SUBJECT:

Summary of 831027 meeting w/util 8

EPMi Inc re alternate safe shutdown plan proposal~per 10CFR50qApp R,'SEP completed w/o need for extensive mods,Util will submit exemption request.

TITLE! SEP Dist (outgoings externa DISTRIBUTION CODE!

SE01S COPIES RECEIVED; LTR ENCL 1, SIZE>>

1)

REGULATORY~ PORNATION DISTRIBUTION BY+M (BIOS)

ACCESSION NBR 831 1 070298 DOC ~ DATE ! 83/ 1 1 /03 NOTARIZED NO DOCKET t

FACIL:50 244'Robert Emmet Ginna Nuclear Planti Unit 1g Rochester G

05000244 AUTH BYNAME AUTHOR AFFILIATION DICKtG ~ F ~

Operating Reactors Branch 5

REC IP ~ NAME RECIPIEN f AFFILIATION Operating Reactors Branch 5

NOTES:NRR/DL/SEP

1cy, 05000244 RECIPIENT IO CODE/NAME DICKING INTERNAL; NRR CWALINA NRR/DE/SGEB NRR/DL/SEPB SL NRR/DSI/AS 8 BIRR/DSI/CSB 5

I./4 B

G Fl E

EXTERNAL'CRS LPOR NTiS NOTES:

COPIES LTTR ENCL 1

1 1

1 1

2 2

1 1

1 1

1 1

6 8

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR/DE/EHEB NRR/DL/SEPB RF NRR/DSI/AE8 NRR/DSI/CPB NRR/DS I/ICSB NRR/DS I/RSB RGN1 DSU USE EX(2/g)

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 f,

1 1

22 22

  • 1 1

TOTAL NUMBER OF COPIES REUUIREDG LTTR 50 ENCL.

50

ki J NN C)

~

N 1N1 l N

1'k I

I '1 N14 1

srW il t'c l 1 I il >N1fr 1 r

r.N N

NNN f

, << r )

1 off

~

N N

1'I Nk 1 tll

.1 I 1t W 4>>

c k ~

rcN ~ Jf Ii t.[L

~ )1

"'i k'r rNI ~'Ng,) J 4

r "N 9 ('r tN1 '1 r Nik4 CNN--1 r f c) t II i tt

'I'1 I'f NJ g1" 11N" 1>>t fr ]kc

[1 1 ) c1c> fi h,.y 8 l p c L N f NtrN,'4 )(NO g

NNIir 1

p.,N1)N 1 [Nr ','

NN1 N

ryy gCNNNNN 4 NNcy

'1lk IU r

~

1 N

QN NN

~

r

<<%%I ~ ~

~ 4~ Fkc Iis~

) IVf $ )1riW 4

rJ NN].)

r,gtW

) 1i c1 II 4411 rex'N Nt NN

$N,'l Nr N

N kr Q ril

~ NI' I

NN I N". 1I 8 aT I

<<N

<t 1.4 cgi'W lg

>> "N I <<-,

NNNNcr W

I I r NN l

c iir.

N

(

NN'kc)g 1

I,N 4

il JNINrrc I

1 N

gp,R REJIG O

I~

++*++

Docket No. 50-244 LS05-83-11-013 UNITE0 STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 November 3, 1983 LICENSEE:

ROCHESTER GAS AND ELECTRIC CORPORATION FACILITY:

R. E. Ginna Nuclear Power Plant

SUBJECT:

MEETING

SUMMARY

, RG&E COMPLIANCE WITH 10 CFR PART 50, APPENDIX R

The purpose of the meeting was for Rochester Gas

& Electric Corporation (RG&E) to present their proposal for an alternate safe shutdown plan.

The list of attendees (Enclosure

1) and a copy of the RG&E handouts (Enclosure
2) are enclosed.

RG&E presented a review of the modifications originally proposed for compliance with 10 CFR Part 50, Appendix R.

Initially the proposed modifications (which included a centralized remote operating panel, new switchgear, motor control centers etc.) for compliance with Appendix R were also expected to fulfillcertain SEP requirements.

However, SEP was completed without the need for the extensive modi-fication.

Consequently, RG&E concluded that equivalent fire protection and regulatory compliance could be provided by simpler, less expensive modi ficati ons.

The proposed alternative shutdown system approach would include items such as distributed control of shutdown functions, protection of existing

cable, and previously approved shutdown methods.

Some exemptions would also be required.

The licensee indicated that they are ready to begin the detailed design.

A schedule will be developed along with the design.

The staff noted that approval was given for implementation of an alternative safe shutdown plan in April, 1983.

In June, 1983 RG&E informally notified the staff that, after an indepth review, they wanted to propose an al-ternative plan.

Prior to that, RG&E had indicated that they would be requesting a schedular exemption.

At this time, however, there is no

J i formal documentation regarding the schedule or alternatives in the docket.

The staff recommended that a request for a schedular exemption and a

Justification for Continued Operations be submitted soon.

RGSE indicated that such an exemption request would be submitted.

They also, indicated the alternative proposal would be submitted in November, 1983.

George

. Dick, Jr.,

P ject Manager Operating Reactors Br nch g5 Division of Licensing

Enclosures:

l.

Attendance list 2.

RGSE handouts cc:

See next page

Hr. John E. Maier CC Harry H. Yoigt, Esquire

LeBoeuf, Lamb, Leiby and MacRae 1333 New Hampshire
Avenue, N.

M.

Suite 1100 Washington, D. C.

20036 Mr; Michael Slade 12 Trailwood Circle Rochester, New York 14618 Ezra Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector R. E. Ginna Plant c/o U. S.

NRC 1503 Lake Road

Ontario, New York 14519 Stanley B. Klimberg, Esquire General Counsel New York State Energy Office Agency Building 2 Empire State Plaza
Albany, New York 12223 Dr. Emmeth A. Luebke Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Mashington, D. C.

20555 Dr. Richard F. Cole Atomic Safety and Licensing Board U. S. Nuclear Regulatory Comnission Washington, D. C.

20555 Dr. Thomas E. Nurley, Regional Administrator Nuclear Regulatory Comnission, Region I 631 Park Avenue

'ing of Prussia, Pennsylvania 19406 U. S. Environmental Protection Agency Region II Office ATTN:

Regional Radiation Representative 26 Federal Plaza New York, New York 10007 Herbert Grossman, Esq.,

Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Mashington, D. C.

20555 Supervisor of the Town of Ontario 107 Ridge Road Mest

Ontario, New York 14519 Jay Dunkleberger New York State Energy Office Agency Building 2 Empire State Plaza
Albany, New York 12223

ENCLOSURE 1

OCTOBER 27 1983 MEETING GINNA, APPENDIX R

ATTENDANCE LIST Name Paul Wilkens Bob Mecredy Karl Drehobl Stephen Maloney Ross Howe Dennis Crutchfield Dennis Kubicki Nick Fioravante Tom Hambach George Dick Or anization RGRE RGRE EPM, Inc.

EPM, Inc.

EPM, Inc.

NRC NRC NRC NRC NRC

Enclosure 2

APPENDI Y R COMPLIAI'CE MEETING AGENDA 10/27/83 ORIGINAL DEDICATED SHUTDOWN SYSTEM 20 MIN ~

SCOPE COST SCHEDULE CONCLUSIONS REVISED ALTERNATIVE SHUTDO'HN SYSTEM 60 llIN.

. SAFE SHUTDOWN BASES CONCEPTUAL DESIGN MODIFICATIONS ASSOCIATED CIRCUITS EXEMPT!ONS ADVANTAGES NEAR TERM ACTIONS 10 MIN.

RGRE SUBMITTAL NRC REVIEl'J

ORIGINAL DEDICATED SHUTDOLJN SYSTEM SCOPE PROVIDE "NORMAL" SHUTDOWN CAPABILITY AT INDEPENDENT LOCATION, INTEGRATE WITH SEP CENTRALIZED REl'LOTE OPERATING STATION LOCATED IN THE TECHNI CAL SUPPORT CENTER ADDITIONAL SAFETY RELATED 080 V SHITCHGEAR.

MOTOR CONTROL CENTERS AND FEEDERS (NE>l CI ASS 1 BUILDING)

REMOTE ISOLATION AND TRANSFER SCHEMES FROM CENTRAL PANEL NEH CABLE ROUTED TO AVOID CRIT! CAL FIRE AREAS ERECTION OF FIRE BARRIERS

'EW, INDEPENDENT. INSTRUMENT LOOPS AND TRANSMITTERS

ORIGINAL DEDICATED SHUTDOWN SYSTEM

~HEDULE ENTIRE SYSTEM MUST BE COt'lPLETE BEFORE PUT IN SERVICE.

EXTENDED CONSTRUCTIOtl, STARTUP TESTItlG CON CLUS I Of'l COST IS HIGH FOR ADDITIONAL PROTECTION SEP CONCLUDED WITHOUT NEED FOR DSS IMPACT ON EXISTING SAFEGUARDS EQUIPf'lENT AND PLANT OPERATION IS GREAT EQUIVALENT FIRE PROTECTION AND REGljLATORY COMPLIANCE CAN BE PROVIDED BY SIMPLER, LESS EN'ENSIVE MODIFICATIONS

PROPOSED ALTERNATIVE SHUTDOWN SYSTEM SAFE SHUTDOWN BASES REACTIVITY CONTROL REACTOR TRIP BORON INJECTION BY PRIMARY tlAKEUP SOURCE PRIt'lARY MAKEUP CONTROL MAINTAIN ADEQUATE INVENTORY BY CHARGING PUMP OR SI PUMP PRIMARY PRESSURE CONTROL tlAINTAIN WITHIN ACCEPTABLE LIt'IITS BY CONTROLLING MAKEUP A ND USING PRESSURE CONTROL VALVES DECAY HEAT REMOVAL HOT SHUTDOWN AND COOLDOWN PROVIDED BY STEAM GENERATOR RELIEF - AUXILIARY FEEDWATER FROM TAFP OR STANDBY AFP COLD SHUTDOWN ACHIEVED BY RHR OR WATER SOLID SG PROCESS MONITORING - PROVIDE SUFFICIENT INFORMATION TO ASSURE SAFE SHUTDOWN PRIMARY SYSTEt'l TEMPERATURE, PRESSURE,.

l EVEL SECONDARY SYSTEM TEMPERATURE, PRESSURE SOURCE RANGE NUCLEAR INSTRUt'jENTATION VARIOUS SYSTEM FLOWS OR PRESSURES TANK LEVELS SUPPORT SERVICES COtlPONENT COOLING WATER SERVICE WATER El"lERGENCY POWER SYSTEtlS

PROPOSED ALTERNATIVE SHUTDOl'JN SYSTEM C PTUAL DESIGN DISTRIBUTED CONTROL OF SHUTDOWN FUNCTIONS SHUTDOWN ACTIVITIES CHART TO DEFINE ACCEPTABLE MANUAL OPERATIONS LIMITED NUMBER OF TRANSFER SWITCHES AND ISOLATION DEVICES AT LOCAL AREAS PROTECT POWER FEEDS TO flINIt'lUM SET OF SAFE SHUTDOWN COMPONENTS PROTECT EXISTING NECESSARY INSTRUMENTATION WITH LIMITED CABLE REROUTING PROVIDE ADDITIONAL FIRE BARRIER FIRE DETECTION AND FIRE SUPPRESSION UPGRADES WHERE NECESSARY UTILIZE PREVIOUSLY APPROVED SHUTDO'HN METHODS REQUEST E XEflPTIONS WHERE JUSTIF IED

DISTRIBUTED CONTROL OF SHUTDOWN FUNCTIONS PRIMARY SHUTDOWN STATI OflS CONTROL ROOM TURBINE DRIVEN AFN PUMP OR STANDBY AFbf PUMP CHARGING PUMP SECONDARY SHUTDOWN STATIONS DIESEL GENERATORS AUXILIARY BUILD I HG I NSTRUMENT PANEL INTERMEDIATE BU!LDING IHSTRUf1ENT PANEL VARIOUS VALVE LOCATIONS Rl<ST AND CONDENSATE TANKS VARI OUS LOCAL I HDI CATORS MODIFY BUS 10 FOR LOCAL CONTROL OF CHARGING fhANNIHG OF SHUTDOLfH STATIONS DEPENDENT UPON FIRE SCEf'lARIO

SHUTDOWN ACTIVITIES CHART TO DEFINE ACCEPTABLE NANUAL OPERATIONS IDENTIFY ACTIONS REQUIRED TO ACHIEVE SHUTDO>fN IDENTIFY TINE PERIOD FOR REQUIRED ACTIONS

.ALLOCATE AVAILABLE OPERATIONS STAFF

LINITED Nllt1HER OF LOCAL TRANSFER SWITCHES AND ISOLATION DEVICES TRANSFER CONTROL OF CHARGING FROH CONTROL ROON TO LOCAL STATION.

TRANSFER CONTROL OF TURBINE DRIVEN AFM PUt".P TO LOCAL STATION TRANSFER EXISTIHG PRIf1ARY AND SECONDARY SYSTEH INSTRUNENTA-TION TO LOCAL PANELS TRANSFER OCCURS ONlY i<HEN NECESSARY TO HAINTAIN PLANT IN SAFE CONDITION

PROTECT POWER FEEDS TO NININUM SET OF SAFE SHUTDOWN CONPONENTS PROTECT EDG POWER TO BUS 14 INSTALL BARRIERS IN EDG VAULT

!NSTALL BARRIERS IN BATTERY ROON B

PROTECT POWER FEED IN AUXILIARYBUILDING PROTECT CHARGING PUHP FEED FRON BUS 14 PROTECT EDG lA DC DISTRIBUTION FEED IN BATTERY ROON B'ROTECT AUXILIARYBUILDING DC DISTRIBUTION PANEL lA FEED IN BATTERY ROOt1 B AND 'AUXILIARY BUILDING OTHER EQUIPtKNT HAS EXISTING SEPARATION OR CAN BE REPAIRFD FOR COLD SHUTDOWN

PROTECT EXISTING NECESSARY CIRCUITS WITH LIMITED CABLE REROUTING PROTECT 8

STEAN GENERATOR PRESSURE IN INTERMEDIATE BUILDING PROTECT PRIt1ARY TEMPERATURE INDICATION IN INTERMEDIATE BUILDING PROTECT CHARGING CONTROL IN AUXILIARY BUILDING BASEHENT AND MEZZANINE PROVIDE LOCAL START/STOP CONTROL FOR CHARGING. TAFP AND DIESELS PROVIDE INDICATIONS AT TAFP STATION PRIMARY TEMPERATURE TAFH FLOW SG LEVEL AND PRESSURE PROVIDE INDICATION AT CHARGING STATION PRIMARY PRESSURE PRESSURIZER LEVEL PROVIDE SOURCE RANGE DRAklER FOR REPAIR

PROVIDE ADDITIONAL FIRE BARRIERS, FIRE DETECTION AND FIRE SUPPRESSION UPGRADES I<HERE NECESSARY UP GRADE EDG VAULT TRAI N BARR I ER SEAL PENETRATIONS IN AUXILIARYBUILDING OPERATING FLOOR AND CHARGING PUMP ROON PROVIDE CLOSE-SPACED SPRINKLERS AT STAIRWELLS AND ACCESS HATCH ON OPERATING FLOOR OF AUXILIARYBUILDING INSTALL RADIANT ENERGY SHIELDS IN CONTAINMENT FOR APPLICABLE CONTROL AND INSTRUNENT CIRCUITS

RESOLUTION OF ASSOCIATED CIRCUITS COMMON POWER SUPPLY COORDINATED BREAKERS FUSE CONTROL PROGRAM OPERATOR ACTION TO TRIP NONESSENTIAL LOADS

'I SPUR I AUS--OP ERAT I-ON REVIEWED POTENTIAL DETRIMENTAL ACTIONS POTENTIAL PROBLEMS RESOLVED BY PREVENTATIVE ACTION OR CORRECTIVE ACTION FOR EXAMPLE:

LOCK OUT BREAKERS FOR RHR ALIGNMENT OF REQUIRED SYSTEMS VERIFIED FOR OPERATION ISOLATE LETDOWN BY OPENING DC BREAKER OR ISOLATE INSTRUMENT AIR COMMON ENCLOSURE SEPARATION ISOLATION

UTILIZE PREVIOUSLY APPROVED SHUTDOMN METHODS YARD LOOP FIRE HATER COOLING TO EDG YARD LOOP FIRE HATER SUPPLY TO AUXILIARY FEEDlrlATER HATER SOLID STEAM GENERATOR COOLDOMN

REQUEST E XEt1PTIONS MHERE JUSTIFIED TEH OR LESS EXEMPTIONS TO BE REQUESTED RHST FLOOR GAP RATTLE SPACE FULL AREA SUPPRESSION SEVEN AREAS IMPACTED PARTIAL SUPPRESSION PROVIDED BASED ON FIRE HAZARD ANALYSIS AUTOt1ATIC DETECTION ALARt1S IN CONTROL ROOM

ADVANTAGES AF ALTERNATIVE SHUTDOMN LESS EXPENSIVE LESS IMPACT ON PLANT NO HAJOR CHANGES TO SAFEGUARDS E~UIPthENT EASIER TO INSTALL, TEST, TURNOVER FEMER OPERATIONS CHANGES NO NEW SIGNIFICANT TRAINING

FASTER, PHASED INPLENENTATION

NEAR TERN A CT I ONS RGKE SUBflITTAL, NOYEHBER 8'5 NRC REVIEH REPLACE DSS WITH ALTERNATIVE SHUTDOWN