<CCZXX~~rZO Orsm>HVnox OZIVrOr'Sra~nOW SVSrsm REGULAT(O INFORMATION DISTRIBUTIONSTEM (RIDE)
SUBJECT:
Informs that verification activities requested by GL 88-14, "Instrument Air Supply Problems Affecting Safety-Related Equipment" completed.Refs listed in encl reflects supporting info forwarded to NRC.
DISTRIBUTION CODE:
A048D COPIES RECEIVED:LTR i ENCL 1
SIZE: ~
TITLE: OR/Licensing Submittal:
Equipment Qualification NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
/
05000528 05000529 05000530 hCCESSIOQ NBR:9210300042 DOC.DATE: 92/10/22 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME.
AUTHOR AFFILIATION CONWAYFW.F.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIPIENT ID CODE/NAME PD5 LA TRAMMELL,C INTERNAL: ACRS NRR/DET/ESGB 8D OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL 1
0 1
1 6
6 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD NRR/DET/EMEB 7E OC ~8MB REG FILE 01 NSIC COPIES LTTR ENCL 1
0 1
1 1
0 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES"REQUIRED:
LTTR 17 ENCL 14
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX, ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIOENT NUCLEAR 102-02322-WFC/TRB/PST October 22, 1992 U. S. Nuclear Regulatory Commission ATlN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Closure of Generic Letter 88-14, Instrument Air File: 92-056-026 92-010-026 Generic Letter (GL) 88-14, issued by the NRC on August 8, 1988, addressed a concern with Instrument Air.
Arizona Public Service Company (APS) provided responses to GL 88-14 as delineated in the enclosure to this letter.
By letter, dated January 3, 1991, the NRC indicated that the responses provided by APS were acceptable and that APS should indicate when the verification activities associated with GL 88-14 were complete.
The verification activities requested by GL 88-14, "Instrument Air Supply Problems AffectingSafety-Related Equipment" have been completed with the supporting information forwarded to the NRC (see enclosed list of references).
As discussed in our letter dated July 13, 1991, a plant modiTication to replace or improve the existing air dryers and filters has been approved and scheduled for implementation in each of the units by the end of September 1993.
This modification is still scheduled, and since APS has fulfilled the verification requirements of GL 88-14, the issue can be closed prior to the completion of this modification.
."-A.AII< P.
92i0300042 92i022 PDR ADOCK 05000528 P
U. S. Nuclear Regulatory Commission ATTN: Document Control Closure of GL 88-14, Instrument Air Page 2 If you have any questions, please contact Thomas R. Bradish at (602) 393-5421.
Sincerely, WFC/TRB/PST/pmm
Enclosure:
List of References cc:
J. B. Martin J. A. Sloan C. M. Trammell
ENCLOSURE REFERENCES Letter 161-04058, dated July 13, 1991, from W. F. Conway, APS, to NRC, "Status of Generic Letter 88-14 'Instrument Air Supply Problems Affecting Safety-Related Equipment"'.
Letter dated January 3, 1991, from NRC, to W. F. Conway, APS, "GL 88 Instrument Air Supply System Problems Affecting Safety-Related Equipment for PVNGS Units No. 1, 2, and 3" Letter 161.-03606, dated November 20, 1990, from W. F. Conway, APS, to NRC, "Response to Request for Additional Information on Generic Letter 88-14" 4.
Letter dated September 18, 1990, from NRC, to W. F. Conway, APS, "GL 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment-Request for Additional Information" 5.
Letter 161-03061, dated April 6, 1990; from W.
F. Conway, APS, to NRC, "Additional Information Requested on PVNGS Instrument Air System" 6.
Letter 161-01881, dated April 27,
- 1989, from D.
B. Karner, APS, to NRC, "Instrument Air Supply System Problems Affecting Safety-Related Equipment" 7.
Letter 161-01697, dated February 20, 1989, from D. B. Karner, APS,'to NRC, "Generic Letter 88-14, 'Instrument air Supply System Problems Affecting Safety-Related Equipment"'
8.
Letter dated August 8, 1988, from NRC, to W. F. Conway, APS, "Instrument Air Supply System Problems Affecting Safety-Related Equipment (Generic Letter 88-14)"
~,