ML17310B088

From kanterella
Jump to navigation Jump to search
Forwards SG Tube Insp Plan, Per NRC 930819 Request
ML17310B088
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/02/1994
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17310B089 List:
References
102-02847-JML-R, 102-2847-JML-R, NUDOCS 9403100193
Download: ML17310B088 (6)


Text

ACCELERATED DISTIUBUTION DEMONSTPWTION SYSTEM

~ 0 ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9403100193 DOC.DATE: 94/03/02 NOTARIZED: YES DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "SG Tube Insp Plan," per NRC 930819 request.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution g ENCL t SIZE: oP+ D NOTES:Standardized plant. 05000530

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA 1 1 PDV PD 1 1 TRAN, L 2 2 D INTERNAL: ACRS 6 6 NRR/DE/EELB 1 1 D NRR/DORS/OTS B 1 1 NRR/DRCH/HICB 1 1 NRR/DRPW 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 0 /+SB 1 0 OGC/HDS 1 1 0 REC FILE 01 1 1 EXTERNAL NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20

~ ~ ~ ~

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PMOEN I X. ARIZONA 85072-2034 JAMES M. LEVINE 102-02847-JML/RAB/JRP VICE PRESIDENT NUCLEAR PRODUCTION March 2, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Reference:

Letter dated August 19, 1993, from T. E. Murley, Director, Office of Nuclear Reactor Regulation, USNRC, to W. F. Conway, Executive Vice President,.

Nuclear, APS

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No. STN 50-530 Steam Generator Tube Inspection Plan File: 94-056-026 By the referenced letter dated August 19, 1993, the NRC required that Arizona Public Service Company (APS) provide the scope of the Unit 3 Eddy Current Testing (ECT) inspection prior to the scheduled start of the inspection. The enclosure to this letter contains the initial inspection scope and the criteria for expansion.

Should you have any questions, please contact Richard A. Bernier at (602) 393-5882.

Sincerely, mes M. Levine, Vice President uclear Production JML/RAB/J RP/rv Enclosure cc: W. F. Conway K. E. Perkins K. E. Johnston B. E. Holian 9403100193 940302 PDR ,ADOCK 05000530 9 PDR .

0 ~ ~ ~

tlat 1,

S t> ~

'E h

STATE OF ARIZONA )

) ss.

COUNTY OF MARICOPA )

I, J. M. Levine, represent that I am Vice President Nuclear Production, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true and correct.

J. M. Levine Sworn To Before Me This ~rhI Day Of , 1994.

No ary Public My Commission Expires gy Comm~ Eylrtmt@v,7, 1@5

~ ~ ~ ~

.S<~Ã~~+

K tt I

> s k),fe,l