Forwards Insp Repts 50-528/95-23,50-529/95-23 & 50-530/95-23 Conducted on 951211-15.No Violations Noted
ML17312A539
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/16/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17312A540 List:
References
GL-89-10, NUDOCS 9602220137
Download: ML17312A539 (10)


See also: IR 05000528/1995023

Text

<PS RECII+

+

~

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

AR I.INGTON, TEXAS 76011 8064

FEB I6 less

Arizona Public Service

Company

ATTN:

William L. Stewart

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix.

Arizona

85072-3999

SUBJECT:

NRC INSPECTION

REPORT 50-528/95-23:

50-529/95-23;

50-530/95-23

This refers to the inspection

conducted

by Messrs.

C. Hyers

and

H. Runyan of

this office on December

11-15

~

1995.

and January

8-12,

1996,

a't the Palo Verde

Nuclear

Generating Station

~ Units 1,

2,

and 3, facility.

The purpose of the

inspection

was to determine whether activities authorized

by the license were

conducted safely and in accordance

with NRC requirements.

At the conclusion

of the inspection,

the findings were discussed

with those

members of your

'taff identified in the enclosed

report.

Areas examined during the inspection are identified in the report.

The

inspection evaluated

the effectiveness

of your activities to ensure the

operability

and reliability of motor operated

valves in safety-related

systems

and to meet your commitments to Generic Letter 89-10 'Safety-Related

Motor-Operated

Valve Testing

and Surveillance."

Within these

areas,

the

inspection consisted of selective examinations of procedures

and

representative

records,

interviews with personnel.

and observation of

activities in progress.

The results of this inspection are summarized in the

enclosed

report.

Our inspectors

generally concluded that you had adequately

completed your

initial motor -operated

valve test activities.

However our veritication of

your efforts to complete Generic Letter 89-10 is contingent

upon you

providing. for NRC review, additional information and justification for

certain parts of the program.

Specifically you need to provide information

concerning your grouping of untested

motor-operated

valves,

the valve factor's

used in those groups'our

trending activities,

and the status of the open

findings from your recently completed self-assessment

of your motor-operated

valve program.

Your written response

to the items identified in Section

1 of

the enclosed

report is requested within 60 days of your

r eceipt of this

letter.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy

of'his

letter

and its enclosures will be placed in the

NRC Public Document

Room.

9602220137

960216

PDR

ADQCK 05000528

8

PDR

0

Arizona Public Service

Company

-2-

Should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincer

y,

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

homas

P.

Gwynn, ir tor

Division of React

afety

Enclosure:

NRC Inspection

Report

50-528/95-23:

50-529/95-23;

50-530/95-23

w/attachment

cc w/enclosure:

Arizona Corporation

Commission

ATTN:

Hr. Steve Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATM:

T.

E. Oubre,

Esq.

P.O.

Box 800

Rosemead.

Cali fornia

91770

Arizona Radiation Regulatory Agency

ATIN:

Aubrey V. Godwin, Director

4814 South 40 Street

Phoenix.

Arizona

85040

Naricopa

County Board of Supervisors

ATIN:

Chairman

ill South Third Avenue

Phoenix,

Arizona

85003

1

l

8

0

Arizona Public Service

Company

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chi ef Operating Officer

2025

N. 3rd Street,

Suite 220

Phoenix,

Arizona

85004

Akin, Gump. Strauss,

Hauer

and Feld

El Paso Electric Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire Avenue, Suite 400

Washington,

D'.C.

20036

Arizona Public Service

Company

ATTN:

Angela

K. Krainik, Manager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

f

1

'

Arizona Public Service

Company

E-Mail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRS-PSB

Branch Chief (DRP/F,

WCFO)

Senior project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB.

MS:

TWFN 9E10)

T. Scarbrough

(NRR)

E. Kelly (RI)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

M.

Hammond

(PAO.

WCFO)

J.

Jacobson

(RIII/DRS)

P. Frederickson

(RII)

g ~CP

DOCUMENT NAME:

R:K PVNPV523rp.CJM

To receive copy of document, indicate In box: "C" =

y without enctosure

"E""-py with enclosures "N" ~ No copy

RIV:RI: EB

RI:EB

C:EB

EMEB:NR

D:DRS

F:DRP

D:DRS

FRunyan

CJMyer

VanDenburgh

RWessma

TPGwyn

DKirsch

TPGwynn

Y

02/(

/96

02/I /9

02/

/96

02/07/96

02/

6

02/

96

2/

/9

210139

I

0

Arizona Public Service

Company

I'4-

E-Mail report to D. Nelson

(DJN)

E-Mail report to NRR Event Tracking System

(IPAS)

bcc to

DMB ( IEOl)

bcc distrib. by RIV:

L. J. Callan

DRS-PSB

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

IWFN 9E10)

T. Scarbrough

(NRR)

E. Kelly (RI)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

M.

Hammond

(PAO,

WCFO)

J.

Jacobson

(RIII/DRS)

P. Frederickson

(RII)

g p)g,c

f'OCUMENT

NAME:

R:t PV'iPV523rp.CJM

To receive copy of document, indicate in box: "C" = Q

y without enctosure

"E" =

py with enctosures "N" = No copy

RIV:RI: EB

RI:EB

!':EB

EMEB:NR

D:DRS

F:DRP

D:DRS

FRunyan

CJMyer

VanDenburgh

RWessma

TPGwyn

DKirsch

TPGwynn

Y

02/(2,/96

02/( /9

02/

/96

02/07/96

02/

6

02/

96

2/

/9