ML17310B311

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to COLR PVNGS Unit 3 Cycle 5, Reflecting Rev to Axial Shape Index,Lower Line on Mtc Curve & Adding Sys 80 Inlet Flow Distribution Suppl Methodology
ML17310B311
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/18/1994
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17310B312 List:
References
102-02968-WFC-R, 102-2968-WFC-R, NUDOCS 9406010009
Download: ML17310B311 (8)


Text

ACCELER.5TED DISTRIBUTION DEMONS+4.TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9406010009 DOC.DATE: 94/05/18 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

R D

S 05000530 /

NOTES:Standardized plant.

SUBJECT:

Forwards rev 0 to "Unit 3 Cycle 5 Core.Operating Limits Rept," for Palo Verde Nuclear Generating Station.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR Q ENCL j SIZE: 2+

TITLE: OR Submittal:

General Distribution RECIPIENT ID CODE/NAME PDIV-3 LA TRAN,L INTERNAL: ACRS NRR/DORS/ONDD NRR/DRPW NRR/DSSA/SRXB O~C~EDC 3 EG WL~

Ol EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 2

2 6

6 1

1 1

1 1

1 1

0 1

1 1

1 RECIPIENT ID CODE/NAME PDIV-3 PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

0 1

1 D

D R

I D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20 D

D S

0 I

~

I

~

w I

I 0

~

~>>

I1 Arizona Public Service Company P.O. BOX 53999

~

PHOENIX. ARIZONA85072%999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 102-02968-WFC/RAB/JR P

May 18, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No. STN 50-530 Unit 3 Cycle 5 Core Operating Limits Report File: 94-005-419.05 94-056-026 Pursuant to PVNGS Unit 3 Technical Specification 6.9.1.10, enclosed is a copy of the Unit 3 Cycle 5 Core Operating Limits Report (COLR), Revision 0. Copies of this COLR are being provided to the NRC Region IVAdministrator, the Walnut Creek Field Office Director, and the Resident Inspector.

This Unit 3 Cycle 5 COLR willreplace the Unit 3 Cycle 4 COLR as required by Technical Specification 6.9.1.9. The differences between the Cycle 4 and the Cycle 5 COLRs are:

(1) the Axial Shape Index shown on page six has been revised from -0.27 < ASI < 0.27 to -0.28 < ASI < 0.26; (2) the lower line on the MTC curve shown on page ten has been revised to a more negative value; (3) the System 80 Inlet Flow Distribution supplement methodology has been added to reference number four on page seven; (4) in Mode 6,

> 4000 ppm and < 4000 ppm has been added; and (5) the cycle number has been changed to Cycle 5 on all pages.

I PDR ADQCK 05000550 P~

., ~,. PDR

~ ~

g

~

I

'l g

U. S. Nuclear Regulatory Commission ATTN: Document, Control Desk Unit 3 Cycle 5 Core Operating Limits Report Page 2 Should you have any questions, please contact R. A. Bernier at (602) 393-5882.

Sincerely, WFC/RAB/JRP/rv Enclosure cc:

K. E. Perkins L. J. Callan K. E. Johnston B. E. Holian A. V. Godwin (ARRA)

L

~

~ J

~ \\

~

~

1 tI

~

~

~

p h

I1 l

ENCLOSURE CORE OPERATING LIMITS REPORT PALO VERDE NUCLEARGENERATING STATION UNIT 3 CYCLE 5 REVISION 0

g f

~

'4 I

~

p j'f I