FORD 1 REGUL ORY INFORNATION DISTR IBUTIuN SYSTEN (R IDS)
ACCESSION NBR: 9312030066 DOC. DATE: 93/11/08 NOTARIZED:
NO FACIL:STN-50-528 Palo Verde Nuclear Stationi Unit li Arizona Publi STN-50-529 Palo Verde Nuclear Stationi Unit 2i Arizona Publi STN-50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi AUTH. NANE AUTHOR AFFILIATION FAULKENBERRY>B.
Region 5 (Post 820201)
RECIP. NAME RECIPIENT AFFILIATION CONWAY> M. F.
Arizona Public Service Co.
(formerlg Arizona Nucl
SUBJECT:
Confirms revised commitments made in encl 931027 ltr re modifying criteria for expanding eddy current testing of tubes in facility steam generators.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: STANDARDIZED PLANT Standardi zed plant.
Standardized plant.
DOCKET 0 05000528 0500052'9 05000530 ear Poeer R
S/
O5OOO528 "
05000529 05000530 0
RECIPIENT ID CODE/NAME PDV PD TRANi L COPIES LTTR ENCL 1
1 1
1 REC IP IENT ID CODE/MANE HOLIANe B COP IES LTTR ENCL 1
1 INTERNAL:
ACRS AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/DR IL/RPEB NRR/PNAS/ILPB 1 NUDOCS-ABSTRACT OGC/HDS1 RES/HFB 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 AEOD/DEI8 AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE D.IP.
oz RQN5 FILE 01 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 D
0 C
EXTERNAL: EGzG/BRYCEi J. H.
NSIC 1
1 1
1 NRC PDR 1
1 YOTE TO ALL RIDS RECIPIENTS PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT COYTROL DESK.
ROOM'P I-37 (EXT. 504-2065) TO ELIMINATEYOUR YAME FROM DISTRIBUTIOY LISTS FOR DOCUMEYTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL 25
~
~y,R RECy P0 i~
nO I
C>
0
/p ++*++
~-
UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIALANE-WALNUTCREEK, CALIFORNIA94596-S368 QOV 08 i993 Docket:
50-528/529/530 License:
NPF-41, NPF-51, and NPF-74 CAL:
5-93-004 (Revised)
Arizona Public Service Company P.
O.
Box 53999, Station 9082 Phoenix, Arizona 85072-3999 Attention:
Hr.
W. F.
Conway Executive Vice President, Nuclear
SUBJECT:
=
REVISED CONFIRMATORY ACTION LETTER:
E.
SIMPSON LETTER DATED OCTOBER 27, 1993 This letter is to confirm the revised commitments made in the Arizona Public Service Company (APS) letter dated October 27, 1993 (Enclosure 1).
.The October, 27, 1993, letter modified the criteria for expanding the eddy 'current testing of certain. tubes in the Unit 1 steam generators.
The criteria for
'ddy current testing expansion were originally described in your September 17, 1993, letter to the NRC.
We understand that the other provisions of the September 29, 1993, letter remain in effect, as well as the actions stated in our October 4,
1993, letter to APS (Enclosure 2 original Confirmatory Action Letter).
Therefore, our October 4, 1993, letter is'til) applicable, with the exception of Item 3, which is replaced by the commitment that you will now implement the Unit 1
Steam Generator Inspection PIlan as desciibed in the APS letter of October 27, 1993.
The proposed change to the Unit 1 Inspection Plan was discussed with the NRC staff on October 14 and 15, 1993.
Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C.
- 2232, and 10 CFR 2.204, you are required to:
1.
Notify me immediately if your understanding differs from that set forth above.
2.
Notify me in writing if for any reason you cannot complete the actions specified in your September 29, 1993, letter as clarified above.
3.
Notify me in writing when you have completed the actions addressed in the Confirmatory Action Letter.
Issuance of this revised Confirmatory Action Letter does not preclude issuance of an Order formalizing the above commitments or requiring other actions on the part of the licensee.
Nor does it preclude the NRC from taking enforcement action for violations of NRC requirements that may have prompted the issuance of this letter.
In addition, failure to take the actions 93120300hb 931108 i PDR ADOCK 05000528 P
PDR (0.
addressed in this Confirmatory Action Letter may-result in enforcement action.
The responses directed in this letter are not subject to the clearance procedures of the Office of Hanagement and Budget as. required by the Paperwork Reduction Act of 1980, Pub.
L. No.96-511.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Sincer ely, (X(~y
Enclosures:
As stated Regi onal Administrator
0-3 a cc
~
M'.
Hr.
Hr.
Hr.
Chai Hr.
Hr.
Hr.
Hr.
Hr.
'I Steve Olea, Chief Engineer, Arizona Corporation Commission James-A.
- Beoletto, Esq.', Assistant Council, Southern California Edison Co.
Charles B. Brinkman, Combustion Engineering, Inc:
Aubrey Godwin, Director, Arizona Radiation Regulatory Agency (ARRA) rman, Haricopa County Board of Supervisors Jack R.
- Newman, Esq.,"
Newman 5 Holtzinger P.
C.
Curtis L. Hoskins, El Paso Electric Company Roy P.
Lessey, Jr., Esq., Akin, Gump, Strauss, Hauer and Feld Bradley W. Jones, Esq., Akin, Gump, Strauss, Hauer and Feld Ron Stevens, Director, Nuclear Regulatory 5 Industry Affairs
bcc w/enclosures:
J.
S; Sniezek, EDO J.
Lieberman, OE" G., Cook B. Faulkenberry Resident Inspector Office Project Inspector E. Adensam, NRR T. Quay, NRR B. Holian, NRR L. Tran, NRR rf7 HWong CVanDenb r h
<r/I / q9
([ /g/ g LMilier l~ /0/$ ~-
SRichards KPerkins
~< /g%
ii/~/15 R
VEST COPY ES NO VEST COPY ST COPY REQUEST COPY REQUEST, COPY NO ES NO YES
. NO YES NO
&~Xr f~pn ~,. ~/a
- JRoe, NRR ~m BFaulkenberry RHuey
(< lf lqg
<< lylqg lu e
((lq Qy I I REQUES YES NO REQUEST COPY R
ST COPY YES NO S