ML17311A940

From kanterella
Jump to navigation Jump to search
Forwards PVNGS Unit 3 M5 SG EC Exam Mid-Cycle Outage Dec 1994. Unit 3 SGs Inspected During Months of Nov & Dec 1994, EC Testing Technology Comprised of Both Bobbin Coil Probe & Motorized Rotating Pancake Coil Probe
ML17311A940
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/07/1995
From: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17311A942 List:
References
102-03389-WLS-S, 102-3389-WLS-S, NUDOCS 9506160130
Download: ML17311A940 (4)


Text

PRIC)RI EY (ACCELERATED RIDS PROCI:.SSIXG REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9506160130 DOC.DATE: 95/06/07 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION STEWART,W.L. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION P Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "PVNGS Unit 3 M5 SG EC Exam Mid-Cycle Outage Dec 1994." Unit 3 SGs inspected during months of Nov & Dec 1994, EC testing technology comprised of both bobbin coil probe &

motorized rotating pancake coil probe.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution JENCL 3 SIZE: + 09 0 NOTES:Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 THOMAS,C 1 1 INTERNAL: ACRS 6 6 CENTER 01 1 1 NRR/DE/EMCB 1 1 NRR/DRC 1 1 NRR/DSSA/SPLB 1 1 NRR/DS SA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

C NOTE TO ALL"RIDS" RECIPI EN I':

PLEASE HELP US TO REDUCE AVKSTE! CONTACT'I'HE DOCL'WIENT CON'TROL DESh, ROONI PI-37 <L'XT. 504- 083 ) TO ELDIINATLYOUR %ANIL'ROll DISTRIBUTION LIS'I'S I'OR DOCL'NIEN'I'S YOI 'ON" I'L'I D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17

I II

Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX. ARIZONA 85072-3999 WILLIAML. STEWART 102-03389-WLS/SAB/JRP EXECUTIVE VICE PRESIDENT NUCLEAR June 7, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No. STN 50-530 Steam Generator Eddy Current Examination Midcycle Outage (U3M5)

In accordance with Technical Specification Section 4.4.4.5b, enclosed please find the Unit 3 Steam Generator Eddy Current Examination Report for the Midcycle Outage (U3M5). The Unit 3 steam generators were inspected during the months of November and December 1994, using eddy current testing technology comprised of both bobbin coil probe and motorized rotating pancake coil (RPC) probe. Multiple configurations of 3 coil RPC probes and Plus Point RPC probes were used for the detection and characterization of axial and circumferential indications. The ECT examinations resulted in plugging a total of 12 tubes in steam generator 31 and 19 tubes in steam generator

32. No circumferential indications were identified during this outage.

Should you have any questions, please call Scott A. Bauer at (602) 393-5978.

N Sincerely, WLS/SAB/JRP/rv Enclosure CC: L. J. Callan K. E. Perkins B. E. Holian K. E. Johnston I. Barnes 9506160130,950607 PDR ADOCK i05000530 9 PDR

J'g I'