Forwards Insp Repts 50-528/93-55,50-529/93-55,& 50-530/93-55 on 931207-940110.No Violations or Deviations Noted
ML17310B041
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/08/1994
From: Van Denburgh C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17310B042 List:
References
NUDOCS 9402230069
Download: ML17310B041 (8)


See also: IR 05000528/1993055

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET ¹

05000528

05000529

05000530

S/

05000526

05000529

05000530

NOTES:STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

ACCESSION NBR:9402230069

DOC.DATE: 94/02/08

NOTARIZED:

NO

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

t

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

AUTH.NAME

AUTHOR AFFILIATION

VANDENBURGH,C.

Region

5 (Post

820201)

RECIP.NAME

RECIPIENT AFFZLIATION

R

CONWAYiW.F.

Arizona Public Service

Co. (formerly Arizona Nuclear

Power

I

SUBJECT: Forwards'nsp

repts 50-528/93-55,50-529/93-55,&

50-530/93-55

on.931207.-940110.No

violations or deviations

noted.

0

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

RECIPIENT

ID CODE/NAME

PDV PD

TRAN,L

ZNTERNAL: ACRS

AEOD/DSP/ROAB

t

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS1

RES/HFB

EXTERNAL

EG&G/BRYCEiJ

~ H ~

NSIC

COPIES

LTTR ENCL

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POLICH,

T

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

I!

NRR/DRCH/HHFB

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

OE~J

EG

ILE

02

GN

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

l

{

f

g0,8 <fCV~

(4

%p0

++*<<+

F'$9

D S

$99<

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTGREEK, CALIFORNIA94596-5368

Docket Nos.

50-528,

50-529,

and 50-530

License

Nos.

NPF-41,

NPF-51,

and NPF-74

Arizona Public Service

Company

P.O.

Box 53999, Station

9082

Phoenix,

Arizona

85072-3999

Attention:

Mr. W. F.

Conway

Executive Vice President,

Nuclear

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-528,529,530/93-55

This refers to the inspection

conducted

by K. Johnston,

H. Freeman,

J. Kramer,

and A. MacDougall of this office, and T. Alley, of the Department of Energy,

on December

7,

1993,

through January

10,

1994.

The inspection

included

a

review of activities auth'orized for your Palo Verde facility; At the

conclusion of the inspection,

the findings were discussed

with those

members

of your staff identifi'ed in the enclosed report.

Areas examined during the inspection are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

No violations or deviations

were identified within the scope of this

inspection.

However, the inspection identified an issue that appears

similar

to the root cause of,a recent violation involving the failure to accomplish

surveillance

actions within the Technical Specifications

time requirements

following the removal of an emergency

diesel

generator

from service.

The

inspectors

noted that

a surveillance

test which verified the operability of

associated

equipment

was not performed

when

a tr ain of the essential

chilled

water system in Unit

1 was taken out of service

on December

10,

1993 for

planned corrective maintenance.

Although the essential

chilled water system

was restored within

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> as required

by Technical

Speci fications, this

restoration

took 57 minutes

and action had not been initiated within this time

to perform the required verifications.

We are concerned that the shift

supervisor took an unnecessary

risk in not performing the verification earlier

and that there

was not sufficient management

guidance provided concerning

when

.

this surveillance verification must be initiated.

In accordance

with 10 CFR Part 2.790 of the NRC's "Rules of Practice,"

a copy

of this letter and its enclosures will be placed in the

NRC Public Document

Room.

94022300h9

940208

PDR

ADOCK 05000528

6

PDR

,

l

I

2

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

C. A. VanDenburgh,

c ing Deputy Director

Division of Reactor

afety and Projects

Enclosure:

Inspection

Report

Numbers

50-528,529,530/93-55

cc w/enclosure:

Mr. Steve Olea, Arizona Corporation

Commission

Hr. James

A. Beoletto,

Esq.,

Southern California Edison

Company

Hr. Charles

B. Brinkman, Manager,

Washington

Nuclear Operations

Hr. Aubrey Godwin, Director, Arizona Radiation Regulatory

Agency

(ARRA)

Chairman,

Haricopa County Board of Supervisors

Mr. Jack

R.

Newman,

Esq.,

Newman

& Holtzinger P.

C.

Hr. Curtis L. Hoskins,

Executive Vice President

and Chief Operating Officer,

Palo Verde Services

Mr: Roy P.

Lessey, Jr.,-Esq.,

Akin, Gump, Strauss,

Hauer and Feld

Hr. Bradley

W. Jones,

Esq., Akin, Gump, Strauss,

Hauer and Feld

Mr. Ronald J. Stevens,

Director, Nuclear Regulatory

and Industry Affairs,

Arizona Public Service

Company

i

l

i

bcc w/enclosure:

Docket file

G.

Cook

B. Faulkenberry

S. Richards

D. Sullivan (electronic copy)

Resident

Inspector

(5)

Project Inspector

bcc w/o enclosure:

LFMB

M. Smith

KJohnston

4 /'7 /94

HFreeman

JKramer

2 /g/94

w/'7/94

AMacDougall

2. /7/94

REQUEST

C

PY

REQUEST

C

Y

REQUEST

Y

YES

0

YES

YES

NO

REQUEST

Y

YES

NO

TAlley~

M/Q/94~

H ong

CVan

n

ey

>/~/94

W/g/94

/

4

REQUEST

Y

REQUEST

COPY

EQ

ST

COPY

YES

0

NO

YES

NO

RE

COPY

Y

S

0

0 TO

PDR

]

TO "DCS

]

ES

NO

ES

NO

DOCUMENT LOCATION: G:XPS2KPVNGSXINSPRPTSXPV-93-55.FNL

i

i((

l,('

I

i

~ft I

q'i

'

1 ~