Forwards Insp Repts 50-528/94-28,50-529/94-28 & 50-530/94-28 on 940927-1007.Team Noted That Not All Required Info Was Included on Radiological Controls Area Vehicle Equipment & Matl Release Log
ML17311A467
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/05/1994
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17311A469 List:
References
NUDOCS 9412070012
Download: ML17311A467 (10)


See also: IR 05000528/1994028

Text

<Pg Af00

i ~

r

J

UNITED STATES

LEAR REGULATORY COMMISSIO

REGION IV

611 RYAN PLAZA DRIVE SUITE 400

ARLINGTON. TEXAS 76011 6064

OEC

5 i994

Arizona Public Service

Company

ATTN:

William L. Stewart

Executive Vice President.

Nuclear

P.O.

Box 53999

Phoenix.

Arizona

85072-3999

SUBJECT:

NRC

INSPECTION

REPORT 50-528/94-28:

50-529/94-28:

50-530/94-28

This refers to the integrated

assessment

team inspection conducted

by

Hr.

Elmo E. Collins of this office on September

27 through October

7,

1994.

The inspection

included

a review of activities authorized for your Palo Verde

Nuclear Generating Station,

Units l. 2,

and 3, facility.

At the conclusion of

the inspections

the findings were discussed

with you and those

members of your

staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

This

inspection

focused

on engineering'aintenance.

and radiological controls.

Within these

areas.

the inspection consisted of selective examinations of

procedures

and representative

records,

interviews with personnel.

and

observation of activities in progress.

The purpose of the inspection

was to

determine whether activities authorized

by the license were conducted safely

and in accordance

with NRC requirements.

The results of the inspection are documented

in the executive

summary

beginning

on page iv in the enclosed

report.

Overall, the team found that

Palo Verde had

a good self-assessment

capability.

Performance

issues

were

known and were usually effectively addressed.

The team considered it

noteworthy that the Nuclear Assurance

Department

had identified

a programmatic

weakness

in the effectiveness

of site corrective actions.

Additional steps

were being taken by you to address this weakness.

The team's

independent

review also found examples of this weakness.

The team was not able to verify

the effectiveness

of these additional

steps

since they were early in the

process of implementation.

The team also considered it noteworthy that

historic problems

such

as control

room deficiencies.

operator work arounds.

and the number of drip catches

were recently given priority for reduction.

During this inspection.

the team identified that not all required information

was included

on the radiological controls area vehicle.

equipment,

and

material

release

log.

This was

a violation of procedures.

This violation is

not being cited because

the criteria in paragraph

VII.B.1 of Appendix

C to

10 CFR Part 2 of the

NRC's "Rules of Practice."

were satisfied.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

9412070012

941205

PDR

ADOCK 05000528

8

PDR

pp )

,

I

Arizona Public Service

Company

-2-

Should you have any questions

concerning this inspection.

we will be pleased

to discuss

them with you.

Sincerely.

Dockets:

50-528

,50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

Enclosure:

Appendix

-

NRC Inspection Report

50-528/94-28:

50-529/94-28;

50-530/94-28 w/attachments

cc w/enclosure':

Arizona Corporation

Commission

ATTN:

Mr. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre,

Esq.

P.O.

Box 800

Rosemead

~

Ca 1 iforni a

91770

h mas

P.

Gwynn,

iree or

Division of Rea

or

S fe y

ABB Combustion Engineering

Nuclear

Power

ATTN:

Charles

B. Brinkman,

Manager

Washington

Nuclear

Operations

12300 Twinbrook Parkway. Suite 330

Rockvi lie, Maryland

20852

Arizona Radiation Regulatory Agency

ATTN:

Aubrey V. Godwin."Director

4814 South

40 Street

Phoenix,

Arizona

85040

Maricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix.

Arizona

85003

1

I

l

Arizona Public Service

Company

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Street.

Suite

220

Phoenix.

Arizona

85004

Akin. Gump. Strauss.

Hauer

and Feld

El Paso Electric Company

ATTN:

Roy P.

Lessey. Jr.,

Esq.

1333

New Hampshire

Avenue, Suite

400

Washington.

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela

K. Krainik. Hanager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

J

l<[

~

>,f

Ar>zona Public Serv>ce

Company

E-Hail report to D. Sullivan (DJS)

bcc to

DHB ( IEOl)

bcc distrib.

by RIV:

L. J. Callan

ORSS- F IPB

Branch Chief (DRP/F,

WCF{))

RIV Fi le

Leah Tremper.

DC/LFDCB,

MS:

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/F.

WCFQ)

Branch Chief (DRP/TSS)

HNBB 4503

RIV:TL*

EECollins

ll/30/94

RS.ORSS*

TAndrews

ll/30/94

RI: EB: DRS~

PAGoldberg

ll/22/94

RI:MB:ORS*

CEJohnson

ll/30/94

RI: DRS: PSB*

DPereira

11/30/94

LRicketson

WWagner

WPAng

11/23/94

ll/30/94

12/Ol/94

"Previously concurred

I.'6004q

SRS:DRSS*

RI:PSB:ORS*

C:PSB:ORS*

D:DRS

TPGwynn

12/2 /94

D:DRS

AB

TPGwynn

12/

/94

12/0 /94

I

@

1,'J

,('

I

'l l

Arizona Public Service

Company

-4-

E-Mail report to D. Sullivan (DJS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/F,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

MS:

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

MNBB 4503

RIV:TL*

EECollins

RS:DRSS*

TAndrews

PAGoldberg

CEJohnson

DPereira

RI: EB: DRS*

RI: MB: DRS*

RI: DRS: PSB*

11/30/94

11/30/94

11/22/94

11/30/94

11/30/94

SRS:DRSS*

RI:PSB:DRS*

C:PSB:DRSA

0:DRS

0:

P

0:DRS

LRicketson

WWagner

WPAng

TPGwynn

t

11/23/94

11/30/94

12/01/94

12/Z'/94

  • Previously concurred

AB

12/

/94

TPGwynn

12/0 /94

l

'l