ACCELERA.TED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDE)
F(
ACCESSION NBR:9211120129 DOC.DATE: 92/10/23 NOTARIZED: NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION SAPORITO,T.J.
AffiliationNot Assigned RECIP.NAME RECIPIENT AFFILIATION TAYLOR,J.
Ofc of the Executive Director for Operations DOCKET ¹ 05000528 05000529 05000530
SUBJECT:
Requests that NRC institue show cause proceeding to modify, suspend or revoke licensee. licenses NPF-41,51 a
74 6 that NRC order immediate shut down of three nuclear reactor cores, in ref to licensee 901113 amends to TS request.
S DISTRIBUTION CODE:
YE03D COPIES RECEIVED:LTR
[
ENCL 0 SIZE:
TITLE: Request for NRR Action (e.g.
2.206 Petitions) 6 Related Cor espondenc/
NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
05000528A 05000529 05000530p RECIPIENT ID CODE/NAME PD5 LA TRAMMELLFC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD5 PD COPIES LTTR ENCL INTERNAL: EDO/ACB 0
D EG FILE EXTERNAL: NRC PDR 01 NRR DIR OGC/ROED NOTE TO ALL "RIDS RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TPTBL NUMBER PF COPIES REQUIRED:
LTTR 9
ENCL
drt I~a.
~~(</P~
THOMAS J. SAPORITO, JR.
13517 West Glendale, No. 2031
- Glendale, Arizona 85307 602/935-1276 October 23, 1992 Mr. James Taylor Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re:
Arizona Public Service Com an, Palo Verde Nuclear Generating Station NRC Permissive Ucense Nos. NPF-41, 51 and 74
Dear Mr. Taylor:
COMES
- NOW, Thomas J.
- Saporito, Jr.,
hereinafter
("Petitioner" )
and hereby submits his request pursuant to 10 C.F.R. 5 2.206 for specific action by the U.S.
Nuclear Regulatory Commission (NRC) within a reasonable time, directed towards the
. Arizona Public Service Company (Licensee) regarding operations at the Palo Verde Nuclear Generating Station (PV).
1.
Petitioner respectfully requests that the NRC institute a show cause proceeding to modify, suspend, or revoke the Licensee's operational license numbers NPF-41, 51 and 74 for operation of the Palo Verde Nuclear Generating Station consisting of 3 individual reactor cores respectively at Units 1, 2 and 3.'.
Petitioner respectfully requests that the NRC order the immediate shut down of all 3 nuclear reactor cores at the Palo Verde Nuclear, Generating Station until such time as a nuclear safety evaluation can'(b'e performed on approximat'ely 72 safety valves currently installed at the Palo Verde nuclear ptation.
(
I Basis and Justification:
On November 13,
- 1990, APS Executive Vice President for Nuclear Operations, Mr. W.F. Conway, requested by letter to the NRC an Amendment to the Palo Verde Units 1,2 and 3 Technical Specifications Sections 3/4.3.1, 3/4.4.2, 3/4.7.1, and 3/4.7.1.2.
Mr. Conway further stated in his letter that the proposed changes would increase the allowable setpoint tolerances for the Main Steam Safety Valves (MSSVs) and Pressurizer Safety Valves (PSVs), reduce the minimum required auxiliary feedwater (AFW) flow, and reduce the high pressurizer pressure trip (HPPT) response time.
Mr. 6onway stated under oath that: "I, W.F. Conway, represent that I am Executive Vice President Nuclear, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and be'e haxtatements made therein are true and correct."
UUb 92iii20129 921023 PDR ADOCK 05000528 P
PDR A9 008236 gg. 0'7o'Pz 0
Q Alr. James Taylor October 23, 1992 Page No. 2 Mr. Conway is not technically qualified to make affirmatory commitments and nuclear safety system analysis required In this or any License Amendment request relevant to the Palo Verde nuclear station.
I note here for the record that Mr, Conway's formal education consists of a hi h school di lorna.
Mr. Conway does not hold any B.S. Degrees in any Engineering Discipline nor does he hold any B.S. Degrees In Business Administration.
Additionally, 56 Personnel In Engineering Positions at the Palo Verde nuclear station hold those positions without a B.S. Degree in Engineering.
On March 22,
- 1991, an APS memo from Mr. R.A. Bernier to Mr. W.J.
Rudolph was initiated concerning an Amendment Request to Change Safety Valve Setpoint Tolerances at the Palo Verde nuclear station.
Bernier's memo makes reference
'! to Mr. G.S. Green who stated a concern to Rudolph In a March 6, 1991, memo that the amendment request indicates a peak pressure 2740.9 PSIA, and that the safety limit Is 2750 PSIA, leaving a 9.1 PSIA margin.
The implication is that Mr. Green believes that 9.1 PSIA is not sufficient margin Licensing assumes that Mr. Green is referring to the Loss of Condenser Vacuum (LOCV) event for his discussion.
George Green can be reached by telephone at notice that the Licensees
- herein, Arizona Public Service
- Company, et al. requested
~
amendments to the operating licenses of the Palo Verde Nuclear Generating
- Station, Unit Now. 1, 2, and 3. 55 Fed. Reg. 53220-21.-
Shortly thereafter, Linda E. Mitchell, an APS Engineer at the Palo Verde nuclear station and AI Mitchell petitioned the Commission for Leave to Intervene by and through counsel of KOHN, KOHN and COLAPINTO a Washington, D.C. based law firm at 1-202-667-7515.
Through discovery in this proceeding, NRC officials were able to recover needed plant documents to properly evaluate the safety implications of the APS
~
Amendment request.
On December 4,
- 1991, Mr. Jack E.
Rosenthal, NRC Chief Reactor Operations Analysis Branch, constructed a memorandum for Mr. Robert C. Jones, Chief Reactor Operations Analysis Branch concerning the APS Proposed Technical Specifications Amendment for the Palo Verde nuclear station.
The technical contact person for the NRC is Ms. Mary S. Wegner at 1-301-492-7818.
Mr. Rosenthal states In his memorandum, ln part, that:
"...The changes ln the tolerances for the setpoints of the main steam safety valves and the pressurizer safety valves as stated in the referenced document are of concern to us...
We believe that the licensee has not established a need for the Technical Specification changes; that he has not shown that the proposed
- changes, if adopted, could be met; that the analytic model for the pressurizer safety valves ls flawed;
Mr. James Taylor October 23, 1992 Page No. 3 and that the main steam safety valve tolerance as proposed will produce an average setpoint which is not +3 percent but +6.4 percent above the design pressure of the main steam system....
We believe that it would not be prudent to entertain Palo Verde's request for TS relief at this time.
Essentially, the NRC was telling Mr. Conway and APS to repair the safety valves instead of relaxing safety margins at Palo Verde to reduce License Event Reports (LERS).
On June of 1992, APS employees William E. Johnson and Ben Mendoza constructed a document called a Condition Report Disposition Request (CRDR) which is an APS internal investigation for the root cause of the failure of the safety valves.
The CRDR No. 1-2-0139 states that during disassembly of the safety valves, various valves were found with their blowdown rings out of their required position... This would cause popping pressure to become erratic, not to mention the problems that this indicates with the valve vendor (Dresser)
QA program.
(Quality Assurance).
- Moreover, CRDR No. 1-2-0139 states that per NRC Notice 89-90-there is an industrial history of these valves on set pressure drifting.~.The actual experience with PSV and MSSVs (pressure safety valves and main steam safety valves) in nuclear applications is that frequently they neither lift at the required setpoint nor reseat tightly without leaking.
The variation of the setpoint from the requirements often exceed not only the ~
1 percent but also the ~ 3 percent.
The report goes on to state that it should also be noted that this is the first time that the Unit 1 valves have been tested at their required temperature profile and that preventive maintenance has not been performed since 1984.
Petitioner notes here for the record an inference can be drawn here that APS in more concerned about making money operating unsafely instead of shutting down the reactors to properly inspect and repair these valves and to properly maintain these valves through a
preventative maintenance and testing program.
The report also states that exercising the valves proved to have no useful effect on preventing the valve setpoint drift and could result in failure to reseat and develop seat leakage.
~.If an MSSV or PSV develops a seat leak the leak will deteriorate and severally damage the valve seating surface (over time).
If this condition is not corrected within a reasonable amount time, the seating surface will become eroded and the set pressure will become erratic causing both premature lift and failure to lift.
Petitioner notes here for the record that Mr. Mendoza was apparently fired by APS for stealing.
Mr. Mendoza has apparently testified,to NRC officials that APS falsified documents related to the APS request to amend the Palo Verde technical specifications.
Ms.
Linda E.
Mitchell confirmed to the petitioner that NRC O.l.
Investigators Mr. Phil Jukoff and Mr. Bill McNaulty of the NRC Region V office at 1-510-975-0200 told her that they recovered documents evidencing that APS officials falsified documents related to the APS request to amend the Palo Verde technical specifications.
Mr. James Taylor October 23, 1992
'Page No. 4 On October 8, 1991, APS Engineer (degree in oceanography),
Mr. Duane
- Forbis, willfully violated a safety-related APS Palo Verde procedure by intentionally adjusting PSV-574 contrary to the requirements of the procedure.
This is an apparent violation of NRC requirements and points to the lax attitude of personnel and the failure to adhere to procedures.
WHEREFORE, the above stated reasons, the licensee APS and the NRC can not be sure whether the 72 safety valves at the Palo Verde nuclear station will operate within their design basis (UPFSAR) and setpoint tolerances (TS) to mitigate an overpressurization event in any of the 3 reactor cores.
Therefore, the licensee APS cannot provide reasonable assurance to the Commission for the safe operation of the Palo Verde nuclear station.
FOR ALL THE REASONS STATED HEREIN and in the interest for the Health and Safety of the General Public, the Commission is hereby requested by and through this petitioner's 2.206 legal
- document, to cause the immediate shut down of the 3
reactor cores at the Palo Verde nuclear station until such time as all 72 safety valves can be disassembled, inspected and properly tested within a reliable surveillance testing program and preventive maintenance program to insure their operability within the Federal Safety Guidelines of the NRC requirements and the Palo Verde UPFSARs and Technical Specifications.
For the Environment, Thomas
. Sa o,
Jr'etitioner pro Copies provided to:
The Honorable George Bush President of the United States The White House 1600 Pennsylvania Ave., N.W.
Washington, D.C. 20500 David K. Colapinto, Esq.
KOHN, KOHN 5 COLAPINTO 517 Florida Aveue, N.W.
Washington, D.C. 20001 David Williams Inspector General U.S. Nuclear Regulatory Commission Washington, D.C. 20555 National 5 Local Media The Honorable Congressman Dingell United States Congress Washington, D.C. 20555 The Honorable Bob Graham United States Senator Senate Office Building Washington, D.C. 20555