gP,R RECI P0 0
/p +)i*<<+
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C.,20555-0001 ARIZONA PUBLIC SERVICE COMPANY ET AL.
DOCKET NO.
STN 50-528 PALO VERDE NUCLEAR GENERATING STAT N
UN T NO.
MENDMENT TO FACIL TY OPERATING ICENS Amendment No.
87 License No.
NPF-41 2.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric.
- Company, Southern California Edison
- Company, Public Service Company of New Mexico, Los Angeles Department of Mater and
- Power, and Southern California Public 'Power Authority dated November 22,
- 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of, the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not.be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's. regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No.
NPF-41 is hereby amended to read as follows:
9412280091 941219 PDR ADDCK 05000528 P
I
3.
(2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A', as revised through Amendment No. 87, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection
- Plan, except where otherwise stated in specific license conditions.
This license amendment is effective as of the date of issuance and must be fully implemented no later than 45 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
.7/
~4 A. 2~~ ~
Jack W. Roe, Director Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
.December 19, 1994
il 0
C
AMENDMENT NO.
ATTACHMENT TO LICENSE AMENDMENT TO FACILITY OPERATING LICENSE NO.
NPF-41 DOCKET NO.
STN 50-528 Replace the following page of the Appendix A Technical, Specifications with the enclosed page.
The revised page is identified by amendment number and contain vertical lines indicating the areas of change.
Remove 3/4 7-3
~nsert 3/4 7-3
I~
0
'I
TABLE 3 7-AXIHUH ALLOWABLE STEADY STAT POWER VE AND MAXIHUH VARIAB E OV RPOWE TRIP SETPOINT WITH INOP RABL STEAM LIN SAFETY VALVES HAXIHUH NUMBER OF INOPERABLE SAFETY VALVES ON ANY OPERATING STEAM GENERATOR HAXIHUH VARIABLE OVERPOWER TRIP SETPOINT (X OF RATED THERMAL POWER) 108.0 97.1 86.2 75.3 HAXIHUH ALLOWABLE STEADY STATE POWER LEVEL (X OF RATED THERMA POWER) 98.2*
87.3 76.4 65.5
- For Unit 1 cycle 5, operation may continue at 100X Allowable Steady State Power-Level with one main steam safety valve inoperable per steam generator.
PLANT SYSTEMS it AUXILIARY FEEDWATER SYS'EM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
a.
Two feedwater
- pumps, each capable of being powered from separate OPERABLE emergency
- busses, and b.
One feedwater pump 'capable of being power@>d from an OPERABLIE:,steam supply system.
APPLICABILITY:
MODES 1, 2'I, 3, and 4*.
ACTION:
a
~
b.
With one auxi'liary feedwater pum'p inoperable, restore the required auxiliary f'eedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 Ihohrs and-'in HOT SHUTDOWN within the fo'llowing 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />'.
With two auxi'liary, feedwater pumps inoperable be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c.
With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to-re. tore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.
4.7.1.2 Each auxiliary, feedwater pump shall. be demonstrated OPERABLE;.
a.
At least once per 31 days:
1.
Verifying that each valve (manu@1, power-operated, or automatic) in the f'low path that is not locked,
- sealed, or o1therwise secured in position, is in its correct position.
2.
Verifying that all manual valves in the suction lines from the primary AFW supply tank (condensate storage tank CTE-TO1) to each essentia'I AFW pump, and. the manual discharge line valve of each AFW pump are lockedl, sealed or otherwise secured'n the open position,.
At least once per 92 days on a
STAGGERED TEST BASIS by:
1.
Testing the turbine-driven, pump and botlh motor-driven pumps pur-suant to Specification 4.0.5.
The provisions of Specif'ication 4.0.4 are not applicable.. for the turbine-driven pump for entry into MODIE 3.
- Until the steam generators are no longer required for'eat removal.
PALO VERDE UNIT 1
3/4 7-4 AMENDMFNT NO