Forwards SER for SEP Topic IV-2, Reactivity Control Sys Including Functional Design & Protection Against Single Failures. Response Requested within 30 Days
ML17309A138
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/24/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Maier T
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17258A909 List:
References
TASK-04-02, TASK-15-08, TASK-15-10, TASK-15-8, TASK-4-2, TASK-RR LSO5-81-03-050, LSO5-81-3-50, NUDOCS 8103260611
Download: ML17309A138 (5)


Text

.Docket No. 50-244 LS05-81-03-050 Mr. John E. Maier Vice President Electric and Steam Production Rochester Gas 8 Electric Corporation 89 East Avenue Rochester, New York 14649

Dear Mr. Maier:

RE:

SEP TOPIC IV-2, REACTIVITY CONTROL SYSTEMS - R.E.

GINNA NUCLEAR POWER PLANT I~

Enclosed is a copy of our evaluation of SEP Topic IV-2, Reactivity Control Systems for R.E. Ginna Nuclear Power Plant.

This assessment compares your facility, as described in Docket No. 50-244, with the criteria currently used by the regulatory staff for licensing new

, facilities.

Please inform us if your as-built facility differs from the licensing basis assumed in our assessment.

Your response within 30 days of the date you receive this letter is requested.

If no response is received within that time, we will assume that you have no comments or corrections.

This evaluation will be a basic input to the integrated safety assessment for your facility unless you identify changes needed to reflect the as-built conditions at your facility.

This assessment may be revised in the future ifyour facility design is changed or if NRC criteria relating to this subject are modified before the integrated assessment is completed.

In future correspondence regarding this topic, please refer to the topic number in your cover letter.

Sincerely,

BX93260(,((

Enclosure:

Draft SEP Topic IV-2 cc w enclosure:

Dennis M. Crutchfield, Chief Operating Reactors Branch 85 Division of Licensing

  • SEE PREVIOUS CONCURRENCES OFFICEP SURNAME)

OATE)

See nex page SEPB:DL SL/SEPB:DL 3/17/81 3/18/81 RScholl:dn*

RHermann*

C/SEPB:DL WRussell*

3/18/81 RSnaider 3//9'/81 DCrutch ld 3/go/81 AS:DL C/0

DL NRC FORM 3'IB IIO/80)NRCM 0240 OFFICIAL RECORD COPY
  • USGPO: 1980 329.824

4

/ 'I 6

C'+~

% 4E uX akX i

ll fl k'

'I ~~-

ce

    >IPj's'I., OFFICEI SURNAME) 0ATE f> ee nex page E oil:dn 3/g/81 SL/SEPB: DL RH nn 3/g /81 CJ) h.OL WRAssel 1 3/4%/81 ~ +l'o ~ ~ ~ ~ ~ ~ ~ ORBA'5:DL -SNOWl ek 3/ /'81 C(ORBS'5:DL DCrutchfield 3/ /81 NRC FORM 318 IIO/80) NRCM 6240 OFFICIAL RECORD COPY + U Fp-1)99 329.824 ~0 ~ g I A r Cp,8 Af:00 . pO Cy 0O h +w*w+ Docket No. 50-244 LS05-81-03-050 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 24, 1981 Mr. John E. Maier Vice President Electric and Steam Production Rochester Gas 8 Electric Corporation 89 East Avenue Rochester, New York 14649

    Dear Mr. Maier:

    RE:

    SEP TOPIC IV-2, REACTIVITY CONTROL SYSTEMS - R.E.

    GINNA NUCLEAR POWER PLANT Enclosed is a copy of our evaluation of SEP Topic IV-2, Reactivity Control Systems for R.E.

    Ginna Nuclear Power Plant.

    This assessment compares your facility, as described in Docket No. 50-244, with the criteria currently used by the regulatory staff for licensing new facilities.

    Please inform us if your as-built facility differs from the licensing basis assumed in our assessment.

    Your response within 30 days of the date you receive this letter is requested.

    If no response is received within that time, we will assume that you have no comments or corrections.

    This evaluation will be a

    basic input to the integrated safety assessment for your facility unless you identify changes needed to reflect the as-built conditions at your facility.

    This assessment may be revised in the future if your facility design is changed or if NRC criteria relating to this subject are modified before the integrated assessment is completed.

    In future correspondence regarding this topic, please refer to the topic number in your cover letter.

    Sincerely, Dennis M. Crutchfield, Chi Operating Reactors Branch 4'5 Division of Licensing

    Enclosure:

    Draft SEP Topic IV-2 cc w/enclosure:

    See next page