ML17311A840

From kanterella
Jump to navigation Jump to search
Forwards Rept That Discusses SG Tube Plugging That Occurred in Unit 3 During Midcycle Outage
ML17311A840
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/25/1995
From: Krainik A
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03330-AKK-K, 102-3330-AKK-K, NUDOCS 9505040049
Download: ML17311A840 (6)


Text

PRIORITY I ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9505040049 DOC.DATE: 95/04/25 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION KRAINIK,A.K.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards rept that discusses SG tube plugging that occurred in Unit 3 during midcycle outage.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution NOTES:Standardized plant.

05000530 RECIPIENT ID CODE/NAME PD4-2 LA THOMAS,C COPIES LTTR ENCL 1

1 1

1 RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1

1 INTERNAL ACRS NMSS/DWM/LLDP NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 CZHXE~O 2

2 RR/DE/EMCB 1

1 NRR/DSSA/SPLB 1

1 NUDOCS-ABSTRACT 1

0 1

1 1

1 1

1 1

1 EXTERNAL: NOAC 1

1 NRC PDR 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE IVASTE!CONTACI TIIE DOCL'CLIENT CONTROL DESK, ROOK! Pl-37 (EXT. 504-2083 ) TO ELIXIIVATEYOUR NAIIEFROII DISTRIBUTIONLISTS I:OR DOCD $ENTS YOU DON"I'LED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 19

,4 i

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034

~

PHOENIX, ARIZONA85072-2034 102-03330-AKK/KR April 25, 1995 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No. STN 50-530 (Ucense No. NPF-74)

Reporting of Steam Generator Tube Plugging for the Unit 3 Mldcycle Outage The enclosed report discusses steam generator tube plugging that occurred in Unit 3 during the midcycle outage.

If you have any questions, please contact Scott A. Bauer, Section Leader, Nuclear Regulatory Affairs, at (602) 393-5978.

Sincerely, Angela K. Krainik, Department Leader Nuclear Regulatory Affairs AKK/KR/pv Enclosure cc:

B. E. Holian (all w/enclosure)

L. J. Callan K. E. Perkins K. E. Johnston "950504004'P 950425 PDR ADDCK,05000530 PDR

ps+

Tt 4

A 11

+f gt f

h I

Cl 4

PALO VERDE NUCLEAR GENERATING STATION UNIT 3 STEAM GENERATOR TUBE PLUGGING LIcense No. NPF-74 Docket No. 50-530 This report is being provided to report the number of steam generator tubes plugged during the Unit 3 midcycle outage.

On December 12, 1994, Unit 3 was in Mode 5 (COLD SHUTDOWN) during a midcycle outage when an eddy current inspection of both steam generators was completed.

The inspection resulted in the plugging of twelve (12) tubes in Steam Generator No. 1 and nineteen (19) tubes in Steam Generator No. 2.

r

~"