Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
gt
',h PRIORI (ACCELERATED RI DS CY P ROC ESSIVE 1
G)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:9506130442 DOC.DATE: 95/06/09 NOTARIZED: NO DOCKET IL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION STEWART,W.L. Arizona Public Service Co. (formerly Arizona Nuclear Power P RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R
SUBJECT:
Responds to NRC 950512 ltr re deviation noted in insp repts 50-528/95-06,50-529/95-06 & 50-530/95-06.Corrective actions:
GTG operating procedures (550P-OGT01 & 55OP-OGT02) revised &
simplified. 0'.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES
,r'-
ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 HOLIAN, B 1 1 TRAN,L 1 1 THOMAS,C 1 1 AL: ACRS 2 2 AEOD/DEIB 1 1 AEOD/SPD/RAB 1 1 Q9pJJX'- 1 1 DEDRO 1 1 1 1 NRR/DISP/PIPB 1 1 NRR/DORS/OEAB 1 1 D NRR/DRCH/HHFB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS2 1 1 RGN4 FILE 01 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 C
U E
YOTE TO ALL"RIDS" RECIPIENTS.
PLE:KSE HELP I.'S TO REDUCE O'KSTE! COi'TACT'I'IIE DOCL'i!E4'I COYTROI.
DESK, ROOXI Pl-37 (EXT 5%-2083 ) TO ELI XII%ATE YOUR XAifE I'ROTI DIS'I'RIBU'I'IOiLIS'I'S I'OR DOCI.'NIEX'I'S YOL'ON "II'I'.I)!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21
I f
Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX. ARIZONA 85072.3999 WILLIAML, STEWART 102-03390-WLS/AKK/DLK EXECUTIVEVICEPAESIOENI NUCLEAA June 9, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Reply to Notice of Deviation 50-528/529/530/95-06-02 Arizona Public Service Company (APS) has reviewed NRC Inspection Report t
50-528/529/530/95-06 and the Notice of Deviation (NOD) dated May 12, 1995. The events that led to an automatic trip of the Station Blackout Gas Turbine Generator (GTG) output breaker were the result of ineffective test control, human error, and poor communications.
APS has taken action to reinforce management's expectations for command and control of such evolutions and to enhance the training provided to GTG operators. We are confident that the GTG operators are fully capable of operating the GTGs to mitigate the effects of a Station Blackout.
APS'esponse to the NOD is enclosed. Enclosure 1 to this letter is a restatement of the NOD. APS'esponse is provided in Enclosure 2. Should you have any further questions, please contact Ms. Angela K. Krainik at (602) 393-5421.
Sincerely, WLS/AKK/DLK/pv
Enclosures:
- 1. Restatement of the Notice of Deviation
- 2. Reply to the Notice of Deviation cc: L. J. Callan B. E. Holian K. E. Johnston K. E. Perkins 950b150442 950b09 PDR ADOCK 05000528 PDR
l~
t e
ENCLOSURE 1 RESTATEMENT OF NOTICE OF DEVIATION50-528/529/530/95-06-02, NRC INSPECTION CONDUCTED FEBRUARY 26 THROUGH APRIL 8, 1995 INSPECTION REPORT Nos. 50-528/529/530/95-06
0 1
i I
Restatement of Notice of Deviation 50-528/529/530/95-06-02 During an NRC inspection conducted on February 26 through April 8, 1995, a deviation of your Updated Final Safety Analysis Report was identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the deviation is listed below:
The Palo Verde Updated Final Safety Analysis Report, Section 17.2F.6, provides Quality Assurance commitments for station blackout coping equipment.
Section 17.2F.6.3.2.3, "Instructions, Procedures, and Drawings," states, in part, that "...tests...for compliance with 10 CFR 50.63 shall be prescribed by documented instructions, procedures, and drawings and shall be accomplished in accordance with these documents."
In partial implementation of these commitments, Procedure 70TP-2GT02, Revision 0, "GTG Parallel Operation With Nonclass 1E Loads," provided the instructions for testing the gas turbine generators (GTGs). Step 8.1.11.1 states, in part, to complete Section 6.4 of Procedure 55OP-OGT01, "Gas Turbine Generator 1 Operating Instructions," prior to paralleling GTG P1 to offsite power.
Procedure 55OP-OGT01, Section 6.4, Step 6.4.3.1, specifies that the operator ensure that the GTG 1 speed control isoch/droop switch is in the droop position.
Contrary to the above, on March 9, 1995, prior to paralleling GTG 1 to offsite power, a nonlicensed operator did not accomplish testing of station blackout coping equipment (the GTGs) in accordance with test instructions in that he did not ensure that the GTG 1 speed control isoch/droop switch was in the droop position. The switch remained in the isoch position and as a result GTG 1 tripped when it was paralleled to offsite power.
Page1 of1
0 I
ENCLOSURE 2 REPLY TO NOTICE OF DEVIATION50-528/529/530/95-06-02 NRC INSPECTION CONDUCTED FEBRUARY 26 THROUGH APRIL 8, 1995 INSPECTION REPORT Nos. 50-528/529/530/95-06
I(
l l
REPLY TO NOTICE 'OF DEVIATION50-528/529/530/95-06-02 Reason for Deviation On March 9, 1995, Arizona Public Service Company (APS) was conducting a post-modification test on the Gas Turbine Generators (GTGs) that were installed to comply with the Station Blackout (SBO) requirements of 10CFR50.63. During the test, a procedural step was inadvertently omitted, and as a result, the GTG-1 output breaker tripped when Unit 2 Control Room operators attempted to synchronize the GTG with offsite power.
Procedure 70TP-2GT02, "GTG Parallel Operation with Non-Class 1E Loads,"
was being conducted to demonstrate proper parallel operation of the two GTGs while operating with isolated non-class 1E plant loads. Successful completion of the test required a coordinated effort by the Test Director (TD), an operator in the GTG Control Room, and Unit 2 Control Room operators. The GTGs are classified as Quality Augmented, and the applicable Quality Assurance requirements are defined in Section 17.2F.6 of the Palo Verde Nuclear Generating Station (PVNGS) Updated Final Safety Analysis Report (UFSAR), "Quality Assurance for Station Blackout Coping Equipment."
During normal conditions, the GTGs are under the operational control of the Water Reclamation Facility (WRF); however, during the post-modification testing being performed on March 9, 1995, a TD was assigned to conduct and control the testing activities and a WRF operator was assigned to assist. The test was being controlled from the GTG Control Room which is located outside the power block in close proximity Page 1 of 4
I l
f
)
l
h owever, during the testing activities being performed on March 9, 1995, the number of individuals in the GTG Control Room, most of whom were observers, ranged from 9 to 12.
During the test, the TD directed the WRF operator to coordinate with the Unit 2 Control Room and complete section 6.4 (Offsite Power Restoration) of Procedure 55OP-OGT01, "Gas Turbine Generator C1 Operating Instructions." Section 6.4 included steps to ensure the speed control ISOCH/DROOP switch was placed in the DROOP position and to synchronize GTG-1 with offsite power. The WRF operator became distracted while performing Section 6.4 and inadvertently omitted the step that ensured the speed control switch was placed in the DROOP position. He continued to t coordinate with the Unit 2 Control Room to synchronize GTG-1 with offsite power. The TD was not expecting the GTG to be synchronized with offsite power since he knew that the switch had not yet been placed in the DROOP position. Unit 2 Control Room operators synchronized GTG-1 with offsite power with the speed control switch in the t
ISOCH position instead of the DROOP position, and the GTG output breaker tripped.
Omitting the step in the GTG operating procedure to ensure that the speed control switch was in the DROOP position was a failure to comply with the procedure and a deviation from commitments made in section 17.2F.6 of the PVNGS UFSAR.
Page 2 of 4
l The reasons for the deviation were poor work/test practices that can be summarized as follows:
The WRF operator did not fully understand his accountabilities relative to his support function during the performance of testing activities.
~ The WRF operator assumed that procedural compliance would be maintained through the directions given by the TD.
~ The WRF operator was "rushed" during the test, reducing his attention to detail while operating the GTG.
~ The WRF operator became distracted during the test by the continuous interruptions from the telephone and questions and comments from individuals observing the test.
0 The TD did not adequately control testing activities.
~ No formal pre-test briefing was held with the WRF operator or Unit 2 Control Room personnel prior to starting the test.
~ The number of individuals in the GTG Control Room was not limited, and as a result, confusion and anxiety were present in the GTG Control Room at the time of the test.
~ Formal communications, including repeat backs, between the TD the WRF operator and the Unit 2 Control Room were not enforced.
Page 3 of 4
t Corrective Actions Taken and Results Achieved Following the GTG-1 output breaker trip on March 9, 1995, the post-modification test was stopped and both GTGs were returned to standby. Subsequently, APS II[
management expectations relative to command and control over t'esting activities were discussed with the TD. The WRF GTG operators were briefed on management expectations regarding operational control accountabilities associated with the GTGs, viewed a video titled "PV Operations Department Principles and Standards," and were provided formal training on GTG operation. The training included job performance measures, command and control expectations, procedural adherence, self-verification checking techniques, formal communications, and the Stop, Think, Act, and Review (STAR) program.
The GTG operating procedures (55OP-OGT01 and 55OP-OGT02) were revised and simplified. The revision in effect on March 9, 1995, contained several notes and cautions that complicated the procedure.
Corrective Actions That Will Be Taken to Avoid Further Deviations The actions discussed above are sufficient to avoid further deviations.
Date When Full Com liance Will Be Achieved Full compliance was achieved on March 10, 1995, when post-modification testing was successfully performed.
0 Page 4of4
l i