Text
PRIORITY Z
r
(NUDOCS OFFSITE FACILITY).
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
"CCESSION NBR:9407220022
DOC.DATE: 94/07/18
NOTARIZED:
NO
'OCKET
'ACIL:STN-50-528 Palo Verde Nuclear Station,
Unit 1, Arizona Publi
05000528
~
~
STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi
05000529
STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
BEACH,A.B.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
STEWART,W.L.
Arizona Public Service
Co. (formerly Arizona Nuclear
Power
SUBJECT:
Forwards
insp repts
50-528/94-23
& 50-529/94-23
&
50-530/94-23
on 940528-0603
& notice of vilolation.
Violations of
NRC concern
because
violations highlight
need
to reduce personnel
errors.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vi lation Response
NOTES:STANDARDIZED PLANT
Standardized
plant.
Standardized
plant.
05000528
05000529
05000530
RECIPIENT
ID CODE/NAME
PDIV-3 PD
,L
TRAN
'RNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/PMAS/IRCB-E
REG LO2
RGN4
FILE
01
EXTERNAL: EG&G/BRYCE,J.H.
COPIES
LTTR ENCL
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
HOLIAN, B
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NUDOCS-ABSTRACT
OGC/HDS2
RES/HFB
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
.~
NOTE TO ALL'RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCOiVTROL
DESK. ROOM Pl-37 (EXT. 504-ZOS3 ) TO ELIMINATEYOUR NAMEFROM
DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T iVEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
(>>
f
I
I
~C
C
C
UNIT E D STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE ~ SUITE 400
ARLINGTON.TEXAS 76011 8064
JuL
I 8 l994
Oockets:
50-528
50-529
50-530
Licenses:
NPF-51
Arizona Public Service
Company
ATTN:
William L. Stewart
Executive Vice President,
Nuclear
PRO.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC SPECIAL
INSPECTION
REPORT 50-528/94-23;
50-529/94-23;
50-530/94-23
This refers to the 'special
inspection
conducted
by H.
Wong and others,
of this
office and the Office of Nuclear Reactor Regulation,
on Nay 28 through
June
3,
1994.
The inspection
included
a review of activities authorized for
your Palo Verde Nuclear Generati'ng Station,
Units 1, 2,
and 3, facility.
At
the conclusion of the inspection,
the findings were discussed
with J.
Levine
and those
members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
The
special
inspection
reviewed the circumstances
of the Unit 2 reactor trip of
Nay 28,
1994,
and
assessed
the adequacy of the Arizona Public Service
Company's
response
to the event.
Within these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observation
of activities in progress.
The purpose of the
inspection
was to determine
whether activities authorized
by the license
were
conducted
safely
and in accordance
with NRC requirements.
Based
on the results of this inspection,
certain licensed activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violation and the issues
identified in the event
are
of concern
because
they highlight
a need to:
(1) reduce
personnel
errors,
(2) improve communications
between
maintenance
and operations
personnel,
(3) maintain
an effective questioning attitude,
(4) maintain
a "big picture"
view when responding
to plant conditions which are not understood,
and
(5) carefully assess
the "re-engineering"
changes
made to streamline your work
processes
to assure
that barriers
important to assuring
safety are not
removed.
We found your review of this event to be thorough
and
a high level of
management
involvement
was evident.
However,
from this event,
we are
particularly concerned
regarding
the mindsets of the instrument
and control
9407220022
9407i8
ADOCK 05000528
6
(i
ll
i
l
J
(
Arizona Public Service
Company
technician
involved in the work and the operators
responding
to the
rising'ontainment
sump level.
The instrument
and control technician
had
a mindset
regarding
the appropriate train of the containment
spray system
on which to
work.
The operators
had
a mindset that the valve in the correct train of the
containment
spray
system
had
been closed with power removed
and could not
be
causing
the
sump level rise.
These mindsets
contributed significantly to
causing this event.
Action is needed
to assure
that additional
mindsets
do
not cause other,
perhaps
more significant, events.
Additionally, program
changes
made to increase
work efficiency through your "re-engineering" efforts
must also balance
the
need to assure
that the sufficient safeguards'are
in
place for appropriate
control over the
new processes.
You are required to respond
to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should
document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with
NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No. 96.511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
8Y
~ A. Bi
1
Beach,
Director
Division of Reactor Projects
Enclosures:
1.
Appendix
2.
Appendix
B NRC Inspection
Report
50-528/94-23;
50-529/94-23;
50-530/94-23
cc w/enclosures:
Arizona Corporation
Commission
ATTN:
Nr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
I"
'
I
I
I
I
l
Arizona Public Service
Company
Southern California Edison
Company
ATTN:
T.
E. Oubre,
Esq.
PRO.
Box 800
Rosemead,
91770
ABB Combustion
Engineering
Nuclear
Power
ATTN:
Charles
B. Brinkman,
Manager
Washington Nuclear Operations
12300 Twinbrook Parkway,
Suite
330
Rockville, Maryland
20852
Arizona Radiation Regulatory
Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Naricopa
County Board of Supervisors
ATTN:
Chairman
111 South Third Avenue
Phoenix,
85003
Newman
II Holtzinger,
P.C.
ATTN:
Jack
R.
Newman,
Esq.
1615
L Street,
N.W., Suite
1000
D.C.
20036
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025
N. 3rd Street,
Suite
220
Phoenix,
85004
Akin, Gump, Strauss,
Hauer
and Feld
El
Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue, Suite
400
D.C.
20036
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Hanager
Nuclear Licensing
'P.O.
Box 52034
Phoenix,
85072-2034
'
t
Arizona Public Service
Company
JUL
t 8 l994
E-Hail report to D. Sullivan
(DJS)
bcc to
DHB
( IE01)
bcc distrib.
by RIV:
L. J. Callan
Resident
Inspector
DRSS-FIPB
HIS System
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper,
OC/LFDCB, HS:
MNBB 4503
P.
Eng,
F. Burrows,
A. HacDougall,
(PV Resident
Inspector Office)
J. Ganiere,
(PV Resident
Inspector Office)
RIV:C:DRP/F*
D:WCFO*
D:DRP
0
KEPerkins
HJWong
7/12/94
7/12/94
- previous y concurre
each~
7/lk/94
'i
l
i
Arizona Public Service
Company
JUL
I 8 l998
E-Hail report to D. Sullivan
(DJS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J.
Callan
Resident
Inspector
DRSS-FIPB
HIS System
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper,
OC/LFDCB,
HS:
MNBB 4503
P.
Eng,
F. Burrows,
A. HacDougall,
(PV Resident
Inspector Office)
J.
Ganiere,
(PV Resident
Inspector Office)
D:WCFO*
RIV:C:DRP/F*
KEPerkins
HJWong
7/12/94
7/12/94
- previous y concurred
D:DRP
each~
7 /lkl94
'
,
I