ML17310B360
| ML17310B360 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/31/1994 |
| From: | Krainik A ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17310B361 | List: |
| References | |
| NUDOCS 9406210086 | |
| Download: ML17310B360 (8) | |
Text
FORD 2 REGULAT INFORMATION DISTRIBUTIONISTEM (RIDE j 06210086 DOC.DATE: 94/05/31 NOTARIZED:
NO ACCESRX'ON NBR:94 FACIL:
AUTH.NAME AUTHO KRAINIK,A.K.
Arizon RECIP.NAME RECIP DOCKET R AFFILIATION a Public Service Co. (formerly Arizona Nuclear Power IENT AFFILIATION Document Control Branch (Document Control Desk)
NOTES:
SUBJECT:
Forwards public version of revised EPIPs,incl index,Rev 10 to EPIP-19, "Onsite Evacuation" a Rev 12 to EPIP-20, "Personnel Assembly
& Accountability." W/940616 memo enc DISTRIBUTION CODE:
DF01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Direct Flow Distribution:
50 Docket (PDR Avail)
D RECIPIENT ID CODE/NAME INTERNAL: NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME EG FILE 01 NSIC COPIES LTTR ENCL 1
1 1
1 0
D D
0 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIIIUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 4
ENCL 4
I 1
j l
~q l,
gl
, ~<4~
~R AEcy Vp.
+
O~
Cy n
C O
+
gO
++**+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 16, 1994 50-528/529/530 Palo Verde MEMORANDUM FOR:
FROM:
SUBJECT:
Chief Document Control Branch, IRM Acting Director, Division of Freedom of Information and Publications Services, ADM REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Freedom of Information and Publications Services has reviewed the attached document and has determined that it may now be made publicly available.
Walter E. Oliu, Acting Director Division of Freedom of Informatio and Publications Services Office of Administration
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX. ARIZONA85072-2034 102-02985-AKK/PMM May 31, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN I-528/529/530 Emergency Plan Implementing Procedures Update File: 9402%93 94%5&026 In accordance with 10 CFR 50, Appendix E.V, enclosed please find copies of revised PVNGS Emergency Plan Implementing Procedures (EPIPs). The procedures included with this transmittal are indicated on the enclosed list. Also included for your information is a complete listing of the PVNGS EPIPs (Procedures Index).
The enclosed EPIPs contain information considered private or proprietary (including names and internal telephone numbers).
In accordance with Generic Letter No. 81-27, the specific information has been bracketed on the EPIPs. Arizona Public Service Company (APS) requests that this information be considered confidential and withheld from public disclosure pursuant to 10 CFR 2.790(a) and 10 CFR 9.17(a).
By copy of this letter, APS is forwarding two copies of the enclosure to the NRC Region IVOffice.
The NRC Region IV Office will subsequently forward copies of the revised EPIPs to the NRC Walnut Creek Field Office as deemed necessary.
Copies of the revised EPIPs are provided to the NRC Resident Inspector's Office as an update to the assigned controlled procedures.
940b21008b 940531 PDR ADOCK 0500052 F
AE Cl'.
r
't h
I I,
N
U. S. Nuclear Regulatory Commission AKIN: Document Control Desk EPIPs Page 2 If you have any questions, please contact Richard A. Bernier at (602) 393-5882.
Sincerely, Angela K. Krainik, Manager Nuclear Regulatory Affairs AKK/PMM/pm Enclosure cc:
E. F. Bates (w/Enclosure)
L. J. Callan (w/o Enclosure)
K. E. Perkins (w/o Enclosure)
A. B. Beach (w/o Enclosure),
P. M. Quails (w/o Enclosure)
K. E. Johnston (w/o Enclosure)
W. L. Stewart (w/o Enclosure)
ENCLOSURE REVISED EMERGENCY PLAN IMPLEMENTINGPROCEDURES LISTING EMERGENCY PLAN IMPLEMENTINGPROCEDURES INDEX
~
REVISED PVNGS EMERGENCY PLAN IMPLEMENTINGPROCEDURES (EPIP-19 & EPIP-20)
'I I
I I
I