ML17311A602
| ML17311A602 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/31/1995 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Stewart W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17311A603 | List: |
| References | |
| NUDOCS 9502070172 | |
| Download: ML17311A602 (6) | |
Text
gpss >rg(g
~C 0
'1
<<4 0 +*+'*~
1 UNITED STATES NUCLEAR REGULATORY COMM ON REGION IV 611 RYAN PLA2A DRIVE. SUITE 400 ARLINGTON,TEXAS 76011 6064 I I0r Arizona Public Service Company ATTN:
William L. Stewart Executive Vice President, Nuclear P.O.
Box 53999
- Phoenix, Arizona 85072-3999
SUBJECT:
PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE COMPANY (APS)
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE This refers to the management
- meeting, open to public observation, conducted on January 26, 1995, at the Palo Verde Nuclear Generating Station, concerning the Systematic Assessment of Licensee Performance (SALP) Report issued to APS on January 12, 1995.
Attendees at the meeting are listed in Attachment 1 to this letter.
Our presentation slides used during the meeting are included as Attachment 2 to this letter.
The purpose of this meeting was to discuss the NRC's assessment of licensee performance for the period of June 1,
- 1993, through November 30, 1994.
- Overall, we found that the plant continued to be operated safely and activities were directed to improving safety.
We believe the discussions during the meeting assisted you in more fully understanding the basis for our assessment and the areas we believe need improvement.
We appreciated your openness and candor regarding the SALP report and the areas needing improvement.
During the meeting, you described actions being taken to improve those areas noted in the SALP report and we encourage your staff to continue 'these efforts.
In accordance with 10 CFR'.790 of the NRC's "Rules of Practice,"
a copy of this letter will be placed in the NRC's Public Document
- Room, Should you have any questions concerning this matter, we will be pleased to discuss them with you.,'incerely;-
A. Bill Beach, Director Division of Reactor Projects Dockets:
50-528 50-529 50-530
~ Tg fl
~
~ 'i
~
'502070.172 95013'1 PDR ADOCK 05000528 P
Arizona Public Service Company bcc:
DMB IE 40 and IE 45 bcc distrib.
by RIV:
L. J. Callan DRSS-FIPB Branch Chief (DRP/F, WCFO)
Senior Project Inspector (DRP/F, WCFO)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)
B. Henderson (PAO, WCFO)
DOCUMENT NAME:
To receive copy of document, indicete in boxt e Copy without enctosures "E" e Copy with enctosures N" ~ No copy C:DRP/F HJWong Ol/
/95 D/WCFO KEPerkins OI/n /95 DD:DRP JEDyer 01/ I /95 D:DRP BBeach Ol/5//95 01/
/95
Arizona Public Service Company Licenses:
Enclosures:
1.
Attendance List 2.
Presentation Slides CC:
Arizona Corporation Commission ATTN:
Mr. Steve Olea 1200 W. Washington Street
- Phoenix, Arizona 85007 Southern California Edison Company ATTN:
T.
E. Oubre, Esq.
P.O.
Box 800
- Rosemead, California 91770 Arizona Radiation Regulatory Agency ATTN:
Aubrey V. Godwin, Director 4814 South 40 Street
- Phoenix, Arizona 85040 Maricopa County Board of Supervisors ATTN:
Chairman 111 South Third Avenue
- Phoenix, Arizona 85003 Palo Verde Services ATTN:
Curtis Hoskins, Executive Vice President and Chief Operating Officer 2025 N. 3rd Street, Suite 220
- Phoenix, Arizona 85004 Akin, Gump, Strauss, Hauer and Feld El Paso Electric Company ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333 New Hampshire Avenue, Suite 400 Washington, D.C.
20036 Arizona Public Service Company ATTN:
Angela K. Krainik, Manager Nuclear Licensing P.O.
Box 52034
- Phoenix, Arizona 85072-2034
Arizona. Public Service Company JAN 3 I l995 bcc:
DMB IE 40 and IE.45 bcc distrib.
by RIV:
L. J. Callan DRSS-FIPB Branch Chief (DRP/F, WCFO)
Senior Project Inspector (DRP/F, WCFO)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)
B. Henderson (PAO, WCFO)
DOCUMENT NAME:,
To receive copy of document, indicete in box: " " ~ Copy without enclosures E
~ Copy with enctosures N" ~ No copy C:DRP/F HJWong Ol/
/95 0/WCFO KEPerkins 01/
/95 DD:DRP JEDyer Ol/ I /95 0:DRP BBeach Ol/3//95 Ol/
/95
ATTACHMENT 1 ATTENDANCE AT MEETING NRC/APS ON JANUARY 26, 1995 Arizona Public Service Com an W. Stewart, Executive Vice President J. Levine, Vice President, Nuclear Production J. Bailey, Assistant Vice President, Nuclear Engineering B. Simpson, Vic'e President, Nuclear Support C.
- Seaman, Director, Nuclear Assurance D. Mauldin, Director, Site Maintenance and Modification
-W, Ide, Director, Site Operations NRC Attendees J.
Montgomery, Deputy Regional Administrator J.
Dyer, Deputy Director, Division of Reactor Projects E.
- Adamsam, Deputy Director, Division of Reactor Projects, III/IV, NRR H. Wong, Chief, Reactor Projects, Branch F
B. Holian, Project Manager, NRR K. Johnston, Senior Resident Inspector A. MacDougall, Resident Inspector B. Henderson, Public Affairs Officer D. Kunihiro, State Liaison Officer