ML17310B224

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-528/94-201,50-529/94-201,50-530/94-201 on 940406.No Violations Noted
ML17310B224
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/13/1994
From: Roe J
Office of Nuclear Reactor Regulation
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17310B225 List:
References
NUDOCS 9404200041
Download: ML17310B224 (14)


See also: IR 05000528/1994201

Text

UNITED STATES

NUCLEAR RE

G ULATORY COMMISSION

WASHINGTON, D.C. 20555

April 13,

1994

Docket Nos.

50-528

50-529

50-530

Mr. William F.

Conway

Executive Vice President

Arizona Public Service

Company

P.O.

Box 53999

Phoenix,

Arizona 85072-3999

Dear Hr. Conway:

0

SUBJECT:

NRC

INSPECTION

REPORT 50-528/94-201,

50-529/94-201,

AND 50-530/94-

201,

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2,

and 3,

STATION BLACKOUT INSPECTION

This letter transmits

the report of the U.S. Nuclear Regulatory

Commission

(NRC) station blackout

(SBO) inspection,

conducted

from February

28 through

Harch 4,

1994, of activities authorized

by

NRC Operating

License

Nos.

NPF-41,

NPF-51

and

NPF-74 for the Palo Verde Nuclear Generating Station,

Units 1, 2,

and 3.

The inspection

was conducted

by the Special

Inspection

Branch of the

Office of Nuclear Reactor Regulation

(NRR), with staff from NRR and

Region

IV

and

a consultant.

The purpose of this inspection

was to review your programs,

procedures,

training, equipment,

systems,

and supporting documentation

for

implementing the

SBO rule,

10 CFR 50.63.

At the conclusion of the inspection

on Harch 4,

1994,

the team's

findings were discussed

with

Hr. J.

H. Levine

and members of your staff.

The team concluded that the

SBO rule had,

in general,

been satisfactorily

implemented

at Palo Verde.

While the station blackout rule implementation for

Unit

1 has

been

completed

and is operational,

we understand

that the

switchgear modifications

and testing for Units

2 and

3 will be completed

according to the schedule

previously stated

in your correspondence

with the

NRC.

The team identified minor deficiencies

in the Class

1E battery sizing

calculation

and the

SBO emergency

operating

procedure.

Your staff has

committed to resolve

these

issues.

The quality of the design

change

package

and its installation, administrative controls for maintaining the availability

and operability of gas turbine generators,

and the self-assessment

of SBO

implementation,

were considered

to be strengths.

~), l1

P~OS>~~c ii ~<

'gg<.oA

ckr'C

l80620

t,.t (

r)I

ImC AI.E CFgT@ ~py

II vh4

4

4lI i

4

~

~

~

Mr. William F

~

Conway

April 13,

1994

No response

to this letter is required.

The

NRC Region

IV staff will issue

any enforcement

actions that

may result from this inspection.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this letter

and

inspection report will be placed in the

NRC Public Document

Room.

Should you

have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Jack

W. Roe, Director

Division of Reactor Projects,

III/IV/V

Office of Nuclear Reactor Regulation

Enclosure:

Inspection

Report 50-528/94-201,

50-529/94-201,

and 50-530/94-201

cc:

See

page

3

gI

e

April 13,

1994

Sincerely,

Original signed

by Elinor G.

Adensam for

Mr. Will>am F.

Conway

2

s

ii

No response

to this letter is required.

The

NRC Region

IV staff will issue

any enforcement

actions that

may result from this inspection.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a copy of this letter and

inspection report will be placed in the

NRC Public Document

Room.

Should you

have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Enclosure:

Inspection

Report 50-528/94-201,

50-529/94-201,

and 50-530/94-201

cc:

See

page

3

Distribution:

See

page

4

~

~

Jack

W. Roe, Director

Division of Reactor Projects,

III/IV/V

Office of Nuclear Reactor Regulation

  • Previously Concurred

OFFICE:

RSIB DRIL*

TECH EDITOR*

RV*

NRR EELB*

NAME:

DATE:

RMathew:sf

03/28 94

PKleene

03 21/94

FGee

03

2 /94

APal

03/28/94

OFFICE:

NAME:

DATE:

OFFICE:

NAME:

NRR SPLB*

DShum

03

25 94

DD

L NRR

RHWessman

PSKoltay

03 25/94

Imbro

04

94

D

D

NRR

RPW

CERossi

'

NRoe

SC RSIB

L* 'B DRIL

b F8&A" C,orgcd.n

o~ isla

DATE:

,. '4/

/94

OFFICIAL RECORD

COPY

04

/94

i

04

3 94

OCUMENT NAME:

G:'LPALOVERD

0

I

I

~ I

i

l

I"

li

a

~

~

~

cc:

See

page

3

Dist ibution:

See

page

4

  • Previo sly Concurred

DPPICE: X

RSIB DRI L

TECH EDITOR*

RV I++ m

NRR

EELB

NAME:

DATE:

OFFICE:

NAME:

DATE:

RMathew:sf

i03

94

NRR,SPLB

DShumi'8

03/2

94

PKleene

03

21

94

SC RSIB DRQ.

PSKoltay j~

03 g$ 94

FGee

03

94

C RSIB DRIL

EVImbro

03/

/94

APal

03 2f 94

OFFICE:

DD DRIL NRRX

D DRIL NRR

DRPN NRR

NAME:

DATE:

RHWessman

03/

/94

, CERossi:

JWRoe

03J

/94

03/

/94

OFFICIAL RECORD

COPY

DOCUMENT NAME:

G:iPALOVERD

u

0

f

l

~

~

Mr. William F.

Conway

April 13,

1994

No response

to this letter is required.

The

NRC Region

IV staff will issue

any enforcement

actions that

may result from this inspection.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a c'py of this letter

and

inspection report will be placed in the

NRC Public Document

Room.

Should you

have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Original signed

by Elinor G.

Adensam for

Enclosure:

Inspection

Report 50-528/94-201,

50-529/94-201,

and 50-530/94-201

cc:

See

page

3

Jack

W. Roe, Director

Division of 'Reactor Projects,

III/IV/V

Office of Nuclear

Reactor Regulation

  • Previously Concurred

OFFICE:

RSIB DRIL*

TECH EDITOR*

RV*

NRR EELB*

NAME:

DATE:

RMathew:sf

03 28/94

PKleene

03

21

94

FGee

g3/2 /94

APal

03/28/94

OFFICE:

NAME:

DATE:

NRR/SPLB*

DShum

03 25/94

PSKoltay

i

VImbro

04

94

03

25 94

SC RSIB

L*

'6

IB DRIL

OFFICE:

NAME:

DD

L NRR

RHWessman

04/

/94

D

D

NRR

CERossi

04

/94

RPW

Roe

04/ 3/94

OFFICIAL RECORD

COPY

~ ~ DOCUMENT NAME:

G:iPALOVERD

l

Arizona Public Service

Company

Palo Verde Nuclear Generating

Station,

Units 1, 2,

and

3

CC:

Mr. Steve

Olea

Arizona Corporation

Commission

1200

W. Washington Street

Phoenix,

Arizona

85007

James

A. Beoletto,

Esq.

Southern California Edison

Company

P. 0.

Box 800

Rosemead,

California

91770

Senior Resident

Inspector

Palo Verde Nuclear Generating

Station

5951

S. Wintersburg

Road

Tonopah,

Arizona

85354-7537

Regional Administrator,

Region

IV

U.

S. Nuclear Regulatory

Commission

Harris Tower

5 Pavilion

611

Ryan Plaza Drive, Suite

400

Arlington, Texas

76011-8064

Mr. Charles

B. Brinkman,

Manager

Washington

Nuclear Operations

ABB Combustion

Engineering

Nuclear

Power

12300 Twinbrook Parkway,

Suite

330

Rockville, Maryland

20852

Mr. Aubrey V. Godwin, Director

Arizona Radiation Regulatory

Agency

4814 South

40 Street

Phoenix,

Arizona

85040

Jack

R.

Newman,

Esq.

Newman

& Holtzinger,

P.C.

1615

L Street,

N.W., Suite

1000

Washington,

D.C.

20036

Mr. Curtis Hoskins

Executive Vice President

and

Chief Operating Officer

Palo Verde Services

2025

N. 3rd Street,

Suite

220

Phoenix,

Arizona

85004

Roy P.

Lessey, Jr.,

Esq.

Akin, Gump, Strauss,

Haver

and Feld

El

Paso Electric Company

1333

New Hampshire Ave., Suite

400

Washington,

D.C.

20036

Ms. Angela K. Krainik, Manager

Nuclear Licensing

Arizona Public Service

Company

P. 0.

Box 52034

Phoenix,

Arizona

85072-2034

Chairman

Maricopa County Board of Supervisors

111 South Third Avenue

Phoenix,

Arizona

85003

I

j

i

I

Distributi on:

Docket Files 50-528,50-52S

and 50-530

RSIB R/F

DRIL R/F

FJHiraglia,

NRR

WTRussell,

NRR

LReyes,

NRR

CERossi,

NRR

ACThadani,

NRR

RHWessman,

NRR

EVImbro,

NRR

PSKoltay,

NRR

RLSpessard,

AEOD

JWRoe,

NRR

TRguay,

NRR

BEHolian,

NRR

DJFoster-Curseen,

NRR

KEJohnston,

RIV

WAng,

RIV

Regional Administrators

Regional Division Directors

Inspection

Team

LPDR

PDR

ACRS (3)

OGC (3)

IS Distribution