Forwards Insp Repts 50-528/94-09,50-529/94-09 & 50-530/94-09 on 940215-0328.Several Areas Demonstrating Lack of Thorough Engineering Evaluation & Followup of Plant Problems
ML17310B256
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/03/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17310B257 List:
References
NUDOCS 9405060068
Download: ML17310B256 (12)


See also: IR 05000528/1994009

Text

FORD I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:940

CIL:STN-50-528

STN-50-529

STN-50-530

AUTH.NAME

BEACHA,A.B.

RECIP.NAME

CONWAY,W.F.

5060068

DOC.DATE: 94/05/03

NOTARIZED:

NO

DOCKET

Palo Verde Nuclear Station, Unit 1, Arizona Publi

05000528

Palo Verde Nuclear Station, Unit 2', Arizona Publi

05000529

Palo Verde Nuclear Station, Unit 3, Arizona Publi'5000530

AUTHOR AFFILIATION

Region

4 (Post

820201)

RECIPIENT AFFILIATION

Arizona Public Service

Co. (formerly Arizona Nuclear

Power

Rl

p

/

05000528

05000529

05000530

0

NOTES:STANDARDZZED PLANT

Standardized

plant.

Standardized

plant.

SUBJECT:

Forwards insp repts

50-528/94-09,50-529/94-09

& 50-530/94-09

on 940215-0328.Several

areas

demonstrating

lack of thorough

engineering

evaluation

& followup of plant problems.

DISTRIBUTION CODE

IEOID

COPIES

RECEIVED LTR L ENCLl SIZE'

+ ~C)

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

RECIPIENT

ID CODE/NAME

PDIV-3 PD

TRAN,L

I TERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS1

RES/HFB

EXTERNAL: EG&G/BRYCE,J.H.

NSIC

COPIES

,LTTR ENCL

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

HOLIAN, B

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

OE DIR

EG FILE

02

C3

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

-1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

R

p

C

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOhI P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAh<E FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

,

I

l

I

UN IT E D STAT E6

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA ORIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

MAY -3 IBM

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

Arizona

Publ ic Ser vice Company

ATTN:

William F.

Conway

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix,

Arizona

85072-3999

SUBJECT:

NRC INSPECTION REPORT 50-528/94-09;

50-529/94-09;

50-530/94-09

This r efers to the inspection

conducted

by K. Johnston of this office, and the

inspectors identified in the enclosed

report

on February

15 through Narch 28,

1994.

The inspection

included

a review of activities authorized for your

Palo

Verde facility.

At the conclusion of the inspection,

the findings were

discussed

with those

members

of your staff identified in the enclosed report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities, in progress.

This inspection identified several

areas

demonstrating

a lack of thorough

engineering evaluation

and followup of plant problems.

In one case,

a

4-year-old modification to essential

chiller instrumentation

was not reflected

in plant annunciator

response

procedures

and in the Final Safety Analysis

Report,

and your engineering staff still considered

the modification

temporary.

In another

case,

even though plant procedures

and personnel

recognized

the potential for a water

hammer event in Unit 1's

steam generator

blowdown system during a manipulation- of the system's

containment isolation

valves,

on February

14,

1994, operators

caused

a water hamet

which damaged

a

pipe support

on this line.

The inspection

found that your engineering staff

had not fully evaluated

the impact of previous events

and

had not.followed

through

on

a modification to prevent the water

hammer.

We encourage

you to

review these

and the other examples

discussed

in the enclosed report

and to

determine

where the opportunities

were missed to correct these

problems.

-The inspection also found that the high intensity training for licensed

operators

was well implemented.

The program featured challenging scenarios,

in-depth critiques,

and management

involvement.

Operators

demo'nstrated

good

command

and control

and excellent communications.

We recognize that this

94050b00b8

940503

PDR

ADOCK 05000528

8

PDR

/g/l

'

l

J

Arizona Public Service

Company

effort demonstrates

considerable

management

commitment

and initiative and

anticipate its benefits in improved operations

performance.

The inspection identified one unresolved

item concerning the necessity of

declaring

a Notification of Unusual

Event during

a Unit 2 event where reactor

coolant system inventory inadvertently was drained to the refueling water

tank.

This matter is discussed

in Section 3.4 of the enclosed

inspection

report.

In accordance

with 10 CFR Part 2.790 of the NRC's "Rules of Practice,"

a copy

of this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

. Bill Beach, Director

Division of Reactor Projects

Encl osui es:

Appendix - NRC Inspection

Report

50-528/94-09;

50-529/94-09;

50-530/94-09

cc w/enclosures:

Arizona Corporation

Commission

ATTN:

Hr. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATTN:

James

A. Beoletto,. Esq.

P.O.

Box 800

Rosemead,

California

91770

ABB Combustion

Engineering Nuclear

Power

ATTN:

Charles

B. Brinkman,

Manager

Washington Nuclear Operations

12300 Twinbrook Parkway,

Suite

330

Rockville, Maryland

20852

Arizona Radiation Regulatory

Agency

ATTN:

Aubrey V. Godwin, Director

4814 South

40 .Street

Phoenix,

Arizona

85040

I

Arizona Public Service

Company

~

~

~

Haricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix,

Arizona

85003

Newman

8 Holtzinger,

P.C.

ATTN:

Jack

R.

Newman,

Esq.

1615

L Street,

N.W., Suite

1000

Washington,

D.C.

20036

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Street,

Suite

220

Phoenix, Arizona

85004

Akin, Gump, Strauss,

Hauer

and Feld

El

Paso Electric Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire

Avenue, Suite

400

Washington,

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela K. Krainik, Nanager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

I

j

f

j

,

Arizona Public Service

Company

MAY -3 1994

E-Hail report to D. Sullivan

(DJS)

bcc to

DHB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F)

RIV File

Leah Tremper,

OC/LFDCB, HS:

bcc w/o enclosure:

H. Smith,

WCFO

J. Bianchi,

WCFO

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/F)

Branch Chief (DRP/TSS)

HNBB 4503

DRP F*

SRichards

RIV:SRI:DRP F*

KJohnston;df

4/22/94

4/18/94

prev>ous y concurre

C:DRP F*

HJWon

4/18/94

C:DRS*

DAcker

4/18/94

D:DRP

ABBeach

bISjse

f

I ll

Arizona Publ ic Service

Company

MAY -3 l994

E-Hail report to D. Sullivan

(DJS)

bcc to

DMB ( IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F)

RIV File

Leah Tremper,

OC/LFDCB, HS:

bcc w/o enclosure:

H. Smith,

WCFO

J. Bianchi,

WCFO

Resident

Inspector

HIS System

Senior. Project Inspector

(DRP/F)

Branch Chief (DRP/TSS)

HNBB 4503

0

4/22/94

4/18/94

previous y concurre

RIV:SRI:DRP F*

DRP F*

KJohnston;df

SRichards

C:DRP F*

HJWon

4/18/94

C:DRS*

DAcker

4/18/94

D:DRP

ABBeach

l

l