ML17311A412

From kanterella
Jump to navigation Jump to search
Forwards Updated Operator Licensing Natl Exam Schedule, Including Anticipated Number of Candidates from PVNGS to Be Examined & Number of Candidates That Will Participate in Generic Fundamental Exam for FY95
ML17311A412
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/09/1994
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03172-JML-A, 102-3172-JML-A, NUDOCS 9411250062
Download: ML17311A412 (6)


Text

P R.ICDR.IMY' (ACCELERATED RIDS PROCESSING DOCKET 05000528 05000529 05000530 p

SUBJECT:

Forwards updated operator licensing natl exam schedule, including anticipated number of candidates from PVNGS to be examined

& number of candidates that will participate in generic fundamental exam for FY95.

DXSTRXBUTION CODE:

M003D COPXES RECEIVED:LTR ENCL SIZE:

TITLE: Operator Requalification Program REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9411250062 DOC.DATE: 94/11/09 NOTARIZED: NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPXENT AFFXLIATION Document Control Branch (Document Control Desk)

NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

05000528 05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L INTERNAL: ACRS NRR/DRCH/HHFBPT RGN4 EXTERNAL: NOAC COPXES LTTR ENCL 1

1 1

1 6

6 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HOLIAN, B

~ILE:CENT'ER~

0 1 NRR/DRCH/HOLB NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

U NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE IVASTE!CONTACTTHE DOCU.'CLIENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIliIIVATE YOUR NAXIEPRO!~I DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 15 ENCL 15

JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034

~

PHOENIX, ARIZONA85072-2034 102-031 72-JML/AKK'/RJH November 9, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Reference:

Administrative Letter (AL) 94-12, dated September 12, 1994, from B. K.

Grimes, Director, Division of Operating Reactor Support, Office of Nuclear Reactor Regulation

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Operator Licensing National Examination Schedule File: 94-005%19.06 Arizona Public Service Company's voluntary response to Administrative Letter 94-12 is

'nclosed.

The updated schedule includes the anticipated number of candidates from PVNGS to be examined and our estimate ofthe number of candidates who willparticipate in the Generic Fundamental Examination Schedule for fiscal year 1995.

As requested, a copy of this letter and the enclosure are being sent to the Regional Adminstrator, Region IV.

Ifyou have any questions regarding the enclosed information, please call Robert Nunez at (602) 393-6580.

Sincerely, JML/AKK/RJH/pv

Enclosure:

NRC Form 536 9411250062 941109 I i,020

~99 PDR ADOCK 05000528 V

PDR

U: S.'uclear Regulatory Commission Operator Licensing National Examination Schedlue Page 2 CC:

L. J. Caltan J. L. Pellet K. E. Perkins L. A. Hurley K. E. Johnston

ENCLOSURE NRC FORM 536 OPERATOR LICENSE EXAMINATIONDATA

~

~

~

NRC FORM 636 (8 94)

U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATIONDATA ATTACHMENT 2 APPROVED BY OMB: No. 3160-0131 EXPIRES: 8/3'1/97 ESTNATED BURDEN PER RESPNISE TO COMPLY WITH THIS RIFORMATION COILECTHRI REDDEST:

1 HOUR.

TIRS VOLUNTARY RIFORMATION COllECTINI IS USED TO PLAN BUDGETS AND RESOURCES FOR OPERATOR EXAMFIATIONS.FORWARD COMMQITS REGARDNG BURDEN ESTIMATE TO THE NFORMATION AND RECORDS MANAGEMENT BRANCH IT8 F33), US.

NUCIEAR REGULATORY COMMISSKRI, WASHNGTCN, DC 20555000), AND TO THE PAPERWORK REDUCTION PROJECT Q)5001311, OFFICE OF MANAGEMENTAND BUDGET, WASHPIGTNI,DC 20503.

FACILITY PVNGS

'NITS 1 2, and 3 Docket Aos. 50-528/529/530 NRC REGION IV A. PROPOSED OPERATOR LICENSING EXAMINATIONSCHEDULE FY1996 FY 19 97 FY 19 I10/01/95

- 09/30/ 96

)

I10/0)/~6

- 09/30/~7)

I10/01/~ ~ 09/30/~)

II0/01/~ - 09/30/~)

ASSIGNED DATE PER GENERIC LETTER GL-S9-03 October October October October NUMBER OF REACTOR OPERATORS 0

NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0

~

NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 12 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 ASSIGNED DATE PER GENERIC LETTER GL.B9.03 NUMBER OF.

REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED B. PROPOSED GENERIC FUNDAMENTALEXAMINATIONSCHEDULE FY 97 ESTIMATED NUMBER OF CANDIDATES NWC FORM 6J6 18 94 APRIL 19~

10 OCTOBER 19~

10