Forwards Insp Repts 50-335/86-23 & 50-389/86-22 on 861014- 1110.No Violations or Deviations Noted
ML17308A275
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/28/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17308A276 List:
References
NUDOCS 8612090613
Download: ML17308A275 (2)


See also: IR 05000335/1986023

Text

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power

and Light Company

ATTN:

Nr.

C.

O.

Woody

Group Vice President

Nuclear Energy Department

P.

O.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-335/86-23

AND 50-389/86-22

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

R.

V. Crlenjak

on

October

14

November

10,

1986.

The

inspection

included

a

review of activities authorized for your St.

Lucie facility.

At the conclusion

of the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

Your attention is invited to unresolved

item identified in the inspection report.

This matter will be pursued during future inspection.

In

accordance

with Section

2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

OR~GlNAL g(.-N<O ny

Ahgl~

h$

5/t->~".l l l

David N. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

(See

page

2)

8612090613

861128

PDR

ADOCK 05000335

G

PDR

Florida Power

and Light Company

NOV 2 8

1986

Enclosure:

NRC Inspection

Report

cc w/encl:

N.

N. Harris, Vice President

St.

Lucie Nuclear Plant

P.

A-. Sager,

Plant Manager

. B. Harper, Site

QA Superintendent

b c w/encl:

RC Resident

Inspector

Document Control

Desk

State of Florida

I

I

hr

tensen:bhg

lro

11/g/86

11@/86