ML17310B252

From kanterella
Jump to navigation Jump to search
Forwards Calculation 13-NS-B25, Risk Impact of Extending TS LCO for EDG B.
ML17310B252
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/27/1994
From: Krainik A
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17310B253 List:
References
102-02928-AKK-R, 102-2928-AKK-R, NUDOCS 9405050292
Download: ML17310B252 (6)


Text

ACCELERATED DIS UTION DEMONS TION SYSTEM I~

REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9405050292 DOC.DATE: 94/04/27 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION KRAINIK,A.K. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to telcon,in which NRC requested copy of PRA.

Forwards copy of PVNGS calculation 13-NS-B25,Risk Impact Of Extending TS LCO for EDG B. D DXSTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:Standardized plant. 05000529

/

A RECIPXENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDIV-3 LA 1 1 PDIV-3 PD 1 1 HOLIAN, B 2 2 TRAN,L 2 2 D XNTERNAL: ACRS 6 6 NRR/DE/EELB 1 1 NRR/DORS/OTS B 1 1 NRR/DRCH/HICB 1 1 NRR/DRPW 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OC~DCP 1 0 OGC/HDS1 1 0 REG FILE 01 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 22

h fr

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P,O. BOX 52034 ~ PHOENIX. ARIZONA85072-2034 102-02928-AKK/RAB April 27, 1994 U. S. Nuclear Regulatory Commission ATi N: Document Control Desk Mail Station P1-37 Washington, D.C. 20555

Reference:

1. Letter 4102-02898, dated April 9, 1994 from J. M. Levine, Vice President, Nuclear Production, APS, to USNRC,

Subject:

Request for Notice of Enforcement Discretion

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 Request for Additional Information File: 94-056-026 The referenced letter stated that a Probablistic Risk Analysis was performed to determine the impact on plant risk associated with the requested enforcement discretion.

Subsequent to granting the request, Mr. Brian Holian, NRC Staff, requested in a telephone conversation with Mr. Richard Bernier that Arizona Public Service Company (APS) provide the NRC with a copy of the analysis. Enclosed is a copy of PVNGS calculation 13-NS-B25, Risk Impact of Extending the TS LCO for EDG B.

Should you have any questions, please contact Richard A. Bernier at (602) 393-5882.

Sincerely, Angela K. Krainik, Manager Nuclear Licensing AKK/RAB/did Enclosure I

PDR P 'DR

!F405050292 940427 ADOCK 05000529 '

~ rA Document Control Desk U. S. Nuclear Regulatory Commission PVNGS, U-2 Request for Notice of Enforcement Discretion Page 2 cc: L. J. Callan USNRC K. E. Perkins USNRC K. E. Johnston USNRC B. E. Holian USNRC A. V. Godwin ARRA

t tr fi J

tl lt ll I