Forwards Insp Repts 50-528/94-35,50-529/94-35 & 50-530/94-35 on 941115-1216 & Notice of Violation
ML17311A573
Person / Time
Site: Palo Verde  
Issue date: 01/11/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17311A574 List:
References
NUDOCS 9501180106
Download: ML17311A573 (10)


See also: IR 05000528/1994035

Text

3 pR RE0II

~C

'tp0

p 1~

)

0O

I

~ .';

Vl

Y/

x~P

qO

+**~4

UNIT E D STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

Arizona Public Service

Company

ATTN:

William L. Stewart

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix.

Arizona

85072-3999

SUBJECT:

NRC INSPECTION REPORT 50-528/94-35:

50-529/94-35:

50-530/94-35

AND

NOTICE OF VIOLATION

This refers to the inspection

conducted

by Dr. Dale A. Powers

and the

personnel

identified in the enclosed

report

on November 15-17,

November

29

through December

2.

and in-office review until December

16,

1994.

The

insoection included

a review of activities authorized for your Palo Verde

Nuclear Generating Station,

Units

1

~ 2,

and 3. facility.

At the conclusion of

the inspection.

the findings were discussed

with those

members of your staff

identified in the enclosed

report.

Areas examined during the inspection

are identified in the report.

These

areas

included followup of Licensee

Event Report 528;

529; 530/94-002-00

and

its two supplements'hich

discussed

Technical Specification limiting

conditions for operation that were not supported

by safety analysis.

Within

these areas'he

inspection consisted of selective examinations of procedures

and representative

records.

and interviews with personnel.

The purpose of the

inspection

was to determine whether activities authorized

by the license were

conducted safely

and in accordance

with NRC requirements.

Based

on the results of this inspections

certain licensed activities appeared

to be in violation of NRC requi rements,

as specified in the enclosed

Notice of

Violation (Notice).

The violation is of concern

because it reflects

a lack of

timeliness in notifying senior licensee

management

to ensure the prompt

resolution of an engineering technical

issue involving the adequacy of

Technical Specifications for core performance.

However, this specific example

of a violation is much less important than the historical untimeliness

associated

with many of the issues that were discussed

in Licensee

Event

Report 528:

529; 530/94-002-00

and its supplements.

One of the reported

issues

became

apparent to your staff as early as

1988 and

many transcend

the

greater part of this decade.

As evidenced

by your staff's written record

and

our inspection findings'

common perception that was exhibited in your

staff's actions

was

a lack of need for timely decision

making for issues

subject to internal

and external

reporting requi rements.

Clearly,

a lack of

timeliness

was also evident in the need for obtaining satisfactory regulatory

resolutions to outstanding

issues.

We are concerned that this is

a continuing

problem and urge that you take aggressive

action to assure

regulatory issues

are resolved in a timely manner.

Please

ensure that your response

to the

Notice addresses

this concern.

950118010b

950111

PDR

  • DOCK 05000528

8

PDR

)((

<</

,

I

I

Arizona Public Service

Company

-2-

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response.

you should document the specific actions taken

and any additional

actions you plan to prevent recurrence.

After reviewing your response to this

Notice. including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine whether further

NRC enforcement action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincere y,

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

homas

P.

Gwynn,

D

ecto

Division of React r Saf ty

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix

B -

NRC Inspection

Report

50-528/94-35:

50-529/94-35;

50-530/94-35

w/attachment

cc w/enclosures:

Arizona Corporation

Commission

ATTN:

Mr. Steve Olea

1200

W. Washington Street

Phoenix.

Arizona

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre.

Esq.

P.O.

Box 800

Rosemead.

California

91770

h

j

f

Arizona Public Service

Company

-3-

ABB Combustion Engineering

Nuclear

Power

ATTN:

Charles

B. Brinkman,

Manager

Washington Nuclear Operations

12300 Twinbrook Parkway, Suite 330

Rockville. Maryland

20852

Arizona Radiation Regulatory Agency

ATTN:

Aubrey V. Godwin. Director

4814 South

40 Street

Phoenix,

Arizona

85040

Maricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix,

Arizona

85003

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Streets

Suite 220

Phoenix.

Arizona

85004

Akin, Gump, Strauss,

Hauer

and Feld

El

Paso Electric Company

ATTN:

Roy P.

Lessey. Jr..

Esq.

1333

New Hampshire

Avenue, Suite 400

Washington,

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela

K. Krainik. Manager

Nuclear Licensing

P.O.

Box 52034

Phoenix.

Arizona

85072-2034

I

0

I

t

J

Arizona Public Service

Company

-4-

E-Mail report to D. Sullivan (DJS)

bcc to

DMB ( IE01)

bcc distrib. by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

G. Cwalina

(RVIB, NRR)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

Toreceivecopy

fdocument, indicate

ox:"C" = Copywithout

closures

"E" =

with enclosures "N" ~ No copy

RIV:C:MB

E

I:MB

E

SPM:

E

E:NRR

E

D:DRS

Powers

12/ 2/94

J

Whi temore

BEHol

12/

/94

-<~r

I I

SCha teron

TPGwynn

12/

/94

. '2/

/94

D DRP

c~

E

ABBeach

0 //0/9S

D: DRS

TPGw nn

>L 'f

2 f UQ~>lj

)

l

0

e

Arizona Public Service

Company

E-Mail report to D. Sullivan (DJS)

bcc to

DMB ( IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F,

WCFO)

. Senior Project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

G. Cwalina

(RVIB,

NRR).

-4-

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

To receive copy

f document, indicate

ox: "C" ~ Copy without

closures

"E" ~

with enclosures "N" ~ No copy

RIV:C:MB

E

I:MB

E

SPM:

E

E:NRR

E

D:DRS

Powers

12/ 2/94

J Whi temore

BEHol

12/

/94

</s

/ q/

SCha teron

TPGwynn

12/

/94

.

0'2/

/94

D DRP

c~

E

ABBeach

0 /tO/9$

D:DRS

TPGw nn

1L 'f

1

I