Revised Monthly Operating Rept for Aug 1993 for Palo Verde Nuclear Generating Station Unit 2
ML17310A699
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/31/1993
From: Ecklund B
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17310A697 List:
References
NUDOCS 9310190220
Download: ML17310A699 (4)


Text

ENCLOSURE 2 REVISED PAGE FOR THE UNIT 2 AUGUST 1993 MONTHLYOPERATING REPORT 9310190220:,931013 PDR ADOCK 05000528' PDR

0 RC MONTHLYOPERATING R RT REVISED DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE 09/1 0/93 COMPLETED BY B.S.Ecklund OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 2
2. Reporting Period: Au ust 1993
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270 6: Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N/A 9 Power Level to Which Restricted, If Any (Net MWe): None

10. Reasons For Restrictions, If Any: N/A 1 1 . HOQS'>jlf8e ONrOPetratf:::.;:g.'".'jix.;.',i'.:i.:igxoxj%,.,: i i:',ll".".'.;'.:,.p~g 'i'i 5,832 60,936
12. H90f8';88'RGtorw8$ ':::CrjtlcBfi:::..':.;:::i:, ii.i'-;.,.:"ji,:::,:;:,i,':,g$  : mi',-.i;:,'!:'.,'$'i~'-'~g!i'.;ll::':::;: 94.7 1,827.5 41,652.9
13. Reactol': Pe'8erv85hutdawn,!Hot'rf8;":.:'; ij.';,:,:,:.'.-',',":g','"'.:::: ..':.'xwx'-~~~."," 0.0 0.0 0.0 5.7 1,738.5 40,795.1
15. Urllt::,:R8$ &ive;:..:Shot 0.0 0.0 0.0
16. G'rass:Th'eim'al:,::Er'ri""".,"'.6'e'n'crate'd:,"'MitNHj':,-.':::::.:::.:'::. 21,067 6,579,013 150,615,969
17. 0'rais:;:.Etectrjoat.::::E5erg j;::GeneFat'ed.'.::(MNlH);:,:::,:.";::.-,::.'.-;;":,;""::,'::.',",;:,.':,::,:,:.'::,',',"'1.

900 2,277,400 52,443,470 0 2,131,321 49,126,040 P.8 29.8% 66.9%

P.8 29.8% 66 9%

UnlflCapacitj;".Piet'Fir;.:.(Us!rjjj@DC:::,Nit);..':;,:.,:::;::.::,::::;:,::::,:

':."'::,.:'.'44 p.p 29 9% 66.0%

22. VN!:.GYPS'City'!F8&OrS!re".9BR':::Bet)::.:i'::::::::::i":".'""'".i:::::: 0.0% 28.8% 63 5%

p.p 62% 6.4%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e March 20 1993.

80da s. Outa e extensionto re airSG tubes.

25. If Shutdown At End of Report Period, Estimated Date of Start-up: 09/01/93 Forecast Achieved INITIALCRITICALITY 03/86 04/1 8/86 INITIALELECTRICITY 06/86 05/20/86 COMMERCIALOPERATION 11/86 09/1 9/86