ML17308A225

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/86-12 & 50-389/86-11 on 860423-25.No Violations Noted.Licensee Should Direct Attention to Resolution of Exercise Weakness Identified in Paragraph 6 of Encl Rept
ML17308A225
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/02/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17308A226 List:
References
RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8606100153
Download: ML17308A225 (2)


See also: IR 05000335/1986012

Text

JUN O~

~98S

Docket Nos. 50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida~ower

and Light Company

ATTN:, VMr. C.

O.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

INSPECTION

REPORT

NOS. 50-335/86-12

AND 50-389/86-11

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

W. Sartor

on April 23-25,

1986.

The inspection

included

a review of activities

authorized for your St.

Lucie facility.

At the conclusion of the inspection,

the

findings

were

discussed

with those

members

of your staff identified

in

the

enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

.and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

Your attention

is dir ected

towards

the

resolution

of the

exercise

weakness

defined in paragraph

6 of the enclosed

report.

In

accordance

with Section

2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed

in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor

Projects

Enclosure:

(See

page

2)

8606100i53

860602

PDR

ADOCK 05000335

PDR

Florida Power

and Light Company

Enclosure:

Inspection

Report

w/encl:

K. N. Harris, Vice President

St.

Lucie Nuclear Plant

. A. Sager,

Plant Manager

N.

Weems,

Site

QA Superintendent

c w/encl:

RRC Resident

Inspector

<Document Control

Desk

JState

of Florida

~

~

~

B. Matthews,

EPLB/IE HQS

EP Section File

OMCollins

SAElrod

5/Zgl86

5/3 p/86