ML17310B437

From kanterella
Jump to navigation Jump to search
Provides Confirmation of Facility Intention to Operate Unit 3 for Up to Six Effective full-power Months Not to Exceeded Six Full Calendar Months
ML17310B437
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/20/1994
From: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03010-WLS-R, 102-3010-WLS-R, NUDOCS 9407210116
Download: ML17310B437 (4)


Text

P R.r C) R.XMY' (ACCELERATED RIDS P ROCESSIN REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9407210116 DOC.DATE: 94/06/20 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION STEWART,W.L.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides confirmation of facility intention to operate unit 3 for up to six effective full-power months not to exceeded six full calendar months.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR L ENCL M SIZE'ITLE:

OR Submittal:

General Distribution NOTES:Standardized plant.

05000530 RECIPIENT ID CODE/NAME PDIV-3 LA TRAN,L INTERNAL: ACRS NRR/DORS/ONDD NRR/DRPW NRR/DSSA/SRXB OC LFDCB 01 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PDIV-3 PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS2 NSIC COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROE I DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T N!-'ED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL

Jg

(

4

WILLIAML. STEWART EXECUTIVEVICEPRESIOENT NUCLEAR Arizona Public Service Company P.O. BOX 53999

~

PHOENIX. ARIZONA85012<999 102-03010-WLS/RAB/JRP June 20, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No. STN 50-530 Mid-Cycle Outage Schedule File: 94-056-026 The purpose of this letter is to provide confirmation of Arizona Public Service Company's (APS) intention to operate Unit 3 for up to six effective full-power months (6EFPM), not to exceed six full calendar months in Modes 1, 2, or 3 after startup (breaker closure) from the current refueling outage.

At the end of this time period, Unit 3 will be shut down for a mid-cycle outage to conduct a steam generator tube eddy current testing inspection.

The scope of the inspection plan will be forwarded to the NRC prior to the inspection.

Should you have any questions, please contact Richard A. Bernier at (602) 393-5882.

Sincerely, Qc WLS/RAB/JR P/did CC:

L. J. Callan K. E. Perkins B, E. Holian K. E. Johnston I'Vd3<

'II407210116 940620 PDR ADOCK 05000530 P

PDR 0

P>1

k

~

~