ML17310B047
| ML17310B047 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/15/1994 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-02830-JML-R, 102-2830-JML-R, GL-89-10, NUDOCS 9402250140 | |
| Download: ML17310B047 (4) | |
Text
ACCELERATED DISTRIBUTION DEMONST$&TION SYSTEM REGULATORY XNFORMATION DXSTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9402250140 DOC.DATE: 94/02/15 NOTARXZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFXLIATION LEVINE,J.M.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
I
SUBJECT:
Informs that based upon schedule for receipt of listed addi D
repts,util final evaluation, including determination of appropriate corrective actions in response to GL 89-10,Suppl S
5 will be submitted by 940715.
DISTRIBUTION CODE:
A064D COPIES RECEIVED:LTRj ENCL 0 SIZE:
/
TITLE: Response to Generic Ltr 89-10, "Safety-Related MOV Testing
& Surveill +
NOTES:STANDARDIZED PLANT 05000528 Standardized plant.
05000529 Standardized plant.
05000530 D RECIPIENT ID CODE/NAME PDV PD TRAN,L INTERNAL ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB NRR/PD111-3 RES/DSIR EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME
- POLICH, T
AEOD/DSP/ROAB NRR/DE/EMEB NRR DRPW OGCB G F LE 01 IB/B NSIC COPXES LTTR ENCL R
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 15 ENCL
I'
JAMES M. LEVINE VICE PRESIOENT NUCLEAR PRODUCTION Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX. ARIZONA85072-2034 102-02830-JML/RAB/SAB February 15, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 NRC Generic Letter 89-10, Supplement 5, Inaccuracy of Motor-Operated Valve Diagnostic Equipment File: 94-010-026 94-180-419 By letter dated September 28, 1993, Arizona Public Service Company (APS) responded to Supplement 5 of NRC Generic Letter 89-10.
APS'etter indicated that vendor information regarding the accuracy of stem-mounted strain gauges would be evaluated for its effect on motor-operated valve test data by February 15, 1994.
As a result of APS'eview of the initial reports, additional information has been requested from the vendor to address stem-mounted strain gauge accuracy for each of the installation configurations used at PVNGS. Based upon the schedule for receipt of these additional reports, APS'inal evaluation, including the determination of appropriate corrective actions, will be completed by July 15, 1994.
Should you have any questions, please contact Richard A. Bernier at (602) 393-5882.
Sincerely, WFC/RAB/SAB/rv cc:
K. E. Perkins K. E. Johnston B. E. Holian 94022SOi40 940215 PDR ADOCK 05000528 i,
P PDR
erg l