P R.IC)H.IMY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9412050377 DOC.DATE: 94/11/30 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION STEWART,W.L.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION P
Document Control Branch (Document Control Desk)
SUBJECT:
Application for amend to license NPF-51 to TS re schedule for battery testing.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR
(
ENCL 0 SIZE:
TITLE: OR Submittal:
General Distribution NOTES:Standardized plant.
05000529 RECIPIENT ID CODE/NAME PD4-2 LA HOLIAN, B INTERNAL: ACRS NRR/DE/EELB NRR/DRPW NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL RECXPXENT ID CODE/NAME PD4-2 PD TRAN,L
~ILE GESTE~ 1 NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPXES LTTR ENCL 1
1 1
1 D
0 C
E N
YOTE TO ALL"RIDS" RECIPIEY'TS:
PLEASE IRELP US TO REDUCE iVASTE!COYTACT'I'IIE DOCL'ifEYTCOYTROL DESK, ROOM PI -37 (EXT. 504-2083 ) TO ELI Nfl.'PATE YOUR N'AifE FROif DISTRIDUTIOY,LIS'I'S FOR DOCL'MEi'I'SYOI'Oi "I'lED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL
e
)t t
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX, ARIZONA85072<999 WILLIAML. STEWART EXECUTIVEVICEPRESIDENT NUCLEAR 102-03198-WLS/SAB/DRL November 30, 1994 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-37 Washington, D.C. 20555
Dear Sirs:
References:
1)
Letter No. 102-03144, dated October 9, 1994, "Proposed Technical Specification Amendment to Specification 3/4.8.2, D.C. Sources, Under Emergency Circumstances" 2)
Letter No. 102-03147, dated October 12,
- 1994, "Supplemental Information in Support of Proposed Technical Specification Amendment to Specification 3/4.8.2, D.C.
- Sources, Under Emergency Circumstances" 3)
Letter No.
102-03165, dated October 29,
- 1994, "Revision of Compensatory Actions for Battery Testing"
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 Schedule for Battery Testing File: 94-056-026'4-005<1 9.05 On October 12, 1994, Arizona Public Service Company (APS) submitted proposed compensatory testing requirements (Reference 2) in support of a proposed Technical Specification amendment submitted October 9, 1994 (Reference 1), concerning the 125VDC safety-related batteries.
Reference 2 committed to performing testing on representative samples of battery cells removed from Unit 2 (referred to as Control Groups) as one of the bases for continued operability.
Reference 3 reiterated our commitment to perform testing on the second control group by the end of November.
Currently that test is scheduled for November 29, 1994.
The NRC Staff has requested to be present at the testing of Control Group ¹2 cells, and that testing be performed on December 1, 1994. Arizona Public Service Company has agreed to this request and will now perform testing of the second control group on December 1, 1994.
All other commitments remain in effect.
A lee
~
a 9412050377 94ii30 PDR ADDCK 05000529 P
it II qv j
'I Cg 1
" U."$. Nuclear Regulatory commission ATTN: Document Control Desk Schedule for Battery Testing Page 2 Should you have any questions,,please contact Scott A. Bauer at (602) 393-5978.
Sincerely, L