ML17308A246

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/86-09 & 50-389/86-08 on 860414-18 & Notice of Violation.First Violation Involves Failure to Prepare Boxes of Radioactive Matls Offered for Transport So That Radiation Does Not Exceed 200 M/H
ML17308A246
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/30/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17308A247 List:
References
NUDOCS 8607290009
Download: ML17308A246 (6)


See also: IR 05000335/1986009

Text

Docket Nos.

50-335

and 50-389

License

Nos.

DPR-67

and

NPF-16

EA 86-95

Florid+Power

and Light Company

ATTN:V Hr.

C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NOS.

50-,335/86-09

AND 50-389/86-08)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

on

April 14-18,

1986, at your St.

Lucie facility.

As

a result of this inspection,

significant failures to comply with NRC requirements

were identified.

An

Enforcement

Conference

to discuss

these matters

was held at Juno

Beach,

Florida,

on May 9,

1986.

The first violation described

in the enclosed

Notice of Violation involves

a

failure to prepare

two boxes of radioactive materials offered for transport

so

that under conditions normally incident to transport

the radiation level

does

not exceed

200 milli rem per hour at any point on the external

surface of the

package.

The remaining

two violations described

in the enclosed

Notice involve

a failure to package

a shipment of low specific activity material

in

a

DOT

Specification

7A Type

A package

or

a strong, tight package

and

a failure to

maintain written procedures

regarding respiratory protective

equipment

issuance

records.

In accordance

with the "General

Statement

of Policy and Procedure

for NRC

Enforcement Actions,"

10 CFR Part 2, Appendix

C ( 1986),

the first violation

described

in the enclosed

Notice has

been classified

as

a Severity

Level III

violation.

Normally,

a civil penalty is considered

for a Severity

Level III

violation.

However, after consultation with the Director, Office of Inspection

and Enforcement,

I have decided that

a civil penalty will not be proposed

in

this .case

due to your prior good performance

in this area.

The remaining

two

violations have

been categorized

as Severity Level

IV violations.

You are required to respond

to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your response,

you should document

the specific actions

taken

and any additional actions

you

plan to prevent recurrence.

After reviewing your response

to the Notice,

including your proposed corrective actions,

the

NRC will determine

whether

8b07290009

8bOb30

PDR

  • DOCK 05000335

G

PDR

0

Florida Power

and Light Company

JUMBO @86

further

NRC enforcement

action is necessary

to ensure

compliance with NRC

regulatory requirements.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal'egulations,

a copy of this letter

and its enclosures

will be placed in the

NRC's Public Document

Room.

The responses

directed

by this letter and the enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget issued

under

the

Paperwork Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Original signed

by Roger

D. Walker

J.

Nel son Grace

Regional Administrator

Enclosures:

1.

Notice of Violation

2.

Inspection

Report Nos.

50-335/86-09

and 50-389/86-08

cc w/encls:

K.

N. Harris, Vice President

/

St.

Lucie Nuclear Plant

D. A. Sager,

Plant Manager

gN.

Weeme,

Site gA Superintendent

rlorida Power and Light Company

JUN BO >986

Dis tribution

JgECy

/JMTaylor, IE

JAxelrad,

IE

Flack,

IE

JLieberman,

ELD

Enforcement

Coorcgnatoys

4 RI, RII,AIII,PRIV,WV

IE: ES

IE: EA

CS

RC I.Rgsx'dept, Xjspec tor

/EToukigny.. ERR,

l

~

~

I

6

f

)

~,

IE: ES

EFlack

6/ig/86

RII

JPStohr

6/

/86

JLieberman

6/~/86

6/g/86

J

r c

6//86

n sns

6/)$/86

J

elrad

RV

/86

6

6/70/86

)pp

I

lmer

J

or

86

6

86

0