ML17311A982

From kanterella
Jump to navigation Jump to search
Informs That Review of Proposed Changes to Facility Quality Assurance Program Description Has Been Completed.Qa Program Description as Changed by 950410 Submittal Continues to Meet Requirements of 10CFR50,app B & Acceptable
ML17311A982
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/28/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 9507030075
Download: ML17311A982 (10)


Text

UNI7 E0 STATES CLEAR REGULATORY COMMISSI REGION IV 611 RYAN PLAZA ORIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 JVN 28 S95 Arizona Public Service Company ATTN:

William L. Stewart Executive Vice Presidents Nuclear P.O.

Box 53999

Phoenix, Arizona 85072-3999

SUBJECT:

PROPOSED CHANGE TO PALO VERDE NUCLEAR GENERATING STATION QUALITY ASSURANCE PROGRAH DESCRIPTION We have completed a review of your proposed change to the Palo Verde Nuclear Generating Station quality assurance program description, which you submitted in accordance with 10 CFR 50.54(a) by your Letter 102-03318-WLS/AKK/RJR, dated April 10.

1995.

The submittal proposed a reduction to your commitments for the review of quality-related work authorizing documents to determine the need for independent inspections.

The requested change would allow selected review of work authorizing'documents.by, the. Nuclear Assurance Organization, based on a graded approach.

to ensure that independent inspection points had been properly identified.

This would be in place of the Nuclear Assurance Organization reviewing all quality-related',work authorizing documents to determine the need for independent inspections.

Telephone conversations were held between Hr R. Pate of Region IV and Hr.

R. Kogalski of your staff on Hay 11 and 23.

1995'o discuss the proposed change.

Based on those discussions.

we understand that:

1.

The Palo Verde Nuclear Generating Station FSAR, Section 17.2.4.2. 1. 1

~

will also be changed to assign the responsibility for specifying independent inspections to the organization that initiates work implementing documents.

The Nuclear Assurance Organization will apply the graded approach described in FSAR, Section 17.2.2.3. for the selected review of the work authorizing documents to ensure that independent inspection points had been properly identified.

Our review of you.

proposed change.

as further clarified by the telephone discussion noted above.

determined that your quality assurance program description as changed by your April 10.

1995. submittal continues to meet the requi rements of 10 CFR Part 50, Appendix B, and is acceptable.

If our understanding of your proposed

changes, as noted above, is incor ect, please notify us immediately so that we can further review your request appropriately.

9507030075 950628 PDR ADOCK 05000528 P

PDR

Arizona Public Service Company Please contact Mr.

W.

P.

Ang, of my staff, at (510) 975-0310 with any questions you have regarding this matter.

Sin

ely, Dockets:

50-528 50-529 50-530 Licenses:

NPF-41 NPF-51 NPF-74 CC:

Arizona Corporation Commission ATTN:

Mr. Steve Olea 1200 W. Washington Street

Phoenix, Arizona 85007 Southern California Edison Company ATTN:

T.

E. Oubre.

Esq.

P.O.

Box 800

Rosemead, California 91770 Arizona Radiation Regulatory Agency ATTN:

Aubrey V. Godwin, Director 4814 South 40 Street Phoenix.

Arizona 85040 Maricopa County Board of Supervisors ATTN:

Chairman ill South Third Avenue

Phoenix, Arizona 85003 Palo Verde Services ATTN:

Curtis Hoskins, Executive Vice President and Chief Operating Officer 2025 N. 3rd Street.

Suite 220

Phoenix, Arizona 85004'kin.

Gump, Strauss, Hauer and Feld El Paso Electric Company ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333 New Hampshire Avenue. Suite 400 Washington.

D.C.

20036 homas P.

wynn, Di ec or Division of Rea Sa e

Arizona Public Service Company Arizona Public Service Company ATTN:

Angela K. Krainik. Manager

. Nuclear Licensing P.O.

Box 52034 Phoenix.

Arizona 85072-2034

~.

Arizona Public Service Company 4-E-Mail report to D. Sullivan (DJS)

E-Mail report to NRR Event Tracking System

( IPAS)

<<bcc to DMB -( IE01) - DRS.

DRP.

and Decommissioning bcc distrib.

by RIV L. J. Callan DRSS-FIPB Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Leah Tremper (OC/LFDCB, MS':

TWFN 9E10)

DRS AI File DRS AI 95-046 Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

Document Name: 0:tPVQAP595.RJP To receive copy of document, indicate in box: "C" Copy without enclosures "E"

Copy with enclosures "N" No copy Previousl concurred*

C:PSB PSB:WCFO RJPate*

06/19/95

  • revious y concurre WPAng*

06/19/95 0:DRS TPGwynn*

06/28/95 AL D:

P AB 06/

/95 0:DRS TPGwynn 06/

/95 I

0

Arizona Public Service Company E-Mail report to D. Sullivan (DJS)

E-Mail report to NRR Event Tracking System

( IPAS) bcc to DMB ( IE01)

DRS, DRP.

and Decommissioning I

bcc distrib.

by RIV L. J. Callan DRSS-FIPB Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

DRS AI File DRS AI 95-046 Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

Document Name: 0:tPVQAP595.RJP To receive copy of document, indicate In box: "C" Copy without enclosures "E"

Copy with enclosures "N" No copy Previousl concurred*

C:PSB PSB:WCFO RJPate*

06/19/95 revious y concurre WPAn

  • 06/19/95 D:DRS TPGw nn*

06/28/95 D:

P AB 06/

/95 D:DRS TPGwynn 06/

/95