Informs That During Recent Unit 1 Cycle 5 Reload,New Fuel Assemblies Installed Under Provisions of 10CFR50.59, Containing Guardian Debris Resistant Grid Design Feature. PVNGS Unit 1 Cycle 5 Startup Rept Encl
ML17310B082
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/24/1994
From: Krainik A
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17310B078 List:
References
102-02842-AKK-R, 102-2842-AKK-R, NUDOCS 9403090144
Download: ML17310B082 (5)


Text

TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

SUBJECT:

Informs that during recent Unit 1 Cycle 5 reload, new fuel assemblies installed under provisions of 10CFR50.59, containinq Guardian debris resistant grid design feature.

"PVNGS Unat 1 Cycle 5 Startup Rept" encl.

DISTRIBUTION CODE:

IE26D COPIES RECEIVED:LTR g ENCL

~

SIZE:

+

TITLE: Startup Report/Refuel'ing Report (per Tech Specs)

/

05000528 NOTES:STANDARDIZED PLANT ACCESSION NBR:9403090144 DOC.DATE: 94/02/24 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH.NAME AUTHOR AFFILIATION KRAINIK,A.K.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

RECIPIENT ID CODE/NAME PDV PD TRAN,L COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1

1 POLICH, T 2

2 COPIES LTTR ENCL 2

2 INTERNAL: ACRS kR/~RX*B REG FILE EXTERNAL: NRC PDR 02 5

5 1

1 1

1 1

1 AEOD/DSP/TPAB NUDOCS-ABSTRACT RGN5 FILE 01 NSIC 1

1 1

1 1

1 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAEvIE FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL 17

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034

~

PHOENIX, ARIZONA85072-2034 102-02842-AKK/RAB/GAM February 24, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Mr. Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 Unit 1 Cycle 5 Startup Report File: 94-160-419 During the recent Unit 1 Cycle 5 reload, new fuel assemblies were installed, under the provisions of 10 CFR 50.59, that contain a Guardian debris resistant grid design feature.

Unit 1 Cycle 5 startup test results show that the nuclear, thermal, and hydraulic performance of the plant has not been altered by the use of the new fuel assemblies with the Guardian'grid design.

PVNGS Unit 1 Technical Specification 6.9.1.1 requires that a startup report be submitted to the Regional Administrator following installation of fuel that has a different design.

In accordance with this Technical Specification, the Unit 1 Cycle 5 Startup Report is enclosed.

n~nn9 Q

9403090144 940224 PDR ADOt K 05000528 P

PDR

I II I l 1

,I (I

I U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Unit 1 Cycle 5 Startup Report Page 2 Should you have any questions, please contact R. A. Bernier at (602) 393-5882.

Sincerely, Angela K. Krainik, Manager, Nuclear Licensing AKK/RAB/GAM/rv Enclosure cc: