April 22, f993 Docket Nos.
50-528, 50-529 and 50-530 Hr. William F.
Conway Executive Vice President, Nuclear Arizona Public Service Company P.O.
Box 53999
- Phoenix, Arizona 85072-3999
Dear Mr. Conway:
SUBJECT:
HUMAN PERFORMANCE STUDY REPORT PALO VERDE UNIT 3 As you are aware, the NRC staff'nd a contractor from Idaho National Engineering Laboratory conducted an onsite analysis of the Palo Verde Unit 3 Loss of Main Feedwater Pump with Reactor Trip and Safety Injection that occurred on February 4, 1993.
Enclosed for your information is the report on the results of this study.
Sincerely,
Enclosure:
Human Performance Study Report cc w/enclosure:
See next page Original signed by Charles H. Trammell, Senior Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation DISTRIBUTION:
Docket File PDV Reading File HVirgilio DFoster CTrammell ACRS(10),
P315 NRC 5 Local PDRs JRoe TQuay LTran
- OGC, 15B18
- KPerkins, RV
. 6 en~,AE03 OFC LA PD PH PDV D PDV NAME DATE DFoste 93 LTran:lh g
93 f V ammell TQuay 93 OFFICIAL RECORD COPY DOCUMENT NAME:PVHPSR.LTR 9304270307 930422 PDR ADOCK 05000528 P
E
+
~
~
t1
> gQ~'41'-"i
<~q 4Eg>
PC
.W p.
~t j
+
O~
O
+y
~0
+**4 +
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 22, 1993 Docket Nos. 50-528, 50-529 and 50-530 Mr. Milliam F.
Conway Executive Vice President, Nuclear Arizona Public Service Company P.O.
Box 53999
- Phoenix, Arizona 85072-3999
Dear Hr. Conway:
SUBJECT:
HUHAN PERFORMANCE STUDY REPORT PALO VERDE UNIT 3 As you are
- aware, the NRC staff and a contractor from Idaho National Engineering Laboratory conducted an onsite analysis of the Palo Verde Unit 3 Loss of Hain Feedwater Pump with Reactor Trip and Safety Injection that occurred on February 4, 1993.
Enclosed for your information is the report on the results of this study.
Sincerely,
Enclosure:
Human Performance Study Report cc w/enclosure:
See next page Charles M. Trammell, Senior Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
l 1t ~
ll
)
h t
),
l l
I
Hr. Milliam F.
Conway Arizona Public Service Company Palo Verde CC:
Hr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street
- Phoenix, Arizona 85007 James A. Beoletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission HC-03 Box 293-NR Buckeye, Arizona 85326 Regional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Haria Lane Suite 210 Walnut Creek, California 94596 Hr. Charles B. Brinkman, Hanager Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Haryland 20852 Hr. William A. Wright, Acting Director Arizona Radiation Regulatory Agency 4814 South 40 Street
- Phoenix, Arizona 85040 Chairman Haricopa County Board of Supervisors 111 South Third Avenue
- Phoenix, Arizona 85003 Jack R.
- Newman, Esq.
Newman
& Holtzinger, P.C.
1615 L Street, N.M., Suite 1000 Mashington, D.C.
20036 Hr. Curtis Hoskins Executive Vice President and Chief Operating Officer Palo Verde Services 2025 N. 3rd Street, Suite 220
- Phoenix, Arizona 85004 Roy P.
Lessey, Jr.,
Esq.
Bradley W. Jones, Esq.
Akin, Gump, Strauss, Hauer and Feld El Paso Electric Company 1333 New Hampshire Ave., Suite 400 Washington, D.C.
20036
\\
I I
4 l