ML17312A731
| ML17312A731 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/22/1996 |
| From: | Bateman W NRC (Affiliation Not Assigned) |
| To: | Stewart W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17312A732 | List: |
| References | |
| TAC-M91029, TAC-M91030, TAC-M91031, NUDOCS 9605010242 | |
| Download: ML17312A731 (8) | |
Text
April 22, 1996 e
I Mr. William L. Stewart Executive Vice President, Nuclear Arizona Public Service Company P.O.
Box 53999 Phoenix, Arizona 85072-3999
SUBJECT:
EVALUATION OF THE FIRST TEN-YEAR INTERVAL INSPECTION PROGRAM PLAN, REVISION 1, AND ASSOCIATED REQUEST FOR RELIEF FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (TAC NOS. M91029,
- M91030, AND M91031)
Dear Mr. Stewart:
The staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL), has completed its review of the information provided by Arizona Public Service Company in letters dated March 12,
- 1993, December 20,
- 1995, and March 5, 1996, related to the First Ten-Year Inservice Inspection (ISI) Program Plan, Revision 1,
and the associated, relief request.
The results of the staff review are provided in the enclosed Safety Evaluation (SE), with an attached Technical Evaluation Report 'from INEL.
With respect to relief request 7, the proposed al'ternative is authorized pursuant to 10 CFR 50.55a(a)(3)(i) provided that the licensee performs the leak test at the peak calculated containment pressure using test procedures that will detect a through-wall leakage in the pipe segments being tested.
The proposed alternative, when performed at the peak calculated containment pressure using test procedures that will detect a through-wall leakages in the pipe segments being tested, will provide an acceptable level of quality and safety.
Sincerely,
,Original, signed by:
Wiiliam H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.
STN 50-528, STN 50-529, and STN 50-530
Enclosure:
Safety Evaluation cc w/encl:
See next page DISTRIBUTION:
Docket File JRoe CThomas OGC GHill, (6) T5C3 PD4-2 Reading EGA1 LTran ACRS JMitchell, EDO PUBLIC WBateman EPeyton
- JDyer, RIV DOCUMENT NAME:
PV91029.REL OFC PDIV-2 LA PDIV-2 PM OG D:PD42 NAME DATE
'EI!~ey on 4l96 CThomas 4
96 96 WBatema 4
96 OFFICIAL RECORD COPY 96050Xoaea 9S04aa PDR ADOCK 05000528 PDR
E
)
".'.f]Q %9
April 22, 1996 Hr. William L. Stewart Executive Vice President, Nuclear Arizona Public Service Company P.O.
Box 53999
- Phoenix, Arizona 85072-3999
SUBJECT:
EVALUATION OF THE FIRST TEN-YEAR INTERVAL INSPECTION PROGRAM PLAN, REVISION 1, AND ASSOCIATED REQUEST FOR RELIEF FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (TAC NOS. H91029,
- H91030, AND H91031)
Dear Hr. Stewirt:
The staff, with technical assistance from its contractor, the Idaho National Engineering Labor atory (INEL), has completed its review of the information provided by Arizona Public Service Company in letters dated Harch 12,
- 1993, December 20,
- 1995, and Harch 5, 1996, related to the First Ten-Year Inservice Inspection (ISI) Program Plan, Revision 1,
and the associated relief request.
The results of the staff review are provided in the enclosed Safety Evaluation (SE), with an attached Technical Evaluation Report from INEL.
With respect to relief request 7, the proposed alternative is authorized pursuant to 10 CFR 50.55a(a)(3)(i) provided that the licensee performs the leak test at the peak calculated containment pressure using test procedures that will detect a through-wall leakage in the pipe segments being tested.
The proposed alternative, when performed at the peak calculated containment pressure using test procedures that will detect a through-wall leakages in the pipe segments being tested, will provide an acceptable level of quality and safety.
Sincerely,
.Original signed by:
William H. Baseman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.
STN 50-528, STN 50-529, and STN 50-530
Enclosure:
Safety Evaluation cc w/encl:
See next page ltl55UT S Docket File JRoe CThomas OGC GHill, (6) T5C3 PD4-2 Reading EGA1 LTran ACRS JHitchell, EDO PUBLIC WBateman EPeyton
- JDyer, RIV DOCUMENT NAME:
PV91029.REL OFC PDIV-2 LA NAME Be Ion DATE 4
I 96 OG PDIV-2 PH CThomas 4
96 OFFICIAL RECORD COPY 96 D:PD42 WBatema 4
96
0 I
pe RE+0
~o Cy ClO Vl 0
Cy
+~
gO
+p*y4 I
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 Apr i 1 22, 1996 Hr. William L. Stewart Executive Vice President, Nuclear Arizona Public Service Company P.O.
Box 53999 Phoenix, Arizona 85072-3999 SUNECT:
EVALUATION OF THE FIRST TEN-YEAR INTERVAL INSPECTION PROGRAH PLAN, REVISION 1, AND ASSOCIATED RE(VEST FOR RELIEF FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (TAC NOS. H91029,
- H91030, AND H91031)
Dear Hr. Stewart:
The staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL), has completed its review of the information provided by Arizona Public Service Company in letters dated Harch 12,
- 1993, December 20,
- 1995, and Harch 5, 1996, related to the First Ten-Year Inservice Inspection (ISI) Program Plan, Revision 1, and the associated relief request.
The results of the staff review are provided in the enclosed Safety Evaluation (SE), with an attached Technical Evaluation Report from INEL.
With respect to relief request 7, the proposed alternative is authorized pursuant to 10 CFR 50.55a(a)(3)(i) provided that the licensee performs the leak test at the peak calculated containment pressure using test procedures that will detect a through-wall leakage in the pipe segments being tested.
The proposed alternative, when performed at the peak calculated containment pressure using test procedures that will detect a through-wall leakages in the pipe segments being tested, will provide an acceptable level of quality and safety.
Sincerely, Docket Nos.
STN 50-528, STN 50-529, and STN 50-530
Enclosure:
Safety Evaluation cc w/encl:
See next page William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
I
Hr. William L. Stewart cc w/encl:
Hr., Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 T.
E. Oubre, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Senior Resident Inspector USNRC P. 0.
Box 40 Buckeye, Arizona 85326 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission Harris Tower
& Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064
- Chairman, Board of Supervisors ATTN:
Chairman 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Hr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street
- Phoenix, Arizona 85040 Hs. Angela K. Krainik, Hanager Nuclear Licensing Arizona Public Service Company P.O.
Box 52034 Phoenix, Arizona 85072-2034
t l.