ML17311B298

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/95-19,50-529/95-19 & 50-530/95-19 on 951030-1103.No Violations Noted
ML17311B298
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/07/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17311B300 List:
References
NUDOCS 9512120061
Download: ML17311B298 (8)


See also: IR 05000528/1995019

Text

go~ 0<0u(

0

I )+

y**y0

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

OEG -T l995

Arizona Public Service

Company

ATTN:

William L. Stewart

Executive Vice President.

Nuclear

P.O.

Box 53999

Phoenix.

Arizona

85072-3999

SUBJECT:

NRC

INSPECTION REPORT 50-528/95-19:

50-529/95-19;

50-530/95-19

This refers to the inspection

conducted

by Hr. I. Barnes

and Ns.

K. D. Weaver

of this office on October

30 through

November 3.

1995, at the Palo Verde

Nuclear Generating

Stations

Units 1. 2.

and 3, facility.

The purpose of the

inspection

was to determine whether activities authorized

by the license were

conducted safely and in accordance

with NRC requirements.

At the conclusion

of the inspection.

the findings were discussed

with those

members of your

staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report and included

a follow-up to the

1994 steam generator

tube integrity review

(NRC Inspection

t

Reports

50-528;

529: 530/94-15

and 50-528;

529: 530/94-27)

and inservice

inspection.

Within these

areas.

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel'nd

observation of activities in progress.

The results of this

inspection

are documented

on page

1, in the enclosed

report.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice."

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection.

we will be pleased

to discuss

them with you.

Sincerely,

omas

P.

Gwynn,

D r'ec

r

Division of Reac

r S

et

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

95i2i20061 95i207

PDR

ADOCK 05000528

8

PDR

J

i

j

1

t

f

'(

l

0

Arizona Public Service

Company

-2-

Enclosure:

NRC Inspection

Report

50-528/95-19:

50-529/95-19:

50-530/95-19

w/attachments

cc w/enclosure:

Arizona Corporation

Commission

ATTN:

Mr. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre.

Esq.

P.O.

Box 800

Rosemead.

Cali forni a

91770

Arizona Radiation Regulatory Agency

ATTN:

Aubrey V. Godwin. Director

4814 South

40 Street

Phoenix,

Arizona

85040

Maricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix.

Arizona

85003

Palo Verde Services

ATTN:

Curtis Hoskins

~ Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Street,

Suite

220

Phoenix.

Arizona

85004

Akin, Gump, Strauss,

Hauer and Feld

El

Paso Electric Company

ATTN:

Roy P.

Lessey. Jr..

Esq.

1333

New Hampshire

Avenue. Suite 400

Washington.

O'.C.

20036

Arizona Public Service

Company

ATTN:

Angela

K. Krainik. Manager

Nuclear Licensing

P.O.

Box 52034

Phoenix.

Arizona

85072-2034

\\

e

I

f

t

0

Arizona Public Service

Company

-3-

E-Mail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/F.

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB.

MS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

M.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R: X PV'~PV519rp. i xb

To receive copy of document, indicate

I

x: "C" = Copy w'ut enclosures

"E"

Copy with enciosures

"N"

No copy

RIV:TA

IBarnes

12/

/95

DD:DRS

KEBro

man

12/

/95

D:DRS

TPGwynn

12/

/95

PBF:DRP

RHuey

12/

/9

D:DRS

TPGwynn

12/

/95

2/000~

0

I

l

i

I'

Arizona Public Service

Company

-3-

E-Mail report to D. Nelson

(DJN)

E-Mail report to NRR Event Tracking System

(IPAS)

bcc to

DMB ( IEOl)

bcc distrib. by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F,'WCFO)

Senior

Project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

M.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R:K PVNPV519rp.ixb

To receive copy of document, indicate i

x: "G"

Copy

out enclosures

"E" ~ Copy with enciosures "N"

No copy

RIV:TA

IBarnes

12/,

/95

DD:DRS

KEBro

man

12/

/95

D:DRS

TPGwynn

12/

/95

PBF:DRP

RHuey

12/

/9

D:DRS

TPGwynn

12/

/95

0