ML17310B176
| ML17310B176 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/27/1993 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17310B177 | List: |
| References | |
| 102-02658-WFC-R, 102-2658-WFC-R, GL-92-08, GL-92-8, NUDOCS 9404130147 | |
| Download: ML17310B176 (4) | |
Text
ACCELERATED DIS UTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9404130147 DOC.DATE: 93/09/27 NOTARIZED: NO DOCKET I FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co. (formerly Arizona Nuclear Power R
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) g 0
SUBJECT:
Provides response to request for addi info re GL 92-08.
D DISTRIBUTION CODE:
A029D COPIES RECEIVED:LTR J ENCL g SIZE:
TITLE: Generic Letter 92-008 Thermal-Log 330 Fare Barrier NOTES:STANDARDIZED PLANT Standardized plant;
,,Standardized plant.
RECIPIENT ID CODE/NAME PDIV-3 LA HOLIAN, B INTERNAL: NRR/DE/EELB NRR/DS SA/S PLB RGN4
....FILE EXTERNAL: NRC PDR COPIES LTTR ENCL 1
0 1
1 1
1 2
2 1
1 1
1 RECIPIENT ID CODE/NAME PDIV-3 PD TRAN,L N.RR/J3XRNN D3 1
G FILE 01 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 05000528 05000529 05000530 A D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT COIL'ROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISfS FOR DOCUMENTS YOU DON'T NEEDl I
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL ll
g t
4
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX. ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 102-02658-WFC/RAB/JNI September 27, 1993 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Response to Request for Additional Information - Generic Letter 92-08 File: 93-010-026 Arizona Public Service Company (APS) providedthe NRC with a response to Generic Letter 92-08, in a letter from W. F. Conway, dated April 16, 1993.
The NRC requested additional information in a letter dated July 21, 1993. APS'esponse is provided in the enclosures to this letter.
Should you have any questions, please contact Richard A. Bernier at (602) 393-5882.
. Sincerely, WFC/RAB/JNI/bcf
Enclosures:
- 1. APS Response
- 2. Calculation 13-EC-ZA-300 Revision 3
- 3. Bechtel TPO Design Guide E2.6.4 Revision 2
- 4. Calculation 13-EC-PA-210 Revision 5
- 5. APS Introduction and Bechtel Memorandum IOM-E-13521, Dated February 18, 1987
- 6. Ampacities For Cables In Randomly Filled Trays CC:
B. H. Faulkenberry C. M. Trammell J. A. Sloan C
lI~OgI3OIg7 lI30927
. PDR
.AD'OOK ODOOO328 p
. 'DR