Informs That Sample Plan Described in TS 4.7.9.e.1 Will Be Selected for Facilities for Future Snubber Functional Testing,Beginning W/Upcoming Test Period in Unit 1.Sample Plan Described in TS 4.7.9.e.2 Used Previously
ML17310A524
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/22/1993
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
102-02582-WFC-T, 102-2582-WFC-T, NUDOCS 9308130174
Download: ML17310A524 (2)


Text

AC( 'EL%RA'D LPtJL'ULVLK&lLPlb"j."KAJ&Uj.iM> DXDL&iYl.

REGU ORY INFORMATION DISTRIBUTZ SYSTEM (RIDE)

ACCESSION NBR:9308130174 DOC.DATE: 93/07/22 NOTARIZED:

NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION E

CONWAY,W.F.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION FAULKENBERRY,B.

Region 5 (Post 820201)

SUBJECT:

Informs that sample plan described in TS 4.7.9.e.l will be selected for facilities for future snubber functional testing, beginning w/upcoming test period in Unit 1.Sample plan described in TS 4.7.9.e.2 used previously.

'ISTRIBUTION CODE:

IEOZD COPIES RECEIVED:LTR

(

ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

05000528 05000529 05000530 RECIP1ENT ID CODE/NAME PDV PD TRAN,L INTERNAL: ACRS AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPBl NUDOCS-ABSTRACT OGC/HDS1 RES/HFB EXTERNAL: EGSG/BRYCEFJ.H.

NSIC COPIES LTTR ENCL 2

1

, 1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME TRAMMELL,C AEOD/DEIB AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE DIR FI 02 ILE 01 NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pi-31 (EXT. 504-2065) TO EI.IMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 25 ENCL ~5

WILLIAMF. CONWAY EXECUTIVEVICE PRESIDENT NUCLEAR RECKI':- t-HRC REGloH V 093 JUL 3Q go iguana Public Service Company P 0 BOX 53999

~

PHOENIX ARIZONA85072.3999 102-02582-WFC/TR8/SAB July 22, 1993 Mr. Bobby H. Faulkenberry Regional Administrator, Region V U. S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Functional Testing of Snubbers File: 93-005-41 9.05 In accordance with Technical Specification 4.7.9.e, Functional

Tests, the Regional Administrator is to be notified in writing ofthe sample plan selected forsnubber functional testing priorto the commencement of a test period unless the sample plan from the prior test period will be used.

For previous test periods at Units 1, 2, and 3 of the PVNGS, the sample plan described in Technical Specification 4.7.9.e.2 was selected.

For future test periods, beginning with the upcoming test period in Unit 1, the sample plan described in Technical Specification 4.7.9.e.1 will be selected for all three units.

Should you have any questions, please contact Thomas R. Bradish at (602) 393-5421.