ML17311A119

From kanterella
Jump to navigation Jump to search
Change 5 to Rev 0 of MP-1 Diesel Generator Loading
ML17311A119
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/22/1991
From: Ewing R, Halleck R, Regan J
NORTHEAST UTILITIES
To:
Shared Package
ML17262B224 List:
References
PA-79-126-742-G, PA-79-126-742-GE-R, PA-79-126-742-GE-R00, NUDOCS 9110170193
Download: ML17311A119 (3)


Text

kk' kkOkk'kkkkkkik' tKtakkkkfttCVIUNITNQ~IgOWIWT kkkttttea IMSQDtVItttttttCttkt~

kOlkOkt'Wttt P(Ntt C(WlhWT AFFECTED CALCULATION/PLANT MP1 CI MP2 P MPS NUSCO CALCULATIONCHANGE NOTICE (CCN)

PCY

- PO~R PAGE YA 79'A<-1~ -R CALCULATIONTITLE P-I "b~

REVISION NO.

CHANGE NO.

CALCIAATIONORIGINATED BY:

~

0 NU P~~~

REFERENCES g~

Pap) ~VELD

~

SA(qI S.

REASON FOR CHANGE E4 W ~

Id S,

DESCRIPTION OF CHANGE S TECftOCAL JUSTPICATION

+/+CD II ~ gkk~~

Ikw.tk& 44tH'",M k

C@.0 P

'F1101701'P3 c'11007 PDR ADOCK 05000245 0

PDR 7

NUCLEAR ~ICATOR

~CAT I P RWQA P FPOA P ATWB S. AFFECTED CALC. PA(gP

.b DATE y

PREPARED BYI(PFNkITEDNAMEl JL457 TD ~./g ot=

kg ajar i<c~~ ~+~ ~~a (kkl C~tk'-~

~ ~~ (Att0~g g IVT~~+

egg

~nrp<a0 g

Ls, 5nu CA REVIEWED BY:[PR&AED HhMgk

'~4 ~d Cv ill P

9)

APPROVED BY:(PRATED NAME)

M. rV~~~

DO Ratings Time Ahor DO Breaker Closure Loads HP KW Step Tatal DG Roq.

Roq.

KW KW Load KVARating p.L KW Short time KW Start KW Constants KW/HP Largo Mv. Eff.

Snwl Mv. Ell.

Start Choclt HP toKW Running p.f.

0.8 2032 0.746 0315 doss 1.8, 0.66 0 See.

(Connected Load)

Safety Injection MOV's lactation MOVe Diesel Aurfgarle s 460 VXfrnr.12F Losses Emergency Ughts Instrument AC Stand By Gas Treatment Emergency AlrHanding Water Coded Candonser Reactor Bldg. Etovatol Reactor Food 6 Seal Water Return WA 112.0 NIA 67.0 WA 10.7 NIA 16.6 NIA 70.0 NIA 23.3 NIA 0.7 WA 37.0 WA fkL3 WA 23.3 NIA 4.7 210 210 d~

Assumes Dhorsity Factor Note 3 Notes 4 6 11 Note 1 Note 2 Note 4 Note 6 Note 6 Note 7 Nato 6 Nate 0 Note 10 Stardng Chock Input 2nd Emor. Senrloo Water 0 Soc.

Start Check 1st LPCI Pump 600 1060

$32 427 427 646 24.2SO 1200 43 3%

Load HP.4r HP.46r 2700 202 6 See.

Start Chock 2nd LPCI Pump

$00 000

$32 427 1072 1546 61.515 Dherslty 10 Sec.

Start Chock Cor ~ Spray Pump StanChock Service Water Pump 600 1440 736

$00 600 1060 600 401 500 1683 62.46tr 2512 83.7ss 401 2064 77.465 2743 01AO5 Start Chock Turbine Bldg. See. Closed Ctg. V/tr.

150 270 135 106 10d 2172 61.der 2334 77 dss 47 Sec. MOV'IA 00 2063 76.los Start Check Convol Rod Drho Pump 250 450 250 201 201 2263 65.7rrfr 2533 64 Art/r Start Chock RBCCW Pump 250 450 250 201 201 2464 03.2rts 2733 gt.trttr Reactor Bkig. Elevator Off SBLC Heater NIA 12 NIA 12,6 Nato 13 Sec r

'PCIPum W27 2056 77.215 005 Soc.

Secure CRD and RBCCW

&01

&01 1657 d2.2%

610 Soc.

Start Cheek 1st Emergency Se rvtce Water Pump 400 720 400 321 321 1076 74.214 2377 70.2ofr dtdsoc.

Start Chock 2nd Emergency Serv'ce Wat 400 720 321 2206 66.2srr 2606 60.01/r Stan Chock Restarl CRD or RBCCW 250 450 250 201 2400 2746 03.615 Ot.6 so 30 Min.

Battery Charger 0

2506

04. Itd NIA 0