Forwards Completed & Signed Form 474, Simulation Facility Certification, for Each Unit & 1993 Certification Submittal Simulation Facility Simulator Training Suite a
ML17310A874
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/29/1993
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17310A875 List:
References
102-02771-WFC-G, 102-2771-WFC-G, NUDOCS 9401070232
Download: ML17310A874 (10)


Text

ACCELERATED DISTRIBUTION DEMONRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET g

05000528 05000529 05000530 ACCESSION NBR:9401070232 DOC.DATE: 93/12/29 NOTARIZED: NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit, 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards completed 6 signed Form 474, "Simulation Facility Certification," for each unit

& "1993 Certification Submittal Simulation Facility Simulator Training Suite A."

S DISTRXBUTXON CODE:

R005D COPIES RECEIVED:LTR

(

ENCL f

SIZE'ITLE:

Simulator Facility Certification

/

NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

05000528 A 05000529 05000530 0 RECIPIENT ID CODE/NAME HOL INTERNA.

CENTRAL FILE 01 EXTERNAL' PDR COPIES LTTR ENCL 1

1 1

1 1

1 RECIPIENT ID CODE/NAME TRAN,L NRR/DRCH/HOLB COPIES LTTR ENCL 1

1 R

D A

NOTE TO ALL"RIDS" RECIPIENTS:

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 5

ENCL 5

WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR Arizona Public Service Company P.O, BOX 53999

~

PHOENIX. ARIZONA85072-3999 102-02771-WFC-6EC December 29, 1993 10 CFR 55.45(b)

Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Reference:

Letter dated March 26, 1991, from W. F. Conway, Executive Vice President Nuclear, Arizona Public Service Company, to Director, Office of Nuclear Reactor Regulation, NRC

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Simulation Facility Certification File: 93-056-026 Arizona Public Service Company (APS), in accordance with 10 CFR 55.45(b)(3)(iii),

hereby certifies the PVNGS Unit 1 Plant Referenced Simulation Facility, Simulator Training Suite A, pursuant to 10CFR55.45(b)(1)(ii).

A completed, signed NRC Form 474, "Simulation Facility Certification," is included for each PVNGS Unit (Enclosures 1, 2, and

3) and one copy of the 1993 Certification Submittal, which constitutes the supporting documentation, is also included (Enclosure 4).

The 1993 Certification Submittal includes a certification package overview and general simulator information, as well as detailed information concerning certification exemptions and justification, performance test abstracts, a schedule for periodic test performance, a discussion of simulator capabilities and environment, simulator discrepancies, and differences between the simulator and the individual PVNGS units. This 1993 Certification Submittal includes only those Malfunction Test Abstracts (Section 7b of Enclosure 4) identified in Section 3.1.2, Plant Malfunctions, ofANSI/ANS-3.5-1 985, Nuclear Power Plant Simulators for Use in Operator Testing. An assessment of training needs with respect to malfunction development and testing led to the preparation of approximately 200 malfunctions in excess of the ANSI/ANS-3.5-1985 requirements.

APS will comply with the requirement of 10 CFR 55.45(b)(5)(ii) that licensees "Submit, every four years on the anniversary of the certification, a report to the Commission which 9401070232 931229 PDR ADOCK"05000528 P

PDR

l t',

j

~ ~

A I

Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Simulation Facility Certification Page 2 i

identifies any uncorrected performance test failures, and submit a schedule for correction of such performance test failures, if any." Appropriate controls have been instituted to ensure compliance with this requirement.

On March 26, 1991, APS certified a simulator facilityfor PVNGS. At some time following the certification of this new simulator facility (Simulator Training Suite A), the simulator certified in the above referenced letter will no longer be used for training or for administering operating tests at PVNGS. An additional simulator training suite, Simulator Training Suite B, willuse components from the simulator certified in 1991. This simulator willbe located adjacent to Simulator Training Suite A herein certified and is scheduled to be operational in 1994.

At that time, APS will submit an amended Simulator Facility Certification that will encompass both Simulator Training Suites A and B.

Should you have any questions or require further information, please contact Richard A.

Bernier at (602) 340-5882.

Sincerely, WFC/8EC/did Enclosures Simulator Facility Certification - PVNGS Unit 1 2..

Simulator Facility Certification - PVNGS Unit 2 3.

Simulator Facility Certification - PVNGS Unit 3 4.

PVNGS Simulator Certification Submittal - 1993 CC:

(w/enclosures)

Document Control Desk (w/enclosures)

B. F. Faulkenberry (w/enclosures)

L. F. Miller P. J. Morrill K. E. Johnston

k t

1

(

ENCLOSURE 1 PALO VERDE NUCLEAR GENERATING STATION UNIT 1 SIMULATIONFACILITYCERTIFICATION NRC FORM 474

'(

NRC FORM 474

'(10 A)

. NUCLEAR REGULATORYCOMMISSION APPROVED BYOMS: NO. 51504155 EXPIRES: IO/SI/S5 SIMULATIONFACILITYCERTIFICATION ESTIMATED BURDEN PER

RESPONSE

TO COMPLY WITH 'HIS INFORMATION COLLECTIOM REOU EST!

120 HOURS.

FORWARD COMMENTS REGARDING BURDEN ESRMATE TO THE fMFORMATIONAND REcoRDs MANAGEMENT BRANcH IMNsB771s),

U.s.

NUcLEAR REGULATORY COMMISSION, WASHINGTON, DC 205554I, AND TO THE PAPERWORK REDVCllOMPROJECT (51 500 158), OFRCE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20500.

INsTRUcTIDNs: This tonn b to be Ned tor In@at cerohcaoon, receiohcation (d requtredj, and for any change to a stmutaoon facktty pertonnance tesong pbn made atter IrNat submioal ot such a ptsn Pfovkte Ole fallowing information and chock the appoprale box 10 Indbete reason fofsubminei, FACIUTY

'alo Verde Nuclear Generating Station, Unit 1 UCENSEE Arizona Public Service Company I-528 This b to cattily that:

1.

The above named tacky 5censee b using a slmulaibn tacNy consbdng solely of a ptantMerenced stmubtor that meets the requirements of 10 CFR 55A5.

2.

Documentathn b available tor NRC review In accordance with 10 CFR 55A5(b).

S.

Thb shou!aden tacgtry meets the guidance contain<<i In ANSI/ANSL5, 1055, as endorsed by NRC Regirbtory Gcdde 1149.

O there are any EXCEPTIONS lo the cerUtlcatlon of this Item, CHECK HERE IXI and descdbe fu5y on addidonal pages as ecessary.

NAME(or other Idendltcedcn) AND LOCAllOMOF SIMULATIONFATTY.

Palo Verde Nuclear Generating Station Unit1 Plant Reference Simulation Facility, Simulator Training Suite A; Palo Verde Nuclear Generating Station, Wintersburg, Arizona SIMVLATKIMFACIUTYPERFORMANCE TEST ABSTRACTS ATTACHED. (Far Performance tests canducted br the Period enkng withthe date olthis cad)deaden)

DESCRIPDON OF PERFORMANCE TESTOIG COMPLETED. (Attach eddldonei pages as necessary end Idendly the Item descrfpdon being conb'nuect)

Refer to the PVNGS Simulator Certification Submittal - 1993, enclosed with this Simulation Facility Certification slMULATIOMFACILITYPERFORMANCE TESTING SCHEDULE ATTACHED. (Forthe canduct ofeppnufmstefy 25'fperformance tests per year Ibr the foie year period commencing wrth the date ofthb cerc7rcsbors)

DESCIOPTlON OF PERFORMANCE TESTOIG TO BE CONDUCTED. (Attach eddldonsI psgat es necessary and Idendfy the Item description being condnuerL)

Refer to the PVNGS Simulator Certification Submittal - 1993, enclosed with this Simulation Facility Certification PERFoRMANGE TEBTUIG pLAN GHANGE. (For any modidcedon to e perfomvence teso'ng plan submitted on e previous certrdcedors)

DESCRIPROM OF PERFORMANCE TESTOIG PLAN CHANGE Plttech eddldonel pages as necessary end Idendly the item descrtpc'on being condnuect)

Not Applicable REGERIIFcATIDN (Describe correcdve ecbons tskerL attach resuhs ofcompleted perfcnnence toss'ng br ecconfence vvfth 10 cFR K,s5(b)(5)(vJ.

(Attach eddisbnsi pager es necessary end idendly the hem descrfpbbn being condnu<<L)

Anytahe statement or ombsion In thb document, induding atiachmenb, mey be subject to cMI and criminal sanctions.

I ceroty under penalty at perjury that the Intormaoon In thb document and attachments b true and correcL SIGNATURE-AUTHORIZEDREPRESENTATIVE Executive Vice President, Nuclear

/2/Zg/gy In accord with 10 CFR 55.

mmunicaOons, this torm shall be submitted to the NRC es follovrst BY ADDRESSED T DIRECTOR, OFFICE OF NUCLEAR REACTOR REGULATION UB. NUCLEAR REGULATORYCOMMISSION WASHINGTON, DC 205554001 NRc FoRM 474 I10.02)

BY DEUVERY tM PERSON TO THE NRC OFFICE AT:

ONE WHITE FUNT NORTH 11555 ROCKVILLEPIKE ROCKVILLE,MD PRIMIED ON RECYCLED PAPER

C ~

~

~

1-