 50-529, and STN 50-530
Enclosure:
Spent Fuel Pool Survey Commitments cc w/encl:
See next page
~IEiRIBUTI Docket File PUBLIC JRoe MBateman JClifford EPeyton JShea JStolz ACRS, T-2E26 PDIV-2 Reading OGC, 015818
- KPerkins, WCFO
- JDyer, RIV
- DKirsch, MCFO KJohnston, RIV/SRI DOCUMENT NAME: PVSFPCHT.LTR OFC PDIV-2/LA PDIV- /
PDIV-2/PD EPey JClifford:ye MBatema DATE
&@%/96 g/ (/96 OFFICIAL RECORD COP /
/96
~
~
Hr. William L. Stewart cc w/encl:
Hr. Sieve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O.
Box 800
- Rosemead, California 91770 Senior Resident Inspector USNRC P. 0.
Box 40 Buckeye, Arizona 85326 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission Harris Tower
& Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064
- Chairman, Board of Supervisors ATTN:
Chairman 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Hr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Ms. Angela K. Krainik, Manager Nuclear Licensing Arizona Public Service Company P.O.
Box 52034
- Phoenix, Arizona 85072-2034 Hr. John C. Horne, Vice President Power Supply Palo Verde Services 2025 N. Third Street, Suite 220
- Phoenix, Arizona 85004
ENCLOSURE CONNITHENTS FOR POTENTIAL FOLLONUP FOR THE SPENT FUEL POOL SURVEY PALO VERDE NUCLEAR GENERATING STATION-The licensee identified the potential need to routinely monitor the performance of the fuel pool cooling system.
The licensee was pursuing this issue through the CRDR process.
The licensee committed to address a discrepancy between the UFSAR and procedure 410P-lPC01, "Fuel Pool Cooling," regarding the number of fuel pool cooling pumps needed for various conditions.
Procedure 410P-1PCOl, Section 3.0 stated that a single pump and two heat exchangers should be used to maintain fuel pool temperature less than 145 F prior to initiating SDC.
The UFSAR stated that this lineup should be used to maintain temperature less than 125 F, and that two pumps and two heat exchangers should be used above 125 F.
The licensee committed to review the UFSAR sections pertaining to the SFP to further verify the consistency between actual plant operation and VFSAR descriptions.
I B
i B
BP July 1, 1996 Hr. William L. Stewart Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999 Phoenix, Arizona 85072-3999
SUBJECT:
SPENT FUEL POOL SURVEY COMHITHENTS FOR THE PALO VERDE NUCLEAR GENERATING STATION
Dear Hr.,
Stewart:
On February 12-13,
- 1996, we conducted a survey of design, current licensing
- bases, and operating practices related to the spent fuel pool cooling system.
During the survey, in discussions with your staff, several statements were made regarding changes that were needed to procedures or the UFSAR based on our survey and your own review.
Our understanding of these statements is provided in enclosure 1.
We consider it necessary to obtain your formal commitment to these issues to assure appropriate documentation of your licensing basis for the spent fuel
- pool, and to assure that plant activities are conducted in accordance with that licensing basis.
Accordingly, we request that you provide a letter within 30 days of receipt of this letter that confirms these commitments, and also indicates the dates for completion of these actions or projected completion dates for actions not yet completed.
These commitments will then be tracked by the Regional office and followed up in future inspections.
If you have any questions regarding these
- items, please contact me at 301-415-1352.
Sincerely, Original signed by:
James Q. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects. III/IV Office of Nuclear Reactor Regulation Docket Nos.
STN 50-528, STN 50-529, and STN 50-530
Enclosure:
Spent Fuel Pool Survey Commitments cc w/encl:
See next page BRIIBIBBIIBB Docket File PUBLIC JRoe WBateman JClifford EPeyton JShea JStolz ACRS, T-2E26 PDIV-2 Reading OGC 015818
- KPerkins, WCFO
- JDyer, RIV
PDIV- /
JClifford:ye PDIV-2/PD WBatema DATE
&@%/96 OFF g/ (/96 CIAL RECORD COP /
/96
'I
,f II
Hr. William L. Stewart cc w/encl:
Hr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O.
Box 800
- Rosemead, California 91770 Senior Resident Inspector USNRC P. 0.
Box 40 Buckeye, Arizona 85326 Regional Administrator, Region IV U., S. Nuclear Regulatory Commission Harris Tower
& Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064
- Chairman, Board of Supervisors ATTN:
Chairman 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Hr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street
- Phoenix, Arizona 85040 Hs. Angela K. Krainik, Hanager Nuclear Licensing Arizona Public Service Company P.O.
Box 52034 Phoenix, Arizona 85072-2034 Hr. John C. Horne, Vice President Power Supply Palo Verde Services 2025 N. Third Street, Suite 220 Phoenix, Arizona 85004
ENCLOSURE COMMITMENTS FOR POTENTIAL FOLLOWUP FOR THE SPENT FUEL POOL SURVEY PALO VERDE NUCLEAR GENERATING STATION The licensee identified the potential need to routinely monitor the performance of the fuel pool cooling system.
The licensee was pursuing this issue through the CRDR process.
The licensee committed to address a discrepancy between the UFSAR and procedure 410P-1PC01, "Fuel Pool Cooling," regarding the number of fuel pool cooling pumps needed for various conditions.
Procedure 410P-lPCOl, Section 3.0 stated that a single pump and two heat exchangers should be used to maintain fuel pool temperature less than 145 F prior to initiating SDC.
The UFSAR stated that this lineup should be used to maintain temperature less than 125'F, and that two pumps and two heat exchanger s should be used above 125'F.
The licensee committed to review the UFSAR sections pertaining to the SFP to further verify the consistency between actual plant operation and UFSAR descriptions.