Ack Receipt of 930617 Response to NRC Bulletin 93-002.NRC Considers Licensee Response Complete
ML17310A538
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/27/1993
From: Linh Tran
Office of Nuclear Reactor Regulation
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
IEB-93-002, IEB-93-2, TAC-M86595, TAC-M86596, TAC-M86597, NUDOCS 9308170350
Download: ML17310A538 (6)


Text

Docket Nos. 50-528, 50-529, and 50-530 Hr. William F.

Conway Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999

Phoenix, Arizona 85072-3999

Dear Hr. Conway:

July 27, 1993 9308170350 930727 PDR ADQCK 05000528 6

PDR

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNIT NOS.

1, 2, AND 3

RESPONSE

TO NRC BULLETIN 93-02, "DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NOS.

M86595, M86596, AND M86597)

This letter acknowledges receipt of your response dated June 17, 1993, to NRC Bulletin 93-02 (Bulletin).

The Bulletin was issued May 11, 1993, to all nuclear power reactor licensees.

It requested licensees to identify fibrous air filters or other temporary sources of fibrous material installed or stored in the primary containment, take any necessary compensatory

measures, and remove any such material.

Your response stated that no fibrous filter

material, such as described in the Bulletin, was identified as being used or stored in your containment.

Based on that, we consider your actions to be complete.

Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.

Should you have any questions, please contact me at (301) 504-1361 or the lead Project Manager for this issue, John B. Hickman, at (301) 504-3017.

Sincerely, Original signed by:

Linh N. Tran, Project Manager Project Directorate V

Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION:

CDocket Fi.le PDV Reading File EAdensam CTrammell DFoster-Curseen ACRS(10),

P-315 RBarrett NRC 5 Local PDRs JRoe Tguay LTran

OGC, 15B18 JHickman
KPerkins, RV OFFICE PDV LA L'DV PH u PP H

PDV D

NAME DFoster-Curseen LTran C.rammell Tquay N

DATE N 93 l 2193 93 l

193 OFFICIAL RECORD COPY DOCUMENT NAME:PV86595.LTR

~i il

~t p

r,.>

~g8 REGIj, (4

o

~a*++

- 0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 Ouly 27, 1993 Docket Nos. 50-528, 50-529, and 50-530 Mr. William F.

Conway Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999 Phoenix, Arizona 85072-3999

Dear Hr. Conway:

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNIT NOS.

1, 2, AND 3

RESPONSE

TO NRC BULLETIN 93-02, "DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NOS.

M86595, H86596, AND H86597)

This letter acknowledges receipt of your response dated June 17, 1993, to NRC Bulletin 93-02 (Bulletin).

The Bulletin was issued May ll, 1993, to all nuclear power reactor licensees.

It requested licensees to identify fibrous air filters or other temporary sources of fibrous material installed or stored in the primary containment, take any necessary compensatory

measures, and remove any such material.

Your response stated that no fibrous filter

material, such as described in the Bulletin, was identified as being used or stored in your containment.

Based on that, we consider your actions to be complete.

Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.

Should you have any questions, please contact me at (301) 504-1361 or the lead Project Manager for this issue, John B. Hickman, at (301) 504-3017.

Sincerely, cc:

See next page Linh N. Tran, Project Manager Project Directorate V

Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

~i (A,

hC 4

I1

Mr. William F.

Conway Arizona 'Public Service Company Palo Verde CC:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street

Phoenix, Arizona 85007 James A. Beoletto, Esq.

Southern California Edison Company P. 0.

Box 800

Rosemead, California 91770 Senior Resident Inspector Palo Verde Nuclear Generating Station 5951 S. Wintersburg Road Tonopah,, Arizona 85354-7537 Regional Admini'strator, Region V

U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California

'94596 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street

Phoenix, Arizona

,85040 Chairman Maricopa County Board of Supervisors ill South Third Avenue

Phoenix, Arizona 85003 Jack R.
Newman, Esq.

Newman 3 Holtzinger,.P.C.

1615 L Street, N.W., Suite 1000 Washington, D.C.

20036 Mr. Curtis Hoskins Executive Vice President and Chief Operating Officer Palo Verde Services 2025 N. 3rd Street, Suite 220

Phoenix, Arizona 85004 Roy P.

Lessey, Jr.,

Esq.

Bradley W. Jones, Esq.

Akin,, Gump, Strauss, Hauer ahd Feld El Paso Electric Company 1333 New Hampshire Ave., Suite 400 Washington, D.C.

20036 Mr. Thomas R. Bradish, Manager

.Nuclear Regulatory Affairs Arizona Public Service Company P. 0.

Box 52034

Phoenix, Arizona 85072-2034

0 J