~ ~6 RE00
0
Cy
A.
I
Cl
C
O
0
~O
++*++
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION IV
611 RYANPLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011%064
m'T25
I $5
Arizona Public Service
Company
=ATTN:
William L. Stewart
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/95-16;
50-529/95-16;
50-530/95-16
AND
This refers to the inspection
conducted
by Hr. K. E. Johnston
and others of
this office on August
13 through September
23,
1995,
at the Palo Verde Nuclear
Generating Station,
Units 1,
2,
and 3, facility.
The purpose of the
inspection
was to determine
whether activities authorized
by the license
were
conducted safely
and in accordance
with NRC requirements.
At the conclusion
of the inspection,
the findings were discussed
with those
members of your
staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The enclosed report discusses
two issues
that highlight NRC concerns
with the
effectiveness
of the Palo Verde engineering organization
in resolving
technical
problems.
Both of these
issues
appear to indicate
a problem with
proper coordination of maintenance
engineers
with their system
and design
engineering
counterparts,.
In one instance,
clogging of drain lin'es caused
water to back into charging
pump lubricating oil on two occasions,
and
engineering failed to initiate
a timely or thorough evaluation of the cause of
the drain clogging problem.
Furthermore,
a condition report documenting
the
problem was not appropriately prioritized in accordance
with Palo Verde
procedures.
This appears
to be in violation of NRC requirements,
as specified
in the enclosed
Notice of Violation (Notice),
and is of concern since it
appeared
to contribute to the observed
engineering
evaluation
problems.
In another
instance,
engineering
personnel
did not perform
a thorough
evaluation of ground fault relay failures in 480 volt motor control center
breakers.
Although
a schedule for relay replacement
had
been established,
the
evaluation for replacement
did not consider risk significance or balance of
plant applications,
and the replacement
schedule
was allowed to slip without
additional
assessment.
You are required to respond to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
Your response
may reference
or
include previous docketed
correspondence, if the correspondence
adequately
addresses
the required
response.
After reviewing your response
to this
e
95i0300i92 95i025
ADQCK 05000528
8
Arizona Public Service
Company
-2-
G
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10
CFR, 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter, its enclosure(s),
and your response will be placed in the
NRC
Public Document
Room (PDR).
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Hanagement
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub.
L. No. 96.511.
Should you have
any questions
concerning this inspection,
we. will be pleased
to discuss
them with you.
Sincerely,
Dockets:
50-528
50-529
50-530
Licenses:
NPF-51
J.
E. Dyer, Director
Division of Reactor Projects
4
Enclosures:
1.
2.
NRC Inspection
Report
50-528/95-16;
50-529/95-16;
50-530/95-16
cc w/enclosure:
Arizona Corporation
Commission
ATTN:
Nr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T.
E. Oubre,
Esq.
. P.O.
Box 800
Rosemead,
91770
Arizona Public Service
Company
Arizona Radiation Regulatory
Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix, Arizona
85040
Haricopa County Board of Supervisors
ATTN:
Chairman
ill South Third Avenue
Phoenix,
85003
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025
N. 3rd Street,
Suite
220
Phoenix,
85004
Akin, Gump, Strauss,
Hauer
and Feld
El
Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue, Suite
400
D.C.
20036
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Manager
Nuclear Licensing
P.O.
Box 52034
Phoenix,
85072-2034
Arizona Public Service
Company
E-Hail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc to
DHB (I EOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
HIS System
RIV Fi1 e
Branch Chief (DRP/TSS)
H.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
To receive copy of document, indicate in bcx: "C" ~ Copy without en
sures
"E
~
p
with enclosures "N" ~ No copy
RIV:SRI:DRP
F
E
C:DRP
F
E
D:WCFO
D:DRP
KJohnston
10/19/95
RHue
10/19/
KPerkins
10/
C) /95
OFFICIAL
ECORD
COPY
JED
e
10/
/95
10/
/95
Arizona Public Service
Company
E-Hail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc ttPIIB~IED~1
bcc distrib.
by RIV:
L. J. Callan
ORSS-F IPB
Branch Chief (ORP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
H.
Hammond
(PAO,
WCFO)
OOCUHENT NAHE:
To receive copy of document, indicate inbox: "C" ~ Copy without en
sures
"E" ~
p
with enclosures "N" ~ No copy
RIV:SRI:DRP
F
E
KJohnston
10/19/95
C:DRP
F
RHue
10/19/
0:WCFO
KPerkins
10/
/95
D:DRP
JED
e
10/
95
10/
/95
3OOOn6
OFFICIAL
ECORD
COPY
t
~E>/
I
0
I ~
i
'
t