Forwards Insp Repts 50-528/96-01,50-529/96-01 & 50-530/96-01 on 960304-08 & 0422-26.No Violations Noted
ML17312A790
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/29/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17312A791 List:
References
NUDOCS 9606030178
Download: ML17312A790 (8)


See also: IR 05000528/1996001

Text

~gg REC(((

~G

~o

,.p 4

>>**<<<<

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

AR LINGTON, TEXAS 76011.8064

HAY 29 895

Arizona Public Service

Company

ATTN:

William L. Stewart

Executive Vice President.

Nuclear

P.O,

Box 53999

Phoenix.

Arizona

85072-3999

SUBJECT:

NRC INSPECTION REPORT 50-528/96-01:

50-529/96-01:

50-"530/96-01

This refers to the inspection

conducted

by Ms. L. J.

Smith and Mr. C. J.

Myers

of this office on March 4-8 and April 22-26,

1996. at the Palo Verde Nuclear

Generating Station,

Units

1

~ 2,

and 3. facility.

The purpose of the

inspection

was to determine whether activities authorized

by the license were

conducted safely and in accordance

with NRC requirements.

At the conclusion

of the inspection,

the findings were discussed

with those

members of your

staff identified in the enclosed

report.

Following the exit. the

NRC held

additional discussions

with your staff. including

a final discussion of the

results of the inspection

on May 24,

1996.

Areas

examined during the inspection are identified in the report.

Within

these

areas.

the inspection consisted of selective

examinations of procedures

and representative

records.

interviews with personnel,

and observation ot

activities in progress.

Your self-assessment

team concluded that your

engineering

and corrective action programs

were effective and improving.

Our

independent

inspection of your self-assessment

process

confirmed this

conclusion.

Therefore,

in accordance

with NRC Inspection

Procedure

40501,

"Licensee Self Assessments

Related to Team Inspections."

the

NRC plans

no

further inspection effort at the Palo Verde Nuclear Generating Station for

NRC

Inspection

Procedures

37550,

Engineering."

and 40500,

"Effectiveness of

Licensee Controls in Identifying. Resolving,

and Preventing

Problems'

" during

the current systematic

assessment

of licensee

performance cycle;

The inspectors

noted that your staff had not consistently translated

the

licensing basis for the nonessential

train of the auxiliary feedwater

system

into the design basis for the plant.

Your staff verbally committed to clarify

thei r position with respect to the use of this train.

Please

provide this

office with your written commitment within 30 days.

I

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice."

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sin

y;~

e

.-dim

omas

P.

Gwynp'.

Di ec or

Division of Reac

S fet

9606030l78

960529

PDR

ADQCK 05000528

8

PDR

i

h

I

Arizona Public Service

Company

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

Enclosure:

NRC Inspection Report

50-528/96-01:

50-529/96-01;

50-530/96-01

w/attachments

cc w/enclosure:

Arizona Corporation

Commission

ATTN:

Mr. Steve Olea

1200

W. Washington Street

Phoenix.

Arizona

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre,

Esq.

P.O.

Box 800

Rosemead,

California

91770

Arizona Radiation Regulatory Agency

ATTN:

Aubrey V. Godwin. Director

4814 South 40 Street

Phoenix,

Arizona

85040

Maricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix.

Arizona

85003

Arizona Public Service

Company

ATTN:

Angela

K. Krainik. Manager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

i

I

1'

Arizona Public Service

Company

-3-

E-Hail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.'y RIV:

L. J. Callan

ORP Director

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB, MS:

TWFN 9E10)

Resident

Inspector

DRS-PSB

HIS System

RIV File

M. Hammond

(PAO,

WCFO)

DOCUMENT NAME: r:i PViPV601RP.LJS

To receive copy ef docment, indleetilnbom

C

~ Copy without enctosures

K" ~ Copy with enclosures

N

No co

RIV:RI: EB

LJSmith/1mb

05/06/96

RI:EB

CJHyers

05/15/96

OR

C:PBF

D:DRS

C:EB

CAVanD

gh

05

/

PGwynn

TPGwynn

(

Dkirs

OFFICIAL RECORD

COPY

05/v+/9

05

/96

05

/96

1

Arizona Public Service

Company

E-Mail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DHB (IEOI)

bcc distrib.

by RIV:

L. J. Callan

DRP Director

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

DRS-PSB

MIS System

RIV File

M.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

r:g PV(PV601RP.LJS

To receive copy of docivnent, indicate in box: "C" I Copy without enciosures

"E"

Copy with enclosures

"H" ~ No co

RIV:RI: EB

LJSmith/1mb

RI: EB

CJHyers

C:EB

CAVanD

gh

D:DRS

TPGwynn

(

C:PBF

Dkirs

DR

PGwynn

05/06/96

05/15/96

05/>~/9

05

/

OFFICIAL R

CORD

COPY

05

/96

05

/96

,

J

l

N

l