Advises of Planned Insp Effort Resulting from Palo Verde PPR Review.Encl Details Insp Plan for Next 8 Months
ML17311B271
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/08/1995
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 9511210078
Download: ML17311B271 (8)


Text

JIJ I

~

~ I*

~r t

NITEO STATES t NUC LEAR R EGULATORY COMKIISSION REGION IV

'Fj

~ I R+

~ PLAZA DRIVE, SUITE 400

'Li'.STOW TEXAS 76011 8064 "OV 8 $95 Arizona Public Service Company ATTN:

William L. Stewart Executive Vice President, Nuclear P.O.

Box 53999

Phoenix, Arizona 85072-3999

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) -

PALO VERDE NUCLEAR GENERATING STATION On October 4.

!995, the Regional staff completed the semiannual Plant Performance Review (PPR) of Palo Verde.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by Regional management to facilitate planning and alIlocation of inspection resources.

The PPR for Palo Verde involved the participation of all '.echnical divisions in evaluating inspection results and safety performance information for the period of April through September

1995, PPRs provide Regional management with a current summary of licensee performance and serve as

.nputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter aa;ises you of our planned inspection effort resulting from the Palo Verde PPR review.

It is provided to minimize the resource impact on your staff and to allow for scheduling confIicts and personnel availability to be resolved in advance of inspector arrival on site.

The enclosure details our inspection plan for the next 8 months.

The rationale or basis for each inspection ou 1de the core inspec-ion program is provided so that you are aware of the reason for emphasis n these program areas.

Resident inspections are not listea 5ue to their ongoing and continuous nature.

E We will inform vou of any changes

-.o the inspection plan.

If you have any questions.

please contact Randy Huey at (510) 975-0342......

Sin erely, J.

E. Dyer, Director Division aj Reactor Projects

9

".0 1

-51 4

Dockets.

50-=

50-"

50-=

Licenses:

HP=

NP HP 95ii2i0078 95ii08 PDR ADOCK 05000528 8

PDR

Arizona Public Service Company

Enclosure:

Inspection Plan CC:

Arizona Corporation Commission ATTN:

Mr. Steve Olea 1200 W. Washington Street

Phoenix, Arizona 85007 Southern California Edison Company ATTN:

T.

E. Oubre, Esq.

P.O.

Box 800

Rosemead, California 91770 Arizona Radiation Regulatory Agency ATTN:

Aubrey V. Godwin, Director 4814 South 40 Street

Phoenix, Arizona 85040 Maricopa County Hoard of Supervisors ATTN:

Chairman 111 South Third Avenue

Phoenix, Arizona 85003 Palo Verde Services ATTN:

Curtis Hoskins, Executive Vice President and Chief Operating Officer 2025 N. 3rd Street, Suite 220

Phoenix, Arizona 85004 Akin, Gump, Strauss.

Hauer and Feld El Paso Electric Company ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333 New Hampshire

Avenue, Suite 400 Washington, D.C.

20036 Arizona Public Service Company ATTN:

Angela K. Krainik, Manager Nuclear Licensing P.O.

Box 52034

Phoenix, Arizona 85072-2034

Arizona Public Service Company ~ADu8 (><<~)

bcc distrib.

by RIV:

'L. J.

Callan Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)

M.

Hammond (PAO, WCFO)

To receive copy of document, indicate in box:

C e Copy without enclosures E

e Copy with enclosures "N" a No copy C:DRP/F C

FRHuey*

D:WCFO KEPerkins*

C:DRP/TSS LAYandel

DRS TPGwynn D:DRP JEDye ll/01/95 11/01/95 11/

/95

  • previous y concurre 0

C AL COR CO 7

11

/95 11

/95

NDV 8 IN5 Arizona Public Service Company

~~ ZWd(~si) bcc distrib.

by RIV:

L. J. Callan Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F.

WCFO)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector MIS System RIV File Branctr',454f-"gDRP fTSS).

M."'Hammond (PAO, WCFO)

To receive copy of document. indicate in box: "C

= Copy without enclosures "E" a Copywith enclosures "N" m No copy C:DRP/F I

C D:WCFO IC:DRP/TSS

DRS D:DRP KEPerkins~

LAYandel FRHuey*

ll/Ol/95 'll/ /95 11/Ol/95

  • prev>ous y concurre 0

iC AL CORD CO Y

TPGwynn ll

/95 JEDye 11

/95

l

PALO VERDE NUCLEAR GENERATING STATION INSPECTION PLAN IP - Inspection Procedure il - Iemporary Instruction Core Inspection Hinimum NRC Inspection Program (mandatory all plants)

INSPECTION IP 82701 TI 2515-109 IP 81700 IP 81700 IP 60705 IP 60710 IP 86700 IP 83750 IP 40500 (1)

TITLE/

PROGRAH AREA Operational Status of Emergency Preparedness Program Inspect,ion Requirements tor Generic I ett.er 89-10 Physical Security Program Physical Security Program Preparation for Refueling Refueling Activities Spent Fuei Pool Activities Occupational Radiation Exposure Evaluation of Self-assessment Capability NUHBER OF INSPECTORS PLANNED INSPECTION-DATES

>>/27/95 12/1/95 12/>>-15/95 and I/8-12/96 12/>>-15/95 I/29/96 2/2/96 3/>>-15/96 and 3/25-29/96 3/18-22/96 4/1-12/96 TYPE OF INSPECTION-CONNENTS Core Inspection Area of Emphasis

- Finai review of the licensee's H()V program Core Inspection Core Inspection Regional Initiative - Review of refueling activities performed at Region IV sites Core Inspection Core Inspection IP 37550 (1)

Engineering and Hodifications 4/8-12/96 and 4/22-26/96 Core Inspection (I) These two inspections will be combined during the period 4/8-12/96.

Approximately eight inspectors will be onsite.