PRIDRIT'Y Z
REGULATORPSP6kbKBKF D&MBUTION SYSTEM
( RIDS )
ACCESSION NBR:9410210007
DOC.DATE: 94/10/14
NOTARIZED: NO
DOCKET
N
FACIL:STN-50-528 Palo Verde Nuclear Station,
Unit 1, Arizona Publi
05000528
STN-50-529
Palo Verde Nuclear Station,
Unit 2, Arizona Publi
05000529
~
~
STN-50-530 Palo Verde Nuclear Station,
Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
BEACH,'A.B.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
STEWART,W.L.
Arizona Public Service
Co.
(formerly Arizona Nuclear
Power
SUBJECT:
Forwards
insp repts 50-528/94-26,50-529/94-26
s 50-530/94-26
on 940724-0903.Noncited
violations identified.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR g ENCLI
SIZE: ++
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:STANDARDIZED PLANT
Standardized
plant.
Standardized
plant.
05000528
05000529
R
05000530
RECIPIENT
ID CODE/NAME
PD4-2
TRAN,L
INTERNAL: ACRS
AEOD/SPD/RAB
O~~
FI
E RENTER
0
NRR/DRCH/HHFB
NUDOCS-ABSTRACT
OGC/HDS2
RGN4
FILE
01
EXTERNAL: EG&G/BRYCE,J.H.
NRC
COPIES
LTTR ENCL
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
HOLIAN, B
AEOD/DEIB
AEOD/SPD/RRAB
DEDRO
NRR/DORS/OEAB
NRR/PMAS/IRCB-E
OE DIR
RES/HFB
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
YOTE TO ALL"RIDS" RECIPIEI~S:,
PLEASE HELP US TO REDUCE iVASTE!COii'TACTTHEDOCL'4!EiTCONTROL
DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR YAXIEFROXI
DISTRIDl"I'IOY,LISTS FOR DOCUNIEYTS YOL'Oi "I'
EED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
0
I
l
'J>q RECI
~C
C
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
OCT
I d Kea
Dockets:
50-528
50-529
50-530
Licenses:
NPF-51
Arizona Public Service
Company
ATTN:
Wi)liam L. Stewart
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/94-26;
50-529/94-26;
50-530/94-26
This refers to the inspection
conducted
by Mr. K. Johnston
and others of this
office on July 24 through September
3,
1994.
The inspection
included
a review
of activities authorized for your Palo Verde Nuclear Generating Station,
Units I, 2,
and 3, facility.
At the conclusion of the inspection,
the
findings were discussed
with those
members of your staff identified in the
enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation
of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted
safely
and in
accordance
with NRC requirements.
The results of this inspection
are
documented
in the enclosed
report.
Early in the inspection period,
the "reengineered"
organization
was
implemented for the maintenance,
engineering,
nuclear assurance,
and licensing
organizations.
While we noted that the transition
had occurred
smoothly
and
that
some benefits of the
new organization
were realized,
we also noted that
there
were lingering concerns
at the maintenance
worker level with the
effectiveness
of the
new organization
and the work processes.
While we
recognize that
such
broad
changes will result in some worker anxiety,
we
encourage
you to continue to thoroughly assess
all issues
as they
may be early
indications of weaknesses
in the
new work processes
and organizations.
You identified that shift technical
advisor
(STA) manning requirements
were
not met for a period greater
than two hours
as
a result of the shift technical
advisor's unfamiliarity with Technical Specification
Requirements.
This
violation is not being cited because
the criteria in paragraph VII.B.2 of
Appendix
C to
10 CFR Part 2 of the
NRC's "Rules of Practice,"
were satisfied.
In addition, it was identified that required presentations
to the Plant
Review
9410210007
941014
ADOCK 05000528
6
Arizona Public Service
Company
Board were not made in accordance
with procedures.
This violation is also not
being cited because
the criteria in paragraph
VII.B.I of Appendix
C were
satisfied.
In both instances,
your staff took prompt
and effective action to
correct the problem.
We were also encouraged
by the prompt actions
and
responses
to other inspector observations
and findings.
Three unresolved
items were identified concerning the:
failure of 'the Unit 3
pump to start
(Section 2.4); failure of a containment
spray valve to operate
(Section 3.2);
and environmental qualification of
steam
supply valves
(Section 6.2).
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Division of Reactor
Projects
Appendix -
NRC Inspection
Report
50-528/94-26;
50-529/94-26;
50-530/94-26
w/attachments
cc w/enclosure:
Arizona Corporation
Commission
ATTN:
Hr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T.
E. Oubre,
Esq.
P,O,
Box 800
Rosemead,
91770
ABB Combustion
Engineering
Nuclear
Power
ATTN:
Charles
B, Brinkman,
Manager
Nuclear Operations
12300 Twinbrook Parkway,
Suite
330
Rockville, Maryland
20852
4
0
4'
0
Arizona Public Service
Company
Arizona Radiation Regulatory
Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Maricopa County Board of Supervisors
ATTN:
Chairman
111 South Third Avenue
Phoenix,
85003
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025 N. 3rd Street,
Suite
220
Phoenix,
85004
Akin, Gump, Strauss,
Hauer
and Feld
El
Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
New Hampshire, Avenue, Suite
400
D.C.
20036
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Manager
Nuclear Licensing
P.O.
Box 52034
Phoenix,
85072-2034
1
Arizona Public Service
Company
OCT
I 4 l994
E-Mail report to D. Sullivan
(DJS)
bcc to
DMB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/F,
WCFO)
RIV File
Leah Tremper,
OC/LFDCB,
MS:
A. B. Beach,
D:DRP
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
MNBB 4503
RIV:SRI: DRP/F*
KJohnston
10/3/94
C:DRP/F*
HWong
10/3/94
D:WCFO*
KEPerkins
10/3/94
D
~
ch
10/ lg /94
- Previously concurred
A
J,'l
l
Arizona Public Service
Company
OCT
I 4
ISBN
E-Hail report to D. Sullivan
(DJS)
bcc to
DMB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
RIV File
Leah Tremper,
OC/LFDCB,
MS:
A.
B. Beach,
D:DRP
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
HNBB 4503
RIV: SR I:DRP/F*
KJohnston
C:DRP/F*
HWong
10/3/94
D:WCFO*
KEPerkins
10/3/94
D:
ch
10/ I)/94
- Previously concurred
J'j
1
4