ML17311B234

From kanterella
Jump to navigation Jump to search
Transmits 60 Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves.
ML17311B234
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/10/1995
From: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03502-WLS-A, 102-3502-WLS-A, GL-95-07, GL-95-7, NUDOCS 9510240276
Download: ML17311B234 (8)


Text

PRIORITY 1 (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9510240276 DOC.DATE: 95/10/10 NOTARIZED: YES DOCKET N FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 P STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 R AUTH. NAME AUTHOR AFFILIATION STEWART,W.L. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Transmits 60 day response to GL 95-07, "Pressure Locking 6 Thermal Binding oF Safety-Related Power-Operated Gate Valves."

DISTRIBUTION CODE: A056D COPIES RECEIVED:LTR ENCL ( SIZE:

TITLE: Generic Ltr 95-07 Pressure Locking 6 T ermal Banding o Sa e y Rela I NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 Y

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/DRPE/PD1-1 1 1 PD4-2 PD 1 1 HOLIAN, B 1 1 TRAN,L 1 1 THOMAS,C 1 1 INTERNA ILE CENTER 0 1 1 NRR/EMEB/B 1 1 D EXTERNAL: NOAC 1 1 NRC PDR 1 1 NUDOCS ABSTRACT 1 1 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX. ARIZONA 85072-3999 WILLIAML. STEWART 102-03502-WLS/AKK/R JR EXECUTIVEVICE PRESIDENT NUCLEAR October 10, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 60-Day Response to NRC Generic Letter No. 95-07 The purpose of this letter is to transmit Arizona Public Service Company's (APS) 60-day response to NRC Generic Letter (GL) 95-07, "Pressure Locking and Thermal Binding Of Safety-Related Power-Operated Gate Valves," dated August 17, 1995. The GL requested licensees to provide, within 60 days, a written response indicating whether or not the requested action(s) will be implemented and to provide a schedule for completing the implementation.

APS is implementing the actions required by GL 95-07 with the following schedule:

~ The 90-day actions requested by the GL will be completed by November 13, 1995.

~ The 180-day actions requested by the GL will be completed by February 13, 1996.

As a result of pressure locking/thermal binding evaluations performed to date, APS plans to implement pressure locking prevention modifications on 3 Shutdown Cooling (SDC) valves, Sl-651/652/653, during Unit 3's upcoming fifth refueling outage. A fourth SDC valve, SI-654, is currently scheduled to be modified during Unit 3's sixth refueling outage. It is currently anticipated that a similar schedule for these valves will be used during Unit 1 and 2's sixth and seventh refueling outages. Corrective actions for any remaining valves identified by the ongoing evaluation will be developed and scheduled. These actions will be reported in the 180-day response.

<- >OQQ7 9510240276 951010 PDR ADOCK- 05000528 P PDR

,J M

U. S. Nuclear Regulatory Commission ATTN:,Document Control Desk GL 95-07 60-Day Response Page 2 Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.

Sincerely, WLS/AKK/R JR/rv cc: L. J. Callan K. E. Perkins B. E. Holian K. E. Johnston

, ~

STATE OF ARIZONA )

) ss.

COUNTY OF MARICOPA )

I, W. L. Stewart, represent that I am Executive Vice President - Nuclear, Arizona Public Service Company (APS), that the foregoing document has been signed by me on behalf of APS with full authority to do so, and that to the best of my knowledge and belief, the statements made therein are true and correct.

L. Stewart Sworn To Before Me This ~0~ Day Of@~1995.

(, jp Notary Public iirp<,,,, < C Commission Expires

'y

V ~

V ~

P I

1 l/g F.

~

~

M) J f

Wr, N