ML17311A247
| ML17311A247 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/02/1994 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Stewart W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17311A248 | List: |
| References | |
| NUDOCS 9409120083 | |
| Download: ML17311A247 (10) | |
See also: IR 05000528/1994029
Text
~ pe
(4
~O
e
Cy
C
AE0(
~o
oO
I
C
Pg
~O
++*4+
UNITEDSTATES
NUCLEAR REGULATORY COMMISS)ON
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 760114064
gy
g NN
Dockets:
50-528
50-529
50-530
Licenses:
NPF-51
Arizona Public Service
Company
ATTN:
William L. Stewart
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC INSPECTION
REPORT 50-528/94-29;
50-529/94-29;
50-530/94-29
This refers to the inspection
conducted
by Phillip squalls of this office on
August 8-11,
1994.
The inspection
included
a review of activities authorized
for your Palo Verde Nuclear Generating Station,
Units 1, 2,
and 3, facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The results of this inspection
are documented
on
page
1, in the enclosed report.
One unresolved
item was identified concerning the qualification of Thermo-
Lag 330-1 panels
manufactured
at Palo Verde during construction
and used
as
10 CFR Part 50, Appendix R, rated fire barriers.
This matter is discussed
in
Section.2.5 of,the. enclosed
inspection report.
Subsequent
to the inspection,
on August 24,
1994, during
a telephone
conversation
between Hr. S.
Bauer of
your staff and Hr.
W. P.
Ang of my staff, Arizona Public Service
Company
acknowledged
the unresolved
item and committed to address
the qualification of
Thermo-Lag 330-1 panels
manufactured
at Palo Verde, in future correspondence
for the resolution of generic questions
regarding
Thermo-Lag 330-1.
It is our
understanding
that this unresolved
item will be addressed
prior to your
relying on installed Thermo-Lag 330-1 panels
manufactured
at Palo Verde to
meet
NRC fire protection requirements.
Should your understanding
of this
commitment differ from ours,
please
contact
me immediately.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
9409120083
940902
ADOCK 05000528
",
6
/p
(
k
(
,
4
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
homas
P.
Gwyn
,
re
or
Division of Re
r S fety
Enclosure:
Appendix NRC Inspection
Report
50-528/94-29;
50-529/94-29;
50-530/94-29
cc w/enclosure:
Arizona Corporation
Commission
ATTN:
Mr. Steve Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T. E. Oubre,
Esq.;
P.O.
Box 800
Rosemead,
91770
ABB Combustion Engineering Nuclear Power
ATTN:
Charles
B. Brinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland
20852
Arizona Radiation Regulatory Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Maricopa County Board of Supervisors
ATTN:
Chairman
111 South Third Avenue
Phoenix,
85003
Newman
5 Holtzinger,
P.C.
ATTN:
Jack
R.
Newman,
Esq.
1615
L Street,
N.W., Suite
1000
D.C.
20036
Arizona Public Service
Company
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025 N. 3rd Street,
Suite
220
Phoenix,
85004
Akin, Gump, Strauss,
Hauer and Feld
El
Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue, Suite 400
D.C.
20036
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Manager
Nuclear Licensing
P.O.
Box 52034
Phoenix,
85072-2034
l
i
Iii
!
ll
('I
I
l
I
J
1
(',
Arizona Public Service
Company
~
~
~
E-Mail report to D. Sullivan
(DJS)
bcc to
DMB (IEOI)
bcc distrib. by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
RIV File
Leah Tremper,
OC/LFDCB,
MS:
MNBB
W.
P. Ang, Chief,
DRS/PS,
WCFO
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
4503
RIV:RI:DRS
C: PS
C:DRP
F
D:DRS
D:DRP
D:DRS
PQualls
WPAn
HWon
TPGwynn
ABBeac&
TPGwynn
as
94
~ B-Ia~
~ ~uu
qlt
~/
3o 94
0
94
R
9
94
9 ~ 94
4
e
Arizona Public Service
Company
c
E-Hail report to D. Sullivan
(DJS)
bcc to
DHB (IEOI)
bcc distrib.
by RIV:
L. D. Callan
DRSS-F IPB
Branch Chief (DRP/F,
WCFO)
RIV Fi 1 e
Leah Tremper,
OC/LFDCB,
MS:
HNBB
W.
P.
Ang, Chief,
DRS/PS,
WCFO
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
4503
C:DRP
F
D:DRS
RIV:RI:DRS
C: PS
PQualls
WPAn
D:DRP
ABBeac&
D:DRS
TPGw nn
HWon
TPGwynn
t
ao 94
'~
94
3o 94
0
94
R
3
94
9 ~ 94
I
1
il
I
'I
I
el