ML17311A208

From kanterella
Jump to navigation Jump to search
Forwards Palo Verde Nuclear Generating Station Unit 3 SG Insp Rept
ML17311A208
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/11/1994
From: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17311A209 List:
References
102-03082-WLS-R, 102-3082-WLS-R, NUDOCS 9408230233
Download: ML17311A208 (8)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR:9408230233 DOC.DATE: 94/08/11 NOTARIZED:

NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILXATXON STEWART,W.L.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Palo Verde Nuclear Generating Station Unit 3

SG Insp Rept."

DXSTRXBUTION CODE:

A001D COPXES RECEIVED:LTR ENCL SIZE-TITLE: OR Submittal:

General Distribution'OTES:Standardized plant.

05000530 RECIPIENT ID CODE/NAME PD4-2 LA TRAN, L INTERNAL: ACRS NRR/DORS/ONDD NRR/DRPW NRR/DSSA/SRXB OC DCB REG FI 01 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 2

2 6

6 1

1 1",I 1

1 1

1 0

1 1

1 1

RECIPIENT ID CODE/NAME PD4-2 PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS2 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

0 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS I OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPXES REQUIRED:

LTTR 22 ENCL 20

1 1

1 y l,

(

Arizona Public Service Company P.O. BOX 53999

~

PHOENIX, ARIZONA85072<999 WILLIAML. STEWART EXECUTIVEVICEPRESIDENT NUCLEAR 102-03082-WLS/RAB/JRP August 11, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No. STN 50-530 Steam Generator Inspection Report File: 94-056-026 This letter is being provided to transmit the PVNGS Unit 3 Steam Generator Report (enclosed).

Unit 3 was shut down on March 19, 1994 to begin its fourth refueling outage (U3R4). The Unit 3 steam generators were inspected during the refueling outage using Eddy Current Testing (ECT) technology comprised of both bobbin coil probe and motorized rotating pancake coil (MRPC) probe.

The inspection identiTied a total of 17 tubes with single axial indications (SAls) in the upper bundle area, one tube in steam generator 31 and 16 tubes in steam generator 32.

In addition, six tubes in steam generator 31 and eight tubes in steam generator 32 were also plugged for a total of 31 tubes being plugged during this outage.

There were no circumferential indications found by ECT inspection during this period.

Each steam generator was also full bundle chemically cleaned and sludge lanced.

During the startup process the steam generators were boric acid crevice flushed and at low power were boric acid soaked.

Ethanolamine treatment will be implemented to reduce iron transport to the steam generators.

PVNGS has implemented a molar ratio control program which includes reduction of contaminants (sodium and sulfates), while using ammonium chloride to maintain proper Na/Cl ratios.

These extensive and aggressive corrective actions have been taken to control the crevice environment in the steam generators.

Based on the corrective actions and inspection

results, it can be concluded that operation of Unit 3, until the next scheduled mid-cycle outage, will not constitute a safety concern.

7~Q/l w

/

9408230233 9408ii PDR ADQCK 05000530 PDR

'I I

1 u

ll'"

PJ

~

~

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Steam Generator Inspection Plan Page 2 Should you have any. questions, please. contact, Richard A..Bernier at.(602) 393-5882..

Sincerely, WLS/RAB/JRP/dpr Enclosure cc:

L. J. Callan K. E. Perkins B; E. Holian K. E. Johnston

~

~

V

ENCLOSURE PALO VERDE NUCLEAR GENERATING STATION (PVNGS)

UNIT 3 STEAM GENERATOR INSPECTION REPORT

0