ML17311A030

From kanterella
Jump to navigation Jump to search
Forwards Revised Emergency Operating Procedures for Plant
ML17311A030
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1996
From: Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264A532 List:
References
NUDOCS 9606070197
Download: ML17311A030 (10)


Text

SUBJECT:

Revised Emergency Operating Procedures, including Rev 10 to AP-RCP.l,Rev 12 to ECA-O.l,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 4 to FR-H.3,Rev 3 to FR-H.4,Rev 7 to FR-I.l,Rev 12 to FR-P.1 6 Rev 10 to FR-S.l.W/960531 ltr.

DISTRIBUTION CODE:

A002D COPIES RECEIVED:LTR

! ENCL /

SIZE:

S +/Q TITLE: OR Submittal:Inadequate Core Cooling (Item II.F.2) GL 82-28 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

C E

05000244 g

CATEGORY 1 REGULATOR~

INFORMATION DISTRIBUTION YSTEM (RIDS)

ACCESSION NBR:9606070197 DOC.DATE: 96/05/31 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION WIDAY,J.A. -

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

7c'>>

RECIPIENT

-ID CODE/NAME PD1-1 PD INTERNA F

E CENTE~BNB0' SRXB RES/DSIR/EIB EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME VISSING,G.

NRR/DRPM/PECB RES DE RES/DSIR/RPSB NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 0

D E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN SD-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

/j

l slrxssifll)l Isi~slszi~llis j

rrAN ROCHESTERGASANDELECTRICCORPORATION o 89EASTAVENUE, ROCHESTER N.Y. 14649<001 JOSEPH A. WIDAY Plant Managor Sinna Nucloar Plant May 31, 1996 TELEPHONE AREA CODE 718 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-1 Washington, D.C.

20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours,

a. Lj h A. Widay JAW/jdw XC:

U.S. Nuclear Regulatory Commission Region I

475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

AP Index ECA Index FR Index AP-RCP.1, Rev. 10 ECA-0.1, Rev. 12 O (OOJ @CA-2.1, Rev. 12 FR-H.2, Rev. 3 FR-H.3, Rev. 4 FR-H.4, Rev. 3 FR-I.1, Rev. 7 FR-P.1, Rev. 12 FR-S.1, Rev. 10 FR-S.2, Rev. 6 9eo+070i97 9S053>

PDR ADQCK 05000244 F

PDR

REPORT NO.

01 REPORT NAME: DOC-P001 DOC TYPE:

PRAP GINHA NUCLEAR POWER PLANT PROCEDURES INDEX ABNORMAL PROCEDURE 01/25/95 08:50 PAGE 1

PRATT PRE PRECA PRER PARAMETERS:

DOC TYPES - PRAP 5 YEARS ONLY:

REV EFFECT LAST DATE REVIEW STATUS:

NEXT ST REVIEW PROCEDURE TITLE PROCEDURE NUMBER AP-CCW.1 AP-CCW.2 AP-CCW.

AP.CR.1 AP-CVCS.1 AP-CVCS.2 AP-CW. I AP-ELEC.1 AP-ELEC.2 AP-ELEC.3 AP-FW.1 AP-IA~ 1 AP-PRZR.1 AP-RCC.1 AP-RCC.2 AP.RCC.3 AP-RCP.1 AP-RGB 1 AP-RCS.2 AP-RCS.3 AP-RCS.4 AP-RHR.1 AP-RHR.2 AP-SW. 1 AP-TURB.1 009 06/09/94 06/04/93 12/04/95 EF 011 08/30/94 08/30/94 02/28/97 EF 009 08/30/94 08/30/94 02/28/97 EF 013 11/17/94 11/17/94 05/17/9 EF 008 01/25/95 01/25/95 0

5/97 EF LEAKAGE INTO THE COMPONENT COOLING LOOP LOSS OF CCW DURING POWER OPERATION LOSS OF CCII - PLAN'I SHUTDOWN CONTROL ROOH INACCESSIBILITY CVCS L DELETED LOSS OF A CIRC 'WATER PUMP LOSS OF ¹12A OR 128 TRANSFORHER SAFEGUARD BUSSES LOW VOLTAGE OR SYSTEM LOW FR CY LOSS OF 12A AND/OR 128 TRANSFORHER (BELOW 350 F)

XX 04/21/93 DE 005 04/21/93+ /21/93 10/21/95 E F 09/06/95 EF 007 02/11/94 02/11/94 08/11/96 EF 001 06/09/94 03/06/93 09/06/95 EF 009 04/21/93 04/21/93 10/21/95 EF 008 09/09/94 09/09/94 03/09/97 EF 007

/29/94 09/29/94 03/29/97 EF 005 06/04/

06/04/93 12/04/95 EF PARTIAL OR COMPLETE LOSS OF MAIN FEEDWATER LOSS OF INSTRUMENT AIR ABNORMAL PRESSURIZER PRESSURE CONTINUOUS CONTROL ROD WITHDRAWAL/INSERTION 005 04/23/93 04/2 10/23/95 EF RCC/RPI MALFUNCTION DROPPED ROO RECOVER RCP SEAL MALFUNCTION REACTOR COOL EAK L

F REACTOR COOLANT FLOW'00 04/23/93 04/23/93 10 95 EF 007 02/05/93 02/05/93 08/05/95 g g/gZ ggog 007 11/01/91 07/13/94 01/13/97 EF hfdf P~ J gP /+

009 06/09/94 10/08/93 04/00/96 09 HIGH REACTOR COOLANT ACTIVITY SHUTDOWN LOCA LOSS OF RHR 006 04/23/93 04/23/93 10/23/95 EF 003 04/07/94 04/07/94 10/07/96 EF 009 03/06/93 03/06/93 09/06/95 EF 11/08/94 05/08/97 EF 07/29/93 01/29/96 EF 05/07/93 11/07/95 EF 005

. 11/08/94 0

009 07/29/93 007 05/07/93 LOSS OF RNR WHILE OPERATING AT RCS REDUCED INVENTORY CONDITIONS SERVICE WATER LEAK TURBINE TRIP WITHOUT RX TRIP REQUIRED

REPORT NO. 01 REPORT NAME: DOC.P001 DOC TYPE:

PRAP GIHNA NUCLEAR POWER PLANT PROCEDURES IHDEX ABNORMAL PROCEDURE 01/25/95 08:50 PAGE 2

PARAMETERS:

DOC TYPES -

PRAP PROCEDURE NUMBER AP-TURB.2 AP-TURB.3 AP-TURB.4 AUTOMATIC TURBINE RUNBACK TURB INE VI BRATIOHS LOSS OF COHDENSER VACUUM PROCEDURE TITLE PRATT PRE PRECA PRER STATUS:

5 YEARS ONLY:

REV EFFECT LAST NEXT ST DATE REVIEW REVIEW 012 06/04/93 06/04/93 12/04/95 EF 006 03/26/93 03/26/93 09/26/95 EF 009 12/08/94 03/26/93 09/26/95 EF TOTAL FOR PRAP 28

C

REPORT HO. 01 REPORl'AME: DOC-P001 DOC TYPE:

PRECA GINNA NUCLEAR POWER PLAHT PROCEDURES INDEX EHERGEHCY CONTINGEHCY ACTIONS PROC 06/16/94 07:36 PAGE 4

PARAHETERS:

DOC TYPES - PRAP PROCEDURE NUHBER ECA-O.O ECA-0.1 ECA-0.2 ECA-F 1 ECA-1.2 ECA-2.1 ECA-3 ~ 1 ECA-3.2 ECA-3.3 PRE PRECA PRER PRES STATUS:

PROCEDURE TITLE LOSS OF ALL AC POWER LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED LOSS OF ALL AC POWER RECOVERY WITH Sl REQUIRED LOSS OF EHERGENCY COOLANT RECIRCULATION LOCA OUTSIDE CONTAINHEHT UNCONTROLLED DEPRESSURIZATION OF ALL STEAN GEHERATORS SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED SGTR WITH LOSS OF REACTOR COOLANT-SATURATED RECOVERY DESIRED SGTR 'WITHOUT PRESSURIZER PRESSURE CONTROL 5

YEARS ONLY:

REV EFFECT DATE LAST REVIE'W NEXT ST REVIEW 015 04/07/94 04/07/94 10/07/96 EF 010 06/09/94 04/07/94 10/07/96 EF 008 04/07/94 04/07/94 10/07/96 EF 009 04/07/94 04/07/94 10/07/96 EF 002 04/09/90 09/23/92 03/23/95 EF 010 06/09/94 04/07/94 10/07/96 EF 010 04/07/94 04/07/94 10/07/96 EF 013 04/07/94 04/07/94 04/07/96 EF 011 06/09/94 04/07/94 10/07/96 EF TOTAL FOR PRECA

'I l

P>P