Notice of Violation from Insp on 860311-0414
ML17308A220
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/29/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17308A219 List:
References
50-335-86-07, 50-335-86-7, 50-389-86-06, 50-389-86-6, NUDOCS 8605150481
Download: ML17308A220 (4)


Text

ENCLOSURE 1

NOTICE OF VIOLATION Florida Power and Light Company St.

Lucie 1 and 2

Oocket Nos.

50-335 and 50-389 License Nos.

OPR-67 and NPF-16 The following violation was identified during an inspection conducted on March 11 April 14, 1986.

The Severity Level was assigned in accordance with the NRC Enforcement Policy ( 10 CFR Part 2, Appendix C).

Units 1 and

". Technical Specificati'on (TS) 6.8. 1.c requires that procedures be implemented for surveillance and test activities of safety-related equipment.

Contrary to the above, Administrative Operati.ng Procedures 1 and 2-0010125, Schedule of Periodic

Tests, Checks and Calibrations and
0010127, Reactor Engineering Schedule of Periodic Tests and
Reports, were not adequately implemented in that the following surveillance tests were not perforrr.~d within the specified time intervals.

a.

On September 29,

1985, the 25 percent time extension was exceeded for the quarterly main steam isolation valve (MSIV) part-stroke survei 1-lance test required by Unit 1

TS 4.7. 1.5.

b.

On January 10,

1986, the 25 percent time extension was exceeded for the automatic actuation logic monthly surveillance test, required by Unit 2 TS Table 4.3-2, for the auxiliary feedwater actuation system (AFAS).

c.

On February 7,

1986, the 25 percent time extension was exceeded for the monthly setpoint calculation and adjustment of the fixed incore alarm system required by Unit 2 TS 4.2. 1.4.

d.

On February 13,

1986, the 25 percent time extension was exceeded for the semi-annual engineered safety features actuation system (ESFAS) relay surveillance test required by Unit 2 TS Table 4.3-2.

This is a Sevqrity -Level IV violation (Supplement I) and is applicable to both units.

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the'esults achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

8605l50481 860429 PDR ADOCK 05000335" 9

~ PDR

Florida Power and Light Company St.

Lucie 1 and 2

Docket Nos.

50-335 and 50-389 License Nos.

DPR-67 and NPF-16 Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

Date:

@PRE g @~