ML17310B252
| ML17310B252 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/27/1994 |
| From: | Krainik A ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17310B253 | List: |
| References | |
| 102-02928-AKK-R, 102-2928-AKK-R, NUDOCS 9405050292 | |
| Download: ML17310B252 (6) | |
Text
ACCELERATED DIS UTION DEMONS I ~
TION SYSTEM REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9405050292 DOC.DATE: 94/04/27 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION KRAINIK,A.K.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to telcon,in which NRC requested copy of PRA.
Forwards copy of PVNGS calculation 13-NS-B25,Risk Impact Of Extending TS LCO for EDG B.
DXSTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution D
NOTES:Standardized plant.
RECIPXENT ID CODE/NAME PDIV-3 LA HOLIAN, B COPIES LTTR ENCL 1
1 2
2 RECIPIENT ID CODE/NAME PDIV-3 PD TRAN,L COPIES LTTR ENCL 1
1 2
2
/
05000529 A
D D
XNTERNAL: ACRS NRR/DORS/OTS B NRR/DRPW NRR/DSSA/SRXB OC~DCP REG FILE EXTERNAL: NRC PDR 01 6
6 1
1 1
1 1
1 1
0 1
1 1
1 NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 NSIC 1
1 1
1 1
1 1
1 1
0 1
1 R
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 22
h fr
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P,O. BOX52034
~
PHOENIX. ARIZONA85072-2034 102-02928-AKK/RAB April 27, 1994 U. S. Nuclear Regulatory Commission ATiN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555
Reference:
1.
Letter 4102-02898, dated April 9, 1994 from J.
M. Levine, Vice President, Nuclear Production, APS, to USNRC,
Subject:
Request for Notice of Enforcement Discretion
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 Request for Additional Information File: 94-056-026 The referenced letter stated that a Probablistic Risk Analysis was performed to determine the impact on plant risk associated with the requested enforcement discretion.
Subsequent to granting the request, Mr. Brian Holian, NRC Staff, requested in a telephone conversation with Mr. Richard Bernier that Arizona Public Service Company (APS) provide the NRC with a copy of the analysis.
Enclosed is a copy of PVNGS calculation 13-NS-B25, Risk Impact of Extending the TS LCO for EDG B.
Should you have any questions, please contact Richard A. Bernier at (602) 393-5882.
Sincerely, Angela K. Krainik, Manager Nuclear Licensing AKK/RAB/did Enclosure I
!F405050292 940427 PDR ADOCK 05000529 P
'DR
~ rA
Document Control Desk U. S. Nuclear Regulatory Commission PVNGS, U-2 Request for Notice of Enforcement Discretion Page 2 cc:
L. J. Callan K. E. Perkins K. E. Johnston B. E. Holian A. V. Godwin USNRC USNRC USNRC USNRC ARRA
t tr fi J
tl lt ll I