Forwards Insp Repts 50-528/94-26,50-529/94-26 & 50-530/94-26 on 940724-0903.Noncited Violations Identified
ML17311A345
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/14/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17311A346 List:
References
NUDOCS 9410210007
Download: ML17311A345 (12)


See also: IR 05000528/1994026

Text

PRIDRIT'Y Z

REGULATORPSP6kbKBKF D&MBUTION SYSTEM

( RIDS )

ACCESSION NBR:9410210007

DOC.DATE: 94/10/14

NOTARIZED: NO

DOCKET

N

FACIL:STN-50-528 Palo Verde Nuclear Station,

Unit 1, Arizona Publi

05000528

STN-50-529

Palo Verde Nuclear Station,

Unit 2, Arizona Publi

05000529

~

~

STN-50-530 Palo Verde Nuclear Station,

Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

BEACH,'A.B.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

STEWART,W.L.

Arizona Public Service

Co.

(formerly Arizona Nuclear

Power

SUBJECT:

Forwards

insp repts 50-528/94-26,50-529/94-26

s 50-530/94-26

on 940724-0903.Noncited

violations identified.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR g ENCLI

SIZE: ++

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

05000528

05000529

R

05000530

RECIPIENT

ID CODE/NAME

PD4-2

PD

TRAN,L

INTERNAL: ACRS

AEOD/SPD/RAB

O~~

FI

E RENTER

0

NRR/DRCH/HHFB

NUDOCS-ABSTRACT

OGC/HDS2

RGN4

FILE

01

EXTERNAL: EG&G/BRYCE,J.H.

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

HOLIAN, B

AEOD/DEIB

AEOD/SPD/RRAB

DEDRO

NRR/DORS/OEAB

NRR/PMAS/IRCB-E

OE DIR

RES/HFB

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

YOTE TO ALL"RIDS" RECIPIEI~S:,

PLEASE HELP US TO REDUCE iVASTE!COii'TACTTHEDOCL'4!EiTCONTROL

DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR YAXIEFROXI

DISTRIDl"I'IOY,LISTS FOR DOCUNIEYTS YOL'Oi "I'

EED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

22

ENCL

22

0

I

l

'J>q RECI

~C

C

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

OCT

I d Kea

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

Arizona Public Service

Company

ATTN:

Wi)liam L. Stewart

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix,

Arizona

85072-3999

SUBJECT:

NRC

INSPECTION

REPORT 50-528/94-26;

50-529/94-26;

50-530/94-26

This refers to the inspection

conducted

by Mr. K. Johnston

and others of this

office on July 24 through September

3,

1994.

The inspection

included

a review

of activities authorized for your Palo Verde Nuclear Generating Station,

Units I, 2,

and 3, facility.

At the conclusion of the inspection,

the

findings were discussed

with those

members of your staff identified in the

enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation

of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in

accordance

with NRC requirements.

The results of this inspection

are

documented

in the enclosed

report.

Early in the inspection period,

the "reengineered"

organization

was

implemented for the maintenance,

engineering,

nuclear assurance,

and licensing

organizations.

While we noted that the transition

had occurred

smoothly

and

that

some benefits of the

new organization

were realized,

we also noted that

there

were lingering concerns

at the maintenance

worker level with the

effectiveness

of the

new organization

and the work processes.

While we

recognize that

such

broad

changes will result in some worker anxiety,

we

encourage

you to continue to thoroughly assess

all issues

as they

may be early

indications of weaknesses

in the

new work processes

and organizations.

You identified that shift technical

advisor

(STA) manning requirements

were

not met for a period greater

than two hours

as

a result of the shift technical

advisor's unfamiliarity with Technical Specification

Requirements.

This

violation is not being cited because

the criteria in paragraph VII.B.2 of

Appendix

C to

10 CFR Part 2 of the

NRC's "Rules of Practice,"

were satisfied.

In addition, it was identified that required presentations

to the Plant

Review

9410210007

941014

PDR

ADOCK 05000528

6

PDR

Arizona Public Service

Company

Board were not made in accordance

with procedures.

This violation is also not

being cited because

the criteria in paragraph

VII.B.I of Appendix

C were

satisfied.

In both instances,

your staff took prompt

and effective action to

correct the problem.

We were also encouraged

by the prompt actions

and

responses

to other inspector observations

and findings.

Three unresolved

items were identified concerning the:

failure of 'the Unit 3

auxiliary feedwater

pump to start

(Section 2.4); failure of a containment

spray valve to operate

(Section 3.2);

and environmental qualification of

auxiliary feedwater

steam

supply valves

(Section 6.2).

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Division of Reactor

Projects

Appendix -

NRC Inspection

Report

50-528/94-26;

50-529/94-26;

50-530/94-26

w/attachments

cc w/enclosure:

Arizona Corporation

Commission

ATTN:

Hr. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre,

Esq.

P,O,

Box 800

Rosemead,

California

91770

ABB Combustion

Engineering

Nuclear

Power

ATTN:

Charles

B, Brinkman,

Manager

Washington

Nuclear Operations

12300 Twinbrook Parkway,

Suite

330

Rockville, Maryland

20852

4

0

4'

0

Arizona Public Service

Company

Arizona Radiation Regulatory

Agency

ATTN:

Aubrey V. Godwin, Director

4814 South

40 Street

Phoenix,

Arizona

85040

Maricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix,

Arizona

85003

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025 N. 3rd Street,

Suite

220

Phoenix,

Arizona

85004

Akin, Gump, Strauss,

Hauer

and Feld

El

Paso Electric Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire, Avenue, Suite

400

Washington,

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela K. Krainik, Manager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

1

Arizona Public Service

Company

OCT

I 4 l994

E-Mail report to D. Sullivan

(DJS)

bcc to

DMB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/F,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

MS:

A. B. Beach,

D:DRP

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

MNBB 4503

RIV:SRI: DRP/F*

KJohnston

10/3/94

C:DRP/F*

HWong

10/3/94

D:WCFO*

KEPerkins

10/3/94

D

~

AB

ch

10/ lg /94

  • Previously concurred

A

J,'l

l

Arizona Public Service

Company

OCT

I 4

ISBN

E-Hail report to D. Sullivan

(DJS)

bcc to

DMB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

MS:

A.

B. Beach,

D:DRP

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

HNBB 4503

RIV: SR I:DRP/F*

KJohnston

C:DRP/F*

HWong

10/3/94

D:WCFO*

KEPerkins

10/3/94

D:

AB

ch

10/ I)/94

  • Previously concurred

J'j

1

4

f