UNITED STATES NUCLEAR REGULATORY COMMISSION
'WASHINGTON,D.'. 20555 9'2i0230249 92iOi5 PDR ADOCK 05000528 P
PDR ARIZONA PUBLIC SERVICE COMPANY ET AL.
DOCKET NO.
STN 50-528 PALO VERDE NUCLEAR GENERATING STATION UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 67 License No.
NPF-41 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of, itself and the Salt River Project Agricul.tural Improvement and Power District, El Paso Electric Company, Southern California Edison
- Company, Public Service Company of New Mexico, Los Angeles Department of Water and
- Power, and Southern California Public Power Authority dated December 30,
- 1991, complies with the standards and requirements of the Atomic Energy Act, of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health.
and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the, health and safety of the public; and 2.
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No.
NPF-41 is hereby amended to read as follows:
0 i+i
3.
(2)
Technical S ecifications and Environmental Protection Plan 4
The Technical Specifications contained in Appendix A, as revised through Amendment No. 67, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall'perate the facility in. accordance with the Technical Specifications and the Environmental Protection
- Plan, except where otherwise stated in specific license conditions.
This license amendment is effective as of the date of issuance and must be fully implemented no later than 45 days from the date of,issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 15, 1992 Theodore R. quay, Director Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
4~
IO/,
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.
67 TO FACILITY OPERATING LICENSE NO. NPF-41 DOCKET NO.
STN 50-528 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove 3/4 6-14 Insert 3/4 6-14
i+i
TABLE 4.6-2 TENDON LIFT-OFF FORCE FIRST YEAR U-TENDONS TENDON NUMBER V32 V43 TENDON END Sho Field Sho Field MAXIMUM'kips) 1463 1510 1436 1486 MINIMUM (kips) 1343 1386 1364 1364 V62 V75 Sho Field Sho Field 1486 1364 1527 1402 1380 1504 14?5 1354 HOOP TENDONS TENDON NUMBER H13-007 H13-021 H21"037.
H21-044 H32-016 H32-030 TENDON END Sho Field Sho Field Sho Fi el d Sho Field Sho Field Sho F.i el d MAXIMUM (kips) 1428'451 1515 1491 1505 1446 1484 1530 1411 1457 1473 1473
'MINIMUM (kips) 1300 1321 1380 1358 1371 1317 1360 1403 1282 1324 1330 1330 PALO VERDE - UNIT 1 3/4 6-13
0 CONTAINMENT SYSTEMS CONTAINMENT VENTILATION,SYSTEM LIMITING CONDITION FOR OPERATION'.6.
1.7 Each containment purge supply and exhaust isolation valve shall be OPERABLE and:
a.
Each 42-inch clontainment purge supply and exhaust isolation valve shall be sealeld closed.
b.
The 8-. inch containment purge supply and exhaust isiolation v'alves shall be sealeld clo. ed to the maximum extent practicable but may be open for purge system operation for pressure contrlol, for ALARA arid respirable air quality considerations for personnel entry and for surveillance tiests that require the, valve to be oplen.
APPLICABILITY:
MODES 1, 2, 3>> and 4.
ACTION:
b.
C.
With a 42-inch containment Ipurge supp'ly and/or exhaust isolation valve(s) open or not sealed
- closed, c'lose and/or seal close the oFien valve(s) d'or isolate the penetrat'ion, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> ancl in COLO SHUTDOWN within the fol'lowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With an 8-inch containment Ipurge supp'ly and/or exhaust isolation valve(s) lopen for reasons other than given in 3.6. 1.7.b above, close the open 8-inch valve(s) or isolate the penetration(s) within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, otherwise be in at 'least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in
'OLD SHUTDOWN within the following '30'ho'urS.
With a containment purge sulpply and/or exhaust isolation valve(5)
'aving a measured leakage rate exceeding the limits,of SpecificIa-tions 4.6. 1.7.s and/or 4.6.1.7.3, restore the inoperable valve(s)
'o OPERABILE status or isolate the penetrations such that the measured
'leakage rate does not, exce'ed'th'e limits of Specificatilons
- 4. 6. 1. 7. 2 and/i)r 4. Bs 1.7. 3 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,,
otherwise be in at.
least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLO SHUTOONN
[
within the fol'lowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />..
SURVEILLANCE.RE UIREMENTS 4.6. 1.7. 1 Each 42-inch contai'nment purge supply and exhaust isolation valve shall be verified to be
<sealed closed at, least once per 31 days.
4.6.1.7.2 At least once per 6 months on a ST~AGGERED ~TEST BASIS each sealed closed 42-inch containment purge supply and exhaust isolation valve with resilient material seals shall be cIlemonstrate~d OPERABLE by verifying that the measured leakage rate is less than or equal t~o,0.05 t.'.
when pressurized to P'
4.6.1.7.3 At least once per 82 ldays each 8-i~nch containment purge supply and exhaust isolation va'live wi'th resi'lient material seals shall be demonstraIted OPERABLE by verifying that the measured leakage~rate is less than or equal to 0 01 La when pressurized to P.a 4.6. 1.7.4 Each 8-inch containment purge supp~ly ~and exhaust isolation valve shall be verified to be sealecl closed or open in accordance with specifica-tion 3.6. 1.7.b at least once per 31 days.
PALO VERDE - UNIT 1 3/4 6"14 AMENDMENT NO.<<7'
gA~ REOy (4
~4 0
4p I
fl C
O 0
90
+a*++
'UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ARIZONA PUBLIC SERVICE COMPANY ET AL.
DOCKET NO.
STN 50-529 PALO VERDE NUCLEAR GENERATING STATION UNIT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 53 License No.
NPF-51 The Nuclear Regulatory Commission (the Commission) has found.that:
A.
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement, and Power District, El Paso Electric Company, Southern California Edison
- Company, Public Service Company of New Mexico, Los Angeles Department of Water and'ower, and Southern California Public Power.Authority dated December 30,
- 1991, complies with the standards and requirements of the Atomic Energy, Act of 1954, as amended. (the Act) and the Commission's regulations set forth in 10 CFR Part I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted: without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; 2.
D.,
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance.of this amendment is in accordance with 10 CFR Part
-51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the, Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating. License No. NPF-,5l,is hereby amended to read as follows:
i'
3.
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 53, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection
- Plan, except where otherwise stated in specific license conditions.
This license amendment is effective as of the date of issuance and must be fully implemented no later than 45 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 15, 1992 Theodore R. quay, Director Project Directorate V
Division of. Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
AMENDMENT NO.
ATTACHMENT TO LICENSE AMENDMENT TO FACILITY OPERATING LICENSE NO.
NPF-51 DOCKET NO.
STN 50-529 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove 3/4 6-14 Insert 3/4 6-14.
V
TABLE 4;6-2 0
TENDON LIFT-OFF FORCE - FIRST YEAR
.U-TENDONS TENDON NUMBER V32 V43 V62 V75 TENDON END Sho
)e
)e le
,le MAXIMUM (ki'ps)
MINIMUM (kips)
- 1343, HOOP TENDONS TENDON NUMBER H13-007 H13-021 H21-037 H21-044 H21-016 H32-030 TENDON END Sho le 1e 1e le le le
'MAXIMUM
(-kips) 1428 MINIMUM (ki'ps)'300 PALO VERDE - UNIT 2 3/4 6-13
CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION i~ (
3.6.1.7 Each containment purge supply and exhaust. isolation valve shall be OPERABLE and:
a.
Each 42-inch contaiinment purge supply'nd exhaust isolation valve shall be sealed closedl.
b.
The 8-inch contai'nment. purge
. upply and exhaust isolation valves shall be sealed closedl to the maximum extent practicable but may be open for purge system operation for pressure control, for ALARA ahd
'espirable air quality considerations'or per'sonnel entry and for surveillance tests that require the valve to be open.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
a.
b.
C.
With a 42-inch containment purge supply and/or exhaust isolation valve(s) open or not sea'led closed,lose and/or seal c'losed the
()pen valve(s) or isolate the penetration within'4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> otherwise be'rl at least HOT STANDBY within the nekt 6 hlou! s and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With an 8-inch containment purge supp'ly and/or exhaust isolation valve(s) open for reason.
other than given in 3.6.1.7.b
- above,
,'clOse,'he open 8-inch valve(s) or isolate the penetration(s) within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, otherwise be
%n at 'least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and i'n >>
COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With a containment purge supply andi/o~r. exhaust ilso'lation valve(s) having a measuredl leakage rate exceeding the limits of Specifica-tions 4.6. 1.7.2 and/or 4.6. 1.7.3,. restore the inopierable valve(s) to OPERABLE status or isolate the penetrations such that. the measured leakage rat;e does not exceed the limits of Specifications 4.6. 1.7.2 and/~ar 4.6.1.7.3 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> otherwise be in at
'east HOT Sl'ANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE RE UIREMENTS 4.6. 1.7. 1 Each 42-inch conta.inment purge supply and exhaust isolation valve shall be verified to be sealed closed at least once per 31 days.
4.6.1.7.2 At least once per 6 months on a STAGGERED TEST BASIS each sealed closed 42-inch containment purge supply and exhaust isolation valve with resilient material seals shoal'I be demonstrated OPERABLE by vierifying that the measured leakage rate is less than or equal to 0.05 L
when pressurized to P
4.6. 1.7.3 At least once per 92 days each 8-inch containment purge supply and exhaust isolation va'lve. with resilient material seals shall be demonstrated OPERABLE by verifying that the measured leakage rate is less thian or equal to 0.01 L
when pressurized to P..a 4.6. 1.7.4 Each 8-inch containment purge supply and exhaust isolation valve shall be verified to be, sealed closed or open in accordance wit,h Specifica-tion 3.6.1.7.b at least once per 31 days.
PALO VERDE - UNIT 2 3/4 6-14 AMENDMENT NO. !i3
~p,Q AKqu Vp
~
+
0 C1 C
O 0
Cy V/
+~
~O
+w*w+
UNITED STATES NUCL'EAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 RIZONA" PUBLIC SERVICE COMPANY ET AL.
DOCKET NO.
STN 50-530 PALO VERDE NUCLEAR GENERATING STATION UNIT NO.
3 MENDMENT TO FACILITY OPERATING LICENSE Amendment No. 40 License,No.
NPF-74 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison
- Company, Public Service Company of New Mexico, Los Angeles Department of Water and
- Power, and Southern California Public Power Authority dated December 30,
- 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and,the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public,. and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance. with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes,to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-74's hereby amended to read as follows:
4>
it
3.
(2)
Technical.S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 4O, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection
- Plan, except where otherwise stated in specific license conditions.
This license amendment is effective as of the date of issuance and must be fully implemented no later than 45 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Theodore R. quay, Director Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation Date of Issuance:
October 15, 1992
0 i
I'
ATTACHMENT TO LICENSE AMENDMENT MENDMENT NO.
40 TO FACILITY OPERATING LICENSE NO. NPF-74 DOCKET NO.
STN 50-530 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove 3/4 6-14 Insert 3/4 6-14
~I
TABLE 4.6-2 TENDON LIFT-OFF FORCE - FIRST YEAR U-TENDONS TENDON NUMBER V16 V28 V09 V49 TENDON END Sho Field Sho Field Sho Field Sho Field MAXIMUM (kips) 1469 1576 1489 1524 1524 1524 1438 1519 MINIMUM (kips) 1349 1448 1367 1400 1399 1399 1318 1394 HOOP TENDONS TENDON NUMBER H13-010 H13-036 H13-044 H21-007 H32-013 H32-021 TENDON END Sho le Sho
>eld ho Field le Sho Field Sho Field MAXIMUM (kips) 1507 1
3 1-388 1 0 1495 1488 1465 1442 1512 MINIMUM (kips) 1369 1 59 1 8 1
0 13 1334 1312 1377 PALO VERDE - UNIT 3 3/4 6-13
CONTAINMENT SYSTEMS CONTAINMENT VENTIL'ATION,SYSTEM LIMITING CONDITION FOR O,PERAT,'lON iI>
3.6.1.7 Each containment purge suppl,y and exhaust, isolation valve shall be OPERABLE and:
a.
Each 42-inch containment purge supply and.exhaust isolation valve shall be sealeid c:losed.
42
)
h ontaz ent purge supply and/or exhaust rsolatsoh valve(s) open or not sealed
- closed, close and/or seal closed thb 6peh valve(s) or isolate the penietration w',ithin 4,hours otherwise be irI at least HOT SIANDBY within thie nex't 6 h'our's hand in COLD SHUTDOtlN within the fol'lowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With an 8-inich containment purge supply and/or exhaust iso1atioh valve(s) open for reasons other than given in,'3.',6.1.7.b
- above, close the open 8-inch valve(s) or isolate the penetration(s) within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, otherwise be in at 1east HO'1 STANDBIY kitkirI the 'next 6.hours and i'n
'OLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With a containment purige supply and/or exhaust isolation valve(.s) having a measured leakage rate exceieding'he limits of SpecHich-tions 4.6,.1.7.2 and/or 4.6.1.7;3, restore the inoperable valve(s) to OPERABI E status or isailate thA penLItriations such that the measured leakage rate idoes not exceedithe limits of Specifications 4.6. 1.7.2 andhir 4.6. 1.7.3 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, otherwise be,iin at least HOT STANDBY within the next 6'6urs and in COLD SHUTDOWN
'ithin the following 30 hiours.
b.
C.
SURVEILLANCE RE UIRI.:MENTS b.
The 8-inch containment purge supply and exhaust isiolation valves shall be sealed closed to the maximum extent practicable but may be open for,purge system operation for pressure control, for ALARA and respirable air quality considerations for personne'1 entry and for surveillance. tests that require 'the valve to be open.
APPLICABILITY:
MODES 1, 2, 3,,
and 4.
ACTION:
a.
With a
- nc c
'nm I
I 4.6.1.7.1 Each 42-inch containment purge supply ahd
'exhaust isolation valve shall be verified to be sealed c'losed at least oncie pier 31, days.
4.6. 1.7.2 At least once per 6 months on a STAGGERED 'TEST BASIS each sealed closed 42-inch containment purge supp'ly and exhaust isolation valve with resilient material seals shall be dlemonstrated OPERABLE'y'erifying that the measured leakage rate is less than or equal -to 0.05 L
when pressurized to P
- 4. 6.1. 7.3 At least once per 5i2 days each 8-inch containment purge supply'nd exhaust isolation va'live with resi'lient maiteriail s'eals 'shhll be demonstrated OPERABLE by verifying that the. measured leakage, rate iis less than or equal to 0.01 L
when pressurized to P
a'.6.1.7.4 Each 8-inch containment purge supply and exhaust isolation valve shall be verified to be sealed closed or open in accordance with Specifica-tion 3.6.1.7.b at least once pier 31 days.
PALO VERDE - UNIT 3 3/4 6-14 AMENDMENT NO. 40